Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹274.7 CrAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹311.9 Cr+₹37.2 Cr (13.5%)Admitted-Finance C O NEELAM MISHRA SHOP NO F5 LOTUS TOWER KHUTEHI REWA M P 486001 | REWA | REWA | MADHYA PRADESH | 486001 | L2 | Admitted-Finance | |
| 3 | L3₹312.7 Cr+₹38.0 Cr (13.8%)Admitted-Finance VASUNDHARA 6TH FLOOR 2 7 SARAT BOSE ROAD KOLKATA 700020 | KOLKATA | KOLKATA | WEST BENGAL | 700020 | L3 | Admitted-Finance | |
| 4 | L4₹313.0 Cr+₹38.3 Cr (13.9%)Admitted-Finance | L4 | Admitted-Finance | |
| 5 | L5₹313.5 Cr+₹38.8 Cr (14.1%)Admitted-Finance | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Shreeji Infraspace Pvt Ltd L2 | M G Contractors Pvt Ltd L4 | M & S PAVING PRIVATE LIMITED AND SATYA BUILDERS (JV) L1 | ABCI INFRASTRUCTURES PVT. LTD. L3 | SREE INFRATECH INDIA PVT LTD L5 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, sapling and tress girth upto 300 mm, removal of stumps of tree cut earlier and disposal of unserviceable materials and stacking of sericeable material to be used of auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150mm in thickness. RCD-SOR-2.03(iii)A | 35.64 | Hect. | 22,000 ₹7,84,146 | 10,690 ₹3,81,023.67 | 10,000 ₹3,56,430 Lowest | 1,07,000 ₹38,13,801 | 1,08,000 ₹38,49,444 |
| 2.00 | Scarifying the existing bituminous surface to a depth of 50 mm and disposal of scarified material within all the lifts and leads upto 1000 metres. By Mechanaical Means using Hydraulic excavator.RCD-SOR-3.15(i) | 2,23,461.28 | Sqm | 38 ₹84,91,528.64 | 5 ₹11,17,306.4 | 2 ₹4,46,922.56 Lowest | 5 ₹11,17,306.4 | 6 ₹13,40,767.68 |
| 3.00 | Dismantling of Flexible Pavements (Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately)Bituminous Course. RCD SOR-2.05(ii)A | 5,783.09 | Cum | 350 ₹20,24,081.5 | 254.5 ₹14,71,796.41 | 100 ₹5,78,309 Lowest | 255 ₹14,74,687.95 | 248 ₹14,34,206.32 |
| 4.00 | Dismantling of Flexible Pavements (Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately)Granular Course. RCD SOR-2.05(ii)B | 17,349.26 | Cum | 400 ₹69,39,704 | 36.1 ₹6,26,308.29 | 20 ₹3,46,985.2 Lowest | 40 ₹6,93,970.4 | 42 ₹7,28,668.92 |
| 5.00 | Excavation for road work in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and tranporting to the embankment location within all lifts and lead upto 1000 m. RCD SOR-3.06 | 3,05,651.6 | Cum | 95 ₹2,90,36,902 | 60.9 ₹1,86,14,182.44 Lowest | 100 ₹3,05,65,160 | 65 ₹1,98,67,354 | 68 ₹2,07,84,308.8 |
| 6.00 | Construction of Embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Table 300-2. Rate per cum after adding royalty@Rs 27.48/cum. RCD SOR-3.17 | 94,168 | Cum | 370 ₹3,48,42,160 | 71 ₹66,85,928 Lowest | 100 ₹94,16,800 | 75 ₹70,62,600 | 72 ₹67,80,096 |
| 7.00 | Construction of sub-grade and earthen shoulders with approved material obtained from Borrow pits with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of Table 300-2.(Stone Dust). RCD SOR-3.18(M-004) | 85,259.2 | Cum | 370 ₹3,15,45,904 Lowest | 2,000 ₹17,05,18,400 | 3,000 ₹25,57,77,600 | 2,000 ₹17,05,18,400 | 2,040 ₹17,39,28,768 |
| 8.00 | Construction of sub-grade and earthen shoulders with approved material obtained from Borrow pits with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of Table 300-2. RCD SOR-3.18 | 72,465.09 | Cum | 340 ₹2,46,38,130.6 | 150 ₹1,08,69,763.5 | 60.9 ₹44,13,123.98 Lowest | 135 ₹97,82,787.15 | 134 ₹97,10,322.06 |
| 9.00 | Granular Sub-Base with Coarse Graded Material ( Table:- 400- 2) (Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401)
RCD-SoR-4.01B(v) | 1,02,886.52 | Cum | 2,200 ₹22,63,50,344 Lowest | 4,000 ₹41,15,46,080 | 2,890 ₹29,73,42,042.8 | 4,000 ₹41,15,46,080 | 3,750 ₹38,58,24,450 |
| 10.00 | Wet Mix Macadam (Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.). RCD-SOR-4.14A | 61,947.23 | Cum | 2,300 ₹14,24,78,629 Lowest | 3,953 ₹24,48,77,400.19 | 4,500 ₹27,87,62,535 | 4,200 ₹26,01,78,366 | 4,050 ₹25,08,86,281.5 |
Tender Value
₹285.1 Cr
EMD Value
₹2.9 Cr
Closing Date
26 Oct 2026, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EXECUTIVE ENGINEER, RCD, ROAD DIVISION, DUMKA
EXECUTIVE ENGINEER, RCD, ROAD DIVISION, DUMKA
Widening and Strengthening/Reconstruction Work of Govindpur-Sahebganj ADB Road (SH-18) from Km 139.00 to Km 190.930 (Total Length-51.930 Km) Road to Two Lane with Paved Shoulder under Road Division Dumka for the year 2026-27.
2026_CECOM_119102_1
RCD/DUMKA/1621/2026-27
Open Tender
Civil Works
Item Rate
730 days
DUMKA
AS PER SBD
3 documents required · 3 mandatory
₹10,000
₹2.9 Cr
CE COMM RCD JHARKHAND RANCHI
20 Nov 2026
25 Sept 2026
27 Oct 2026
25 Sept 2026
26 Oct 2026
1 Oct 2026
30 Sept 2026
120 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, sapling and tress girth upto 300 mm, removal of stumps of tree cut earlier and disposal of unserviceable materials and stacking of sericeable material to be used of auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150mm in thickness. RCD-SOR-2.03(iii)A | 35.64 | Hect. | - | - |
| 2 | Scarifying the existing bituminous surface to a depth of 50 mm and disposal of scarified material within all the lifts and leads upto 1000 metres. By Mechanaical Means using Hydraulic excavator.RCD-SOR-3.15(i) | 2,23,461.28 | Sqm | - | - |
| 3 | Dismantling of Flexible Pavements (Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately)Bituminous Course. RCD SOR-2.05(ii)A | 5,783.09 | Cum | - | - |
| 4 | Dismantling of Flexible Pavements (Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately)Granular Course. RCD SOR-2.05(ii)B | 17,349.26 | Cum | - | - |
| 5 | Excavation for road work in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and tranporting to the embankment location within all lifts and lead upto 1000 m. RCD SOR-3.06 | 3,05,651.6 | Cum | - | - |
| 6 | Construction of Embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Table 300-2. Rate per cum after adding royalty@Rs 27.48/cum. RCD SOR-3.17 | 94,168 | Cum | - | - |
| 7 | Construction of sub-grade and earthen shoulders with approved material obtained from Borrow pits with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of Table 300-2.(Stone Dust). RCD SOR-3.18(M-004) | 85,259.2 | Cum | - | - |
| 8 | Construction of sub-grade and earthen shoulders with approved material obtained from Borrow pits with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of Table 300-2. RCD SOR-3.18 | 72,465.09 | Cum | - | - |
| 9 | Granular Sub-Base with Coarse Graded Material ( Table:- 400- 2) (Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401)
RCD-SoR-4.01B(v) | 1,02,886.52 | Cum | - | - |
| 10 | Wet Mix Macadam (Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.). RCD-SOR-4.14A | 61,947.23 | Cum | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.11 MB
BOQ_161110.xls
BOQ • 0.28 MB
SBD.pdf
Tender Documents • 5.22 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .