Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance 11 ANUPAM VIHAR ENGINEERS ENCLAVE GMS ROAD DEHRADUN UTTARAKHAND 248001 | DEHRADUN | UTTARAKHAND | 248001 | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
Tender Value
₹1.6 L
EMD Value
₹3,300
Closing Date
16 Mar 2020, 6:00 pmClosed
Er. Vivek Kohli
Executive Engineer TCC Division Jammu
Construction of RCC culvert D3 near RD 550M
2020_IFC_94603_2
e-NIT No 48 of 2019-20
Open Tender
Civil Works
Item Rate
20 days
MTC
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Yes
Executive Engineer TCC Division Jammu
₹3,300
Yes
17 Mar 2020
7 Mar 2020
17 Mar 2020
7 Mar 2020
16 Mar 2020
7 Mar 2020
Amount
Earth work in excavation by manual means over areas ( exceeding 30 cm and upto 1.5 M in depth 1.5 in width as well as 10sqm on plan) including disposal of excavated earth upto 1 mtr fro m cutting edge disposal earth to be leveled and neatly dressed in. All kinds of soil. Deduct for disposed soil not levelled and neatly dressed.
Providing & laying in position cement concrete of specified grade excluding the cost of centering & shuttering. All work up to plinth level
1:4:8 ( 1 cement : 4 coarse sand : 8 graded stone aggregat 40mm nominal size ) crushed.
1:3:6 (1 cement : 3 coarse sand : 6 graded stone agg 20mm nominal size crushed
Providing and laying Reinforced cement concrete 1:1.5:3 ( 1: Cement : 1.5 Coarse sand : 3 graded stone aggregate 20MM nominal size) in suspended floors, balconies, landings and staircase having upto 15 degree slope excluding cost of centering and shuttering all work upto floor V level.
Reinforcement for RCC work including straightening, cutting, bending, placing in position and binding all complete. Thermo-Mechanically Treated bars
Centering and shuttering including strutting propping etc and removal of form for :
Foundation, Footing, bases of columns etc for mass concrete
Wall (any thickness) including attached pilasters, buttresses, plinth and string courses etc.
Suspended floors, roofs, landings balconies and access platform
Edges of slabs and breaks in floors and walls above 20 cms wide
12MM cement plaster of mix: 1:4 ( 1: cement : 4 coarse sand)
Filling available excavated earth ( excluding rock) in trenches ,plinth sides of foundations etc layers not exceeding 20 CM in depth, consolidating each deposited layer by ramming and watering lead upto 50 m and lift upto 1.5 m .Deduct for not watering the excavated earth for banking.
Carriage of material by Mech Transport from source to site of work including loading, unloading and stacking
Sand and stone agg below 40mm nominal size average distance 30 Km
Disposal of balanced earth by Mech Transport from site to dumping point av distance 5 Km
Labour engaged for dismantling of old pipe culvert
Ashok Kumar
Puran Chand Contractor
Ravi Kant Verma
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .