Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.9 CrAccepted-AOC SURYA FACTORY SORAN ROAD ALIGARH | ALIGARH | ALIGARH | UTTAR PRADESH | ₹19.9 Cr | L1 | Accepted-AOC Responsive |
| 2 | L2₹20.0 CrRejected-AOC 323 SHAMBHU NAGAR SHIKOHABAD DISTRICT FIROZABAD | FIROZABAD | UTTAR PRADESH | 224172 | ₹20.0 Cr | L2 | Rejected-AOC Responsive |
| 3 | L3₹20.8 CrRejected-Finance 33 73 LATAKUNJ AJMER ROAD BALUGANJ AGRA 282001 | AGRA | UTTAR PRADESH | 282001 | ₹20.8 Cr | L3 | Rejected-Finance Non Responsive |
| 4 | L4₹21.1 CrRejected-Finance | ₹21.1 Cr | L4 | Rejected-Finance Non Responsive |
| 5 | L5₹21.6 CrRejected-Finance | ₹21.6 Cr | L5 | Rejected-Finance Non Responsive |
Tender Value
₹28.5 Cr
EMD Value
₹42.8 L
Closing Date
17 Nov 2023, 12:00 pmClosed
Superintending Engineer
Office of the Superintending Engineer Aligarh Circle PWD Aligarh
Widening Strengthening Work at Etah Ganjdundwara M.D.R. Road In Fy 2023-24
2023_CEALG_860278_1
5302/Cashier PDETAH-Ali.Cir/2023-24 Dt- 10.10.2023
Open Tender
Civil Works - Roads
360 days
Etah
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹42.8 L
Aligarh
26 Dec 2023
7 Nov 2023
17 Nov 2023
7 Nov 2023
17 Nov 2023
7 Nov 2023
10 Nov 2023
Amount
Excavation in Soil using Hydraulic Excavator CK 90 and Tippers with Disposal-Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts as per MORT&H specification 301. I/C cost of material, labour, T&P and all Taxes but Excluding GST
Construction of Embankment with Material Deposited from Roadway Cutting :-Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2. I/C cost of material, labour, T&P and all Taxes but Excluding GST
Construction of Embankment with Material obtained from Borrowpits (Road Side Earth):-Construction of embankment with approved material obtained from borrow pits with all lifts & transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. I/C cost of material, labour, T&P and all Taxes but Excluding GST
Construction of Embankment with Material obtained from Borrowpits (Lead 1Km.) :-Construction of embankment with approved material obtained from borrow pits with all lifts and leads with 1 Km, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2 I/C cost of material, labour, T&P and all Taxes but Excluding GST
Granular Sub-Base with Coarse Graded Material (Table 400-2) In Widening -Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. I/C cost of material, labour, T&P and all Taxes but Excluding GST
Dry Lean Cement Concrete Sub- base M-15 Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing. I/C cost of material, labour, T&P and all Taxes but Excluding GST
Cement Concrete Pavement:- Construction reinforced-reinforced, dowel jointed, plain cement concrete pavement M-35 over a prepared sub base with 43 grade OPC cement (Make J.P., ACC, Birla or J.K.) coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, replacing cement by fly ash to the extent of 15 per cent and sand by 10 per cent, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing I/C cost of material, labour, T&P and all Taxes but Excluding GST
Wet Mix Macadam (WMM +1% OPC cemenet + 3.50% Emulsion) or ETA: Providing Laying and Spreading of graded stone aggregate (WMM) after mixing with water at OMC in machanical Mix Plant carriage of mixed material by tipper to site, laying with 1%OPC cement, (ACC, Birla Uttam , J.K. Super Brand) and 3.50% Hincol Emulsion SS-2 in uniform single layer on sub base/ subgrade and compacting with the road roller to achieve the desire density. I/C cost of material, labour, T&P and all Taxes but Excluding GST
Tack Coat (For Bituminous surface): -Providing and applying Tack coat with bitumen VG-10 on prepared bituminous surface including cleaning of road surface and spraying tack coat at the rate of 0.30kg sqm using mechincal means & complet as per MoRT&H Specification No. 503. I/C cost of material, labour, T&P and all Taxes but Excluding GST
Dense Graded Bituminous Macadam Grading-II:Providing and laying dense graded bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 507 complete in all respects I/C cost of material, labour, T&P and all Taxes but Excluding GST
Bituminous Concrete:- Providing and laying bituminous Concrete with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregrates of specified grading premixed with bituminous binder, @ 5.4 % of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade. level and alignment and rolling with smooth wheeled vibatory and tandem rollers to achive the desired compaction as per MOTRH specification Clause 509 complete in all respect I/C cost of material, labour, T&P and all Taxes but Excluding GST
Excavation in foundation in ordinary soil (Loam, Clay or Sand) Including lift upto 1.50 m and lead upto 30m and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer Incharge upto a distance of 30m from the foundation trenches by Hydraulic excavator/manual means. For Building/ Drain work only. I/C cost of material, labour, T&P and all Taxes but Excluding GST
Providing and laying cement concrete in 1:4:8 (1 Cement : 4 Coarse sand : 8 graded stone aggregate 40 mm nominal size) including supply of all material, labour and T&P etc. required for proper completion of the work. I/C cost of material, labour, T&P and all Taxes but Excluding GST
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers,abutments, posts and struts etc. including cost of centering, shuttering, finishing and excluding reinforcement 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) upto plinth level. I/C cost of material, labour, T&P and all Taxes but Excluding GST
Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202 (For Drain) I/C cost of material, labour, T&P and all Taxes but Excluding GST
S/F of Kilometer Stone & lettring Painting etc. I/C cost of material, labour, T&P and all Taxes but Excluding GST
S/F of Hectometer Stone & lettring Painting etc. I/C cost of material, labour, T&P and all Taxes but Excluding GST
Dismantling brick work or stone work in lime or cement mortar and including stacking of materials as directed by Engineer-In-Charge within a distance of 60 meters (200 feet). SOR Ch.17 SI No.692 I/C cost of material, labour, T&P and all Taxes but Excluding GST
Dismantling reinforced cement concrete or reinforced brick work including stacking of dismantled materials as directed by Engineer-In-Charge within a distance of 60 meters (200 feet). SOR Ch.17 SI No.694 I/C cost of material, labour, T&P and all Taxes but Excluding GST
Excavation for Structures : Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. I/C cost of material, labour, T&P and all Taxes but Excluding GST
P.C.C grade M 10 (1:3:6) : Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 I/C cost of material, labour, T&P and all Taxes but Excluding GST
Brick masonry in 1:3 cement mortar: Brick masonry work in cement mortar in foundation complete excluding pointing and plastering as per drawing and technical specifications Clauses 600, 1202 & 1203 I/C cost of material, labour, T&P and all Taxes but Excluding GST
Brick masonry in 1:3 cement mortar: Brick masonry work in cement mortar in substructure complete excluding pointing and plastering as per drawing and technical specifications Clauses 600, 1202 & 1203 I/C cost of material, labour, T&P and all Taxes but Excluding GST
R.C.C. Grade M 30 : Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 I/C cost of material, labour, T&P and all Taxes but Excluding GST
R.C.C. Grade M 30 : Providing and laying reinforced cement concrete in substructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5 I/C cost of material, labour, T&P and all Taxes but Excluding GST
R.C.C. Grade M 30 : Providing and laying reinforced cement concrete in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5 I/C cost of material, labour, T&P and all Taxes but Excluding GST
Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202 I/C cost of material, labour, T&P and all Taxes but Excluding GST
Supplying, fitting, and placing HYSD bar reinforcement in substructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202 I/C cost of material, labour, T&P and all Taxes but Excluding GST
Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202 I/C cost of material, labour, T&P and all Taxes but Excluding GST
Providing and fixing on wall face unplasticised rigid 110mm dia. PVC rain water pipes conforming to IS: 13592 Type A, including jointing with seal ring conforming to IS: 5382, leaving 10mm gap for thermal expansion. SOR Ch.no1Item no 26(21 b) I/C cost of material, labour, T&P and all Taxes but Excluding GST
Boulder pitching in lounching appron with 40-60 kg boulder Clause No. 1301. I/C cost of material, labour, T&P and all Taxes but Excluding GST
Fine sand filling under Raft slab in foundation :- Fillling in foundation trenches as per drawing and technical specification Clause 305.3.9 I/C cost of material, labour, T&P and all Taxes but Excluding GST
Ruled Pointing on brick work with cement mortar 1:3 (1Cement : 3 Coarse Sand) I/C cost of material, labour, T&P and all Taxes but Excluding GST
RAJEEV KUMAR CONTRACTOR PVT LTD
M/S SHREE RAM CONSTRUCTION
KRISHNA CIVICONS (INDIA) PRIVATE LIMITED
M/s Kaiser Construction Engineers and Contractor
SHIV KANT INFRATECH PVT. LTD.
PRASHANT ASSOCIATE
NARENDRA BUILDERS
RAM SANEHI AND SONS
Ashok Kumar Chhabra Constructions Pvt.Ltd.
M/s Raj Laxmi Enterprises
shree ram stone supliers
M/S AMIT TRADERS
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid