| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAdmitted-Finance | ₹1.1 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.1 Cr+₹7.3 L (6.91%)Admitted-Finance HOLDING NO 06 623 GYAN VILLA MANAV KALYAN ROAD OPP BRAHMA KUMARI ASHRAM LANE TINSUKIA ASSAM PIN 786125 | TINSUKIA | TINSUKIA | ASSAM | 786125 | ₹1.1 Cr+₹7.3 L (6.91%) | L2 | Admitted-Finance |
| 3 | L3₹1.3 Cr+₹25.5 L (24.1%)Admitted-Finance | ₹1.3 Cr+₹25.5 L (24.1%) | L3 | Admitted-Finance |
| 4 | L4₹1.4 Cr+₹35.2 L (33.3%)Admitted-Finance | ₹1.4 Cr+₹35.2 L (33.3%) | L4 | Admitted-Finance |
| 5 | L5₹1.5 Cr+₹45.4 L (42.8%)Admitted-Finance | ₹1.5 Cr+₹45.4 L (42.8%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/s KOOJE JANGGO ENTERPRISES L5 | M/s North East Engineering & Construction Agency L3 | m/s rinya yangfo construction L1 | M/S Agam Constructions L4 | M/s. GRRB ASSOCIATES L2 | T. T. Enterprise L6 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00(Roing – Koronu - Paya section of NH-13 from Km 650.615 to Km 682.396) | |||||||||
| 1.01 | Clearing and Grubbing Road Land .(Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness.)
B y Manual Means
(A) In area of light jungle | 30.86 | Hect. | 67,080 ₹20,70,088.8 | 37,000 ₹11,41,820 Lowest | 60,000 ₹18,51,600 | 62,837 ₹19,39,149.82 | 46,815 ₹14,44,710.9 | 66,000 ₹20,36,760 |
| 1.02 | Granular Sub-Base with Coarse Graded Material ( Table:- 400- 2) (Construction of granular sub-base by providing coarse graded material,spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting withvibratory roller to achieve the desired density, complete as per clause 401)
for grading- I Material | 475 | Cum | 1,543 ₹7,32,925 | 1,500 ₹7,12,500 | 1,867.03 ₹8,86,839.25 | 1,443 ₹6,85,425 Lowest | 1,928 ₹9,15,800 | 2,200 ₹10,45,000 |
| 1.03 | Maintenance of Culverts Slab type (Maintenance of Slab type Culvert by way of Cleaning, Clearing, Erosion repair, repairs to cracks, parapet wall and protection work as per drawing and technical specification Clasue 1908). | 89 | Each | 2,880 ₹2,56,320 | 2,463 ₹2,19,207 | 3,484.8 ₹3,10,147.2 | 2,770 ₹2,46,530 | 2,010 ₹1,78,890 | 200 ₹17,800 Lowest |
| 1.04 | Hill Side Drain Clearance (Removal of earth from the choked hill side drain and disposing it on the valley side manually) | 6,000 | Mtr. | 46 ₹2,76,000 | 46 ₹2,76,000 | 55.66 ₹3,33,960 | 43 ₹2,58,000 | 32 ₹1,92,000 Lowest | 40 ₹2,40,000 |
| 1.05 | Maintenance of Road signs (Maintenance of Road signs by way of cleaning and repainting of mandatory/regulatory/cautionary/informatory and place identifications sign board as per drawings and technical specifications Clause 1910). | 18.95 | Km | 1,329 ₹25,184.55 | 1,100 ₹20,845 | 1,608.09 ₹30,473.31 | 1,250 ₹23,687.5 | 927 ₹17,566.65 Lowest | 3,000 ₹56,850 |
| 1.06 | Surface Drains in Soil (Construction of unlined surface drains of average cross sectional area 0.40 sqm in soil to specified lines, grades, levels and dimensions to the requirement of clause 301 and 309. Excavated material to be used in embankment within a lead of50 metres (average lead 25 metres)
A) Mechanical means
(B) Manual Means | 9,600 | Mtrs. | 90 ₹8,64,000 | 90 ₹8,64,000 | 10.89 ₹1,04,544 Lowest | 84 ₹8,06,400 | 63 ₹6,04,800 | 30 ₹2,88,000 |
| 1.07 | Painting Two Coats on New Concrete Surfaces (Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces) | 3,858.11 | Sqm | 103 ₹3,97,385.33 | 103 ₹3,97,385.33 | 118.58 ₹4,57,494.68 | 96 ₹3,70,378.56 | 72 ₹2,77,783.92 Lowest | 110 ₹4,24,392.1 |
| 1.08 | White washing of parapet walls of CD work and tree trunks (White washing two coats on parapet walls and tree trunks including preparation of surface by cleaning scraping etc. as per technical specifications Clause 1915) | 871.92 | Sqm | 25 ₹21,798 | 103 ₹89,807.76 | 30.25 ₹26,375.58 | 23 ₹20,054.16 | 17 ₹14,822.64 | 15 ₹13,078.8 Lowest |
| 1.09Total Bill No. 1 | |||||||||
Tender Value
₹1.6 Cr
Closing Date
24 Nov 2021, 3:00 pmClosed
Chief Engineer, HW Zone, PWD, AP
O/o Chief Engineer, HW Zone, PWD, AP
Ordinary repair (DPP) for short term maintenance of National Highways stretches under Jairampur Highway Division in the state of Arunachal Pradesh for the year 2021-22.
2021_MoRTH_650449_2
CEAP(HW)/WTC-177/ OR/JRP
Open Tender
Civil Works - Roads
Item Rate
365 days
Jairampur
Please refer Tender documents.
4 documents required · 4 mandatory
₹5,000
Regional Pay and Accounts Officer, MoRTH
Exempted
Mowb-II, Itanagar, AP
20 Dec 2021
10 Nov 2021
25 Nov 2021
10 Nov 2021
24 Nov 2021
10 Nov 2021
17 Nov 2021
Amount
(Roing – Koronu - Paya section of NH-13 from Km 650.615 to Km 682.396)
Clearing and Grubbing Road Land .(Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness.) B y Manual Means (A) In area of light jungle
Granular Sub-Base with Coarse Graded Material ( Table:- 400- 2) (Construction of granular sub-base by providing coarse graded material,spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting withvibratory roller to achieve the desired density, complete as per clause 401) for grading- I Material
Maintenance of Culverts Slab type (Maintenance of Slab type Culvert by way of Cleaning, Clearing, Erosion repair, repairs to cracks, parapet wall and protection work as per drawing and technical specification Clasue 1908).
Hill Side Drain Clearance (Removal of earth from the choked hill side drain and disposing it on the valley side manually)
Maintenance of Road signs (Maintenance of Road signs by way of cleaning and repainting of mandatory/regulatory/cautionary/informatory and place identifications sign board as per drawings and technical specifications Clause 1910).
Surface Drains in Soil (Construction of unlined surface drains of average cross sectional area 0.40 sqm in soil to specified lines, grades, levels and dimensions to the requirement of clause 301 and 309. Excavated material to be used in embankment within a lead of50 metres (average lead 25 metres) A) Mechanical means (B) Manual Means
Painting Two Coats on New Concrete Surfaces (Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces)
White washing of parapet walls of CD work and tree trunks (White washing two coats on parapet walls and tree trunks including preparation of surface by cleaning scraping etc. as per technical specifications Clause 1915)
Total Bill No. 1
(Shantipur - Meka section of NH-115 from Km 0.00 to Km 19.50)
Clearing and Grubbing Road Land .(Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness.) B y Manual Means:- (A) In area of light jungle
Granular Sub-Base with Coarse Graded Material ( Table:- 400- 2) (Construction of granular sub-base by providing coarse graded material,spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting withvibratory roller to achieve the desired density, complete as per clause 401) for grading- I Material
Maintenance of Culverts Slab type (Maintenance of Slab type Culvert by way of Cleaning, Clearing, Erosion repair, repairs to cracks, parapet wall and protection work as per drawing and technical specification Clasue 1908).
Repair of steel Railing (Repair of steel railing to bring it to the original shape)
Maintenance of Road signs (Maintenance of Road signs by way of cleaning and repainting of mandatory/regulatory/cautionary/informatory and place identifications sign board as per drawings and technical specifications Clause 1910).
Surface Drains in Soil (Construction of unlined surface drains of average cross sectional area 0.40 sqm in soil to specified lines, grades, levels and dimensions to the requirement of clause 301 and 309. Excavated material to be used in embankment within a lead of50 metres (average lead 25 metres)) (A) Mechanical means (B) Manual Means
Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 to 5.6 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects
Total Bill No. 2
(Dirak - Namsai section of NH-15 from Km 832.00 to Km 845.00)
Clearing and Grubbing Road Land .
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness.
Restoratio of Rain Cut
Restoration of Rain Cuts (Restoration of rain cuts with soil, moorum, gravel or a mixture of these, clearing the loose soil, benching for 300 mm width, laying fresh material in layers not exceeding 250 mm and compacting with plate compactor or power rammers to restore the original alignment, levels and slopes)
Maintenance of Earthen Shoulder (filling with fresh soil)
Maintenance of Earthen Shoulder (filling with fresh soil) (Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment.)
Maintenance of Culverts Slab type
Maintenance of culvert slab type(Maintenance of slab typeCulvert by way of Cleaning, Clearing, Erosion repair, repairs to cracks, parapet wall and protection work as per drawing and technical specification Clasue 1908)
Maintenance of Road signs
Maintenance of Road signs by way of cleaning and repainting of mandatory /regulatory/ cautionary /informatory and place identifications sign board as per drawings and technical specifications Clause 1910.
Repair of RCC Railing
Carrying out repair of RCC M30 railing to bring it to the original shape.
White washing of parapet walls of CD work and tree trunks
White washing two coats on parapet walls and tree trunks including preparation of surface by cleaning scraping etc. as per technical specifications Clause 1915.
Painting on concrete surface
Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 sqm.
Painting on Steel Surfaces
Providing and applying two coats of ready mix paint of approved brand on steel surface after through cleaning of surface to give an even shade
Surface Drains in Soil
Construction of unlined surface drains of average cross sectional area 0.40 sqm in soil to specified lines, grades, levels and dimensions to the requirement of clause 301 and 309. Excavated material to be used in embankment within a lead of 50 metres (average lead 25 metres)
Cutting of branches of trees shrubs and trimming of grass and weeds
Cutting of branches of tress and shrubs from the road way or with in R.O.W. including disposal of wood and leaves to suitable location as per technical specification Clause 1914.
Printing New Letter and Figures of any Shade
Printing new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade
I) Hindi
II) English and Roman
Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom.( Including cost of testing of materials at site and laboratory as directed by the deptt.)
Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 to 5.6 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects
Total Bill No. 3
Ordinary Repair / Maintenance of NH-315 from 24.000 Km to 56.485 Km
Hill Side Drain clearance
Removal of earth from the choked hill side drain and disposing it on the valley side manually
Maintenance of culverts slab type
Maintenance of slab type culvert by way of cleaning, clearing, erosion repair, repairs to cracks, parapet wall and protection work as per drawing and technical specification Clause 1908
Clearing and Grubbing Road land
Clearing and Grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth upto 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 mtrs including, removal and disposal of top organic soil not exceeding 150 mm in thickness
I) By manual means
II) In area of light jungle
Printing New letter and figures of any shade (On old shade)
Printing new letter and figures of any shade with synthetic enamel paint black or any other approved color to give an even shade (On Km stones)
i) Hindi (Matras, commas and the like not to be measured and paid for half letter shall be counted as half)
i) English and Roman (Hyphens and the like not to be measured and paid for)
Painting two coats on new concrete surfaces (Old work)
Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surface (On Km stone)
Maintenance of road signs
Maintenance of road signs by way of cleaning and repainting of mandatory / regulatory / cautionary / informatory / and place identifications sign board as per drawings and technical specifications Clause 1910
White washing of parapet walls of CD work and tree trunks
White washing two coats on parapet walls and tree trunks including preparation of surface by cleaning scraping etc. as per technical specifications Clause 1915
Total Bill No. 4
M/s. GRRB ASSOCIATES
M/s North East Engineering & Construction Agency
M/S Agam Constructions
M/s KOOJE JANGGO ENTERPRISES
T. T. Enterprise
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.53 MB
BOQ_691430.xls
BOQ • 0.31 MB
ORDPPjrp.pdf
Tender Documents • 12.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .