| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 CrAccepted-AOC KHALIHAMARI HOUSE NO NIL CITY TOWN DIBRUGARH P O KADOMONI P S DIBRUGARH DIST DIBRUGARH PIN 786001 ASSAM | DIBRUGARH | ASSAM | 786001 | ₹1.4 Cr | L1 | Accepted-AOC work alloted to L1 bidder |
| 2 | L2₹1.5 Cr+₹1.4 L (0.94%)Rejected-Finance | ₹1.5 Cr+₹1.4 L (0.94%) | L2 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | SRI HEMONTA GOHAIN L2 | MS MANAB JYOTI GOGOI AND CO. L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in?charge.
2.6.1 All kinds of soil | 189.79 | Cum | 205.45 ₹38,992.36 Lowest | 205.45 ₹38,992.36 Lowest |
| 2.00 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. | 164.59 | Cum | 253.95 ₹41,797.63 Lowest | 253.95 ₹41,797.63 Lowest |
| 3.00 | Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. | 259.2 | Cum | 368.65 ₹95,554.08 Lowest | 368.65 ₹95,554.08 Lowest |
| 4.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 29.19 | Cum | 6,833.4 ₹1,99,466.95 Lowest | 6,833.4 ₹1,99,466.95 Lowest |
| 5.00 | REINFORCED CEMENT CONCRETE (CAST IN SITU)
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :
1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size de rived from natural sources) | 104.9 | Cum | 8,364.2 ₹8,77,404.58 Lowest | 8,364.2 ₹8,77,404.58 Lowest |
| 6.00 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement :
1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 14.64 | Cum | 10,185.05 ₹1,49,139.69 Lowest | 10,185.05 ₹1,49,139.69 Lowest |
| 7.00 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 80.85 | Cum | 10,719.3 ₹8,66,655.41 Lowest | 10,719.3 ₹8,66,655.41 Lowest |
| 8.00 | STEEL REINFORCEMENT
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.
Hot rolled deformed bars | 9,663.87 | Kg | 89.65 ₹8,66,365.95 Lowest | 89.65 ₹8,66,365.95 Lowest |
| 9.00 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level.
Hot rolled deformed bars | 22,017.85 | kg | 89.65 ₹19,73,900.25 Lowest | 89.65 ₹19,73,900.25 Lowest |
| 10.00 | Centering and shuttering including strutting, propping etc. and removal of form for
Foundations, footings, bases of columns, etc. for mass concrete | 402.22 | sqm | 307.95 ₹1,23,863.65 Lowest | 307.95 ₹1,23,863.65 Lowest |
Tender Value
₹1.4 Cr
EMD Value
₹2.9 L
Closing Date
5 Apr 2025, 2:00 pmClosed
Additional Chief Engineer P.W.D (Roads), Eastern Z
O/o the Additional Chief Engineer P.W.D. (Roads) Eastern Zone
Construction of R.C.C. IT Building
2025_PWD_43652_1
ACE/EZ/TB/MAC/219/NIT/2025/
Open Tender
Civil Works - Building
Item Rate
270 days
Chabua
Please refer tender document
4 documents required · 4 mandatory
₹4,100
₹2.9 L
Yes
7 Mar 2026
24 Mar 2025
7 Apr 2025
24 Mar 2025
5 Apr 2025
24 Mar 2025
24 Mar 2025 - 5 Apr 2025
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .