Loading…
Loading…
Tender Value
₹10.2 L
EMD Value
₹10,162
Closing Date
24 Aug 2026, 5:00 pmDue tomorrow
COMMISSIONER, SMC
Commissioner Sambalpur Municipal Corporation
Repair and restoration of road and drain from Ashok Das house to Sanjib Ku Das house at Lane 6, Kalyan Nagar, SRIT Colony, Ward No 27.
2026_ORULB_138596_6
25/SMC_SBP/2026-27
Open Tender
Civil Works - Others
Percentage
SAMBALPUR MUNICIPAL CORPORATION
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹10,162
Yes
14 Aug 2026
14 Aug 2026
25 Aug 2026
14 Aug 2026
24 Aug 2026
14 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling and removing cement concrete including stacking the useful materials for reuse and removing the debris within 50m. Lead. | 34.1 | cum | 877.2 | ₹29,912.52 |
| 2 | Earth work in all kinds of soil within 50m. initial lead & 1.5m. initial lift including rough dressing & breaking clods to maximum 5cm. to 7cm. & laying in layers not exceeding 0.3m. in depth & as per direction of the engineer –in –charge | 23.94 | cum | 255.01 | ₹6,104.94 |
| 3 | Removal of excavated dismantled materials away from work site by mechanical means within 5km lead including loading unloading etc complete. | 40.63 | cum | 320.6 | ₹13,025.98 |
| 4 | Supplying , filling Sand in F & P including cost, Conveyance & royalty of sand, cost of all labour, T & P, labour cess, watering, ramming etc. complete. | 5.4 | cum | 847.2 | ₹4,574.88 |
| 5 | Providing, spreading Quarry Rubbish in Sub-Base in layers not exceeding 22.5cm. including watering ,compacting to the required density in O.M.C. with rolling by Vibratory Roller as per O.P.W.D. specifications including cost, conveyance & royalty of all materials,cost of all labour, T & P, labour cess, watering, turfedging, hire & running charges of Vibratory Roller etc. complete. | 48 | cum | 1,660.72 | ₹79,714.56 |
| 6 | Cement Concrete (1:3:6) using 4cm size B.H.G. (C. B.) Metal including cost, conveyance , royalty & taxes of all materials etc. complete. | 51.1 | cum | 6,084 | ₹3,10,892.4 |
| 7 | P.C.C. work in (1:2:4) with 12mm size crusher brocken h.g. chips mixing with concrete mixture laying , compacting including cost of all material with taxes , watering, curing labour required for the work etc but excluding centring, shuttering . Complete as per direction of E-I-C. | 3.9 | cum | 7,561.7 | ₹29,490.63 |
| 8 | R.C.C work M-20 grade with 20mm & down grade crusher broken hard Granite chips including hoisting & laying with cost of all labour, materials with all taxes, lead ,T & P , ,but excluding centering, shuttering cost of steel and labour required for bending, binding etc. all complete as per direction of E-I-C | 18.8 | cum | 5,747.1 | ₹1,08,045.48 |
| 9 | Providing reinforcement for RCC work with cutting bending binding , placing in proper position as per design including cost of steel , binding wire and labour required for bending , binding . | 11.28 | Qntl | 9,534.7 | ₹1,07,551.42 |
| 10 | Providing and laying 80 mm thick factory made cement concrete interlocking paver block of M.40 grade made by block making machine with strong vibratory compaction, of approved size, design & shape, laid in required colour and pattern over and including 50 mm thick compacted bed of coarse sand, filling the joints with fine sand etc. all complete as per the direction of Engineer-in-charge. | 475.48 | Sqm | 608.4 | ₹2,89,282.03 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.71 MB
BOQ_605969.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].