SPECIAL REPIAR FOR REPLACEMENT OF PUMPS AGAINST BER AND PROVN OF 10 X WALL FANS IN BLDG NO PRR-207 FOR OR LIVING ACCN OF HQ 787 (I) AD BDE UNDER GE DEHU ROAD
2026_MES_748866_4
8064
Open Tender
Electrical and Maintenance Works
Item Rate
180 days
GE Dehu Road
As per tender documents
8 documents required · 8 mandatory
₹500
GE Dehu Road
₹82,600
Yes
18 Sept 2026
28 Aug 2026
19 Sept 2026
28 Aug 2026
18 Sept 2026
4 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supply, Installation, Testing and Commissioning of Horizontal Split Casing Centrifugal Pump Set suitable for duty point of 50 LPS discharge at 120–130 m head, complete with IE-2 efficiency squirrel cage induction motor, common base frame, flexible coupling, coupling guard, anti-vibration pads, foundation works and all associated accessories, suitable for operation on 415 V, 3 Phase, 50 Hz AC supply, complete as specified and directed by the Engineer-in-Charge.
a) Horizontal Split Casing Centrifugal Pump Set suitable for duty point of 50 LPS discharge at 120–130 m head with Cast Iron casing, Bronze impeller and SS-431 shaft complete with mechanical seal/gland packed arrangement as per manufacturer's standard design.
b) Squirrel Cage Induction Motor, IE-2 efficiency, 90 kW, 2900 RPM, 2 Pole, suitable for 415 V, 3 Phase, 50 Hz AC supply, complete with common base frame, flexible coupling, coupling guard and DUNLOP Metalastik or approved equivalent anti-vibration pads.
c) Dismantling and removal of existing pump set, providing and constructing RCC foundation/plinth having minimum mass not less than three times the combined operating weight of the pump and motor assembly, installation of new pump-motor set with proper alignment to existing/New suction, delivery and priming pipelines, carrying out necessary modifications, grouting, testing, trial run and commissioning by OEM complete. The installation shall conform to IS 9137.
e) laying power cable from existing starter to motor terminal, including copper cable glands, copper lugs, termination, testing and commissioning by OEM complete. The work shall include trial run, performance testing and commissioning of the complete pumping system. RCC foundation, supporting frame, all materials, labour, accessories and incidental works required for successful operation shall be included in the quoted rate. The installation shall conform to IS 9137. Locaton- Kinhai Pump house
Note:- The quoted rate shall include all civil works, foundation works, materials, labour, testing and commissioning required for satisfactory operation. | 1 | Each | - | - |
| 2 | Supply, Installation, Testing and Commissioning of Electric Motor Driven Horizontal End Suction Type Centrifugal Pump Set suitable for duty point of 34 LPS discharge at 70–80 m head, complete with IE-2 efficiency motor, pump, common base frame, flexible coupling, coupling guard, anti-vibration pads and foundation works, suitable for operation on 415 V, 3 Phase, 50 Hz AC supply including all accessories complete as specified and directed by the Engineer-in-Charge. Make: Kirloskar Brothers, Jyoti, Crompton Greaves or equivalent.
a) Horizontal End Suction Type Centrifugal Pump Set suitable for duty point of 34 LPS discharge at 70–80 m head with Cast Iron casing, Bronze impeller and SS-431 shaft complete with mechanical seal/gland packed arrangement as per manufacturer's standard design.
b) Electric Motor, IE-2 efficiency, 45 kW, 1450 RPM, suitable for operation on 415 V, 3 Phase, 50 Hz AC supply complete with common base frame, flexible coupling, coupling guard and DUNLOP Metalastik or approved equivalent anti-vibration pads suitable for clear water pumping application.
c) Dismantling and removal of existing pump set, providing and constructing RCC foundation/plinth having minimum mass not less than three times the combined operating weight of the pump and motor assembly, installation of new pump-motor set with proper alignment to existing/New suction, delivery and priming pipelines, carrying out necessary modifications, grouting, testing, trial run and commissioning by OEM complete.The installation shall conform to IS 9137.
e) laying power cable from existing starter to motor terminal, including copper cable glands, copper lugs, termination, testing and commissioning complete. The work shall include trial run, performance testing and commissioning of the complete pumping system. RCC foundation, supporting frame, all materials, labour, accessories and incidental works required for successful operation shall be included in the quoted rate. The installation shall conform to IS 9137. location- C1 Pump house
Note:- The quoted rate shall include all civil works, foundation works, materials, labour, testing and commissioning required for satisfactory operation. | 1 | Each | - | - |
| 3 | Supply, Installation, Testing and Commissioning of Electric Motor Driven Horizontal End Suction Type Centrifugal Pump Set suitable for duty point of 34 LPS discharge at 60–70 m head, complete with IE-2 efficiency motor, pump, common base frame, flexible coupling, coupling guard, anti-vibration pads and foundation works, suitable for operation on 415 V, 3 Phase, 50 Hz AC supply including all accessories complete as specified and directed by the Engineer-in-Charge. Make: Kirloskar Brothers, Jyoti, Crompton Greaves or equivalent.
a) Horizontal End Suction Type Centrifugal Pump Set suitable for duty point of 34 LPS discharge at 60–70 m head with Cast Iron casing, Bronze impeller and SS-431 shaft complete with mechanical seal/gland packed arrangement as per manufacturer's standard design.
b) Electric Motor, IE-2 efficiency, 35 kW, 1450 RPM, suitable for operation on 415 V, 3 Phase, 50 Hz AC supply complete with common base frame, flexible coupling, coupling guard and DUNLOP Metalastik or approved equivalent anti-vibration pads suitable for clear water pumping application.
c) Dismantling and removal of existing pump set, providing and constructing RCC foundation/plinth having minimum mass not less than three times the combined operating weight of the pump and motor assembly, installation of new pump-motor set with proper alignment to existing/New suction, delivery and priming pipelines, carrying out necessary modifications, grouting, testing, trial run and commissioning complete. The installation shall conform to IS 9137.
e) laying power cable from existing starter to motor terminal, including copper cable glands, copper lugs, termination, testing and commissioning by OEM complete. The work shall include trial run, performance testing and commissioning of the complete pumping system. RCC foundation, supporting frame, all materials, labour, accessories and incidental works required for successful operation shall be included in the quoted rate. The installation shall conform to IS 9137. Location - A2 Pump House
Note:- The quoted rate shall include all civil works, foundation works, materials, labour, testing and commissioning required for satisfactory operation. | 2 | Each | - | - |
| 4 | Supply, Installation, Testing and Commissioning of Vertical Turbine Pump Set suitable for discharge of 50.66 LPS at 30 m head, complete with IE-2 efficiency motor, suction column assembly, base plate, coupling, anti-vibration pads, PCC foundation, supporting frame and all accessories, suitable for operation on 415 V, 3 Phase, 50 Hz AC supply, complete as specified and directed by the Engineer-in-Charge. Make: Kirloskar Brothers, Jyoti, Crompton Greaves or equivalent.
a) Vertical Turbine Pump Set complete with bronze impeller, bare shaft, suction column assembly for 11 m suction depth and foot valve. Foot valve shall be included in the quoted rate.
b) IE-2 efficiency induction motor, 22 kW (30 HP), 1500 RPM, suitable for operation on 415 V, 3 Phase, 50 Hz AC supply, complete with pump-motor coupling and all accessories required for satisfactory operation.
c) Base plate, supporting frame, coupling and DUNLOP Metalastik or approved equivalent anti-vibration pads for proper mounting of pump and motor assembly.
d) Dismantling and removal of existing pump set, providing and constructing RCC foundation/plinth having minimum mass not less than three times the combined operating weight of the pump and motor assembly, installation of new pump-motor set with proper alignment to existing/New suction and delivery pipelines, carrying out necessary modifications, grouting and fixing complete.
e) laying power cable from existing starter to motor terminal, including copper cable glands, copper lugs, termination, testing by OEM and commissioning complete. The work shall include trial run, performance testing and commissioning of the complete pumping system. RCC foundation, supporting frame, all materials, labour, accessories and incidental works required for successful operation shall be included in the quoted rate. The installation shall conform to IS 9137. Locaton- Kinhai Pump house
Note:- The quoted rate shall include all civil works, foundation works, materials, labour, testing and commissioning required for satisfactory operation. | 1 | Each | - | - |
| 5 | Supply andd fix Fully Automatic Star delta starter with Contactor and pneumatic timers suitable for 40 HP,30KW , three phase,415 Volt,50 Hz,MCCB 63 A 3 Pole 25 KA Breaking capacity ,main ,Star, Delta Contactor should not below 40 A,AC3 duty,3 pole and Control MCB 6-10 Amp,Auxillary Add on Blocks 2 No and 2 NC type,Star Delta Timer 0.5-30s Overhead relay range 26-40 Amps,indicator lamps etc.The foundation is also incl in this quoted rate.The Panel Box Enclosure Steel Sheet Powder Coated should approval by IP 65. | 1 | Each | - | - |
| 6 | Supply laying connect and testing MS ERW pipe 6mm thick centrifugally in any lengths conforming to IS laid in trenches/ on wall/ on floor at locations of water pipe 150 mm dia all as directed. all as specified & directed.Pipe Length is not more than 6 mt
Note:Foot Valve 150 mm is included in this Quoted rate.It is suitable for Inlet Pump. Pressure Gauges is included in this rate | 1 | Each Job | - | - |
| 7 | Supply laying connect and testing ductile iron pipe K-7 including rubber gasket push to lock rubber tighten lock centrifugally in any lengths conforming to IS including DI fittings & lead joints laid in trenches/ on wall/ on floor at locations of water pipe 125 mm dia all as directed. all as specified & directed
Note: NRV 125 mm Included in this quoted rate and Sluice Valve is included in this rate and gauge is included in this rate | 2 | Each Job | - | - |
| 8 | Supply laying connect and testing MS ERW pipe 6mm thick centrifugally in any lengths conforming to IS laid in trenches/ on wall/ on floor at locations of water pipe 125 mm dia all as directed. all as specified & directed.
Note:Foot Valve 125 mm is included in this Quoted rate.It is suitable for Inlet Pump. Pressure Gauges is included in this rate | 2 | Each Job | - | - |
| 9 | Supply laying connect and testing ductile iron pipe K-7 including rubber gasket push to lock rubber tighten lock centrifugally in any lengths conforming to IS including DI fittings & lead joints laid in trenches/ on wall/ on floor at locations of water pipe 100 mm dia all as directed. all as specified & directed
Note: NRV 100 mm Included in this quoted rate and Sluice Valve is included in this rate and gauge is included in this rate | 1 | Each Job | - | - |
| 10 | Taking down old point wiring & M&L for point wiring with two 1.5 sqmm multistranded copper conductor cable of PVC insulated and unsheahed type alongwith 1.5sqmm PVC insulated unsheathed single stranded copper conductor cable for continous earthing in & incl casing / caping or PVC Pipes & accessories having ISI marked surface type to be fixed with proper screws/(MS steel strips if required) including hard PVC boards of suitable sizes & making arrangement for fixing switches, sockets, switch socket combination, fan, regulator setc for Note:- Screws used for fixing PVC boards, casing & caping ceilling rose square blocks etc should be nickel cadmium screws:- | - | - | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.41 MB
BOQ_881732.xls
BOQ • 0.32 MB
8064TenderDocuments.pdf
Tender Documents • 1.62 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .