Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹4.5 CrAccepted-Finance | ₹4.5 Cr | 1 | Accepted-Finance Accept |
| 2 | 2₹6.2 Cr+₹1.7 Cr (36.4%)Accepted-Finance | ₹6.2 Cr+₹1.7 Cr (36.4%) | 2 | Accepted-Finance Accept |
Tender Value
₹4.6 Cr
EMD Value
₹23.0 L
Closing Date
29 Apr 2026, 6:00 pmClosed
SE Hyd Circle Ananatnag
SE Hyd Circle Ananatnag
Const of crate protection work on R/S of Flood Channel including raising on L/S of existing crate work at Holy Amarnath Ji Cave and Construction of RCC Jacketing
2026_PHE_308440_1
e.NIT 01 of 2026-27 dated 22.04.2026
Open Tender
Civil Works
Percentage
60 days
Amarnath Ji Holy Cave
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,000
SE Hyd Circle Ananatnag
₹23.0 L
3 Jul 2026
22 Apr 2026
30 Apr 2026
23 Apr 2026
29 Apr 2026
23 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1s | |||||
| 1.01 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soils. | - | Cum | - | - |
| 1.02 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement :1½ coarse sand: 3 graded stone aggregate 20 mm nominal size) | - | Cum | - | - |
| 1.03 | Providing and laying in position cement concrete of specified grade including curing butexcluding the cost of centring and shuttering. All work upto plinth level with: 1:1½:3 (1 cement :1½ coarse sand: 3 graded stone aggregate 20 mm nominal size) | - | Cum | - | - |
| 1.04 | Centering and shuttering including strutting, propping etc. and removal of form work. Foundation , footings and bases of columns etc | - | SQM | - | - |
| 1.05 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level : Thermo-Mechanically Treated bars of grade Fe-500D or more. | - | kg | - | - |
| 1.06 | Hand-packing stones in wire-crates; excluding cost of crates and stones | - | Cum | - | - |
| 1.07 | Collection of stones for crates @ 0.85 labour/cum/day | - | No | - | - |
| 1.08 | Supply of 4 mm dia GI Wire woven crates 4"x4" mesh as per ISI specifications | - | Sft | - | - |
| 1.09 | Carriage of materials by MT including loading,unloading and stacking. | - | - | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.25 MB
BOQ_999565.xls
BOQ • 0.41 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .