Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹34.2 LAdmitted-Finance | ₹34.2 L | L1 | Admitted-Finance |
| 2 | L2₹35.0 L+₹80,105.86 (2.34%)Admitted-Finance | ₹35.0 L+₹80,105.86 (2.34%) | L2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | Rejected-Technical No Pagination |
| Sl No | Description | Qty | Unit | M/S N T ENTERPRISES L2 | M/s Tagung Enterprise L1 |
|---|---|---|---|---|---|
| 1.00 | Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides . | 321 | Cum | 264 ₹84,744 Lowest | 280 ₹89,880 |
| 2.00 | Providing and laying in foundations and plinth cement concrete 1 : 5 : 10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) excluding the cost of centring and shuttering. | 128.37 | Cum | 5,206.5 ₹6,68,370.9 | 4,000 ₹5,13,489.6 Lowest |
| 3.00Providing and laying cement concrete 1 : 3 : 6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) excluding the cost of centring an shuttering in: | |||||
| 4.00 | a)Foundations and plinth | 332 | Cum | 6,289 ₹20,87,948 Lowest | 6,400 ₹21,24,800 |
| 5.00Centring and shuttering including strutting proping etc. and removal of form work for: | |||||
| 6.00 | a) Foundations and plinth. | 1,181.6 | Sqm | 448 ₹5,29,356.8 Lowest | 471.8 ₹5,57,478.88 |
| 7.00 | 12 mm cement plaster 1 : 3 (1 cement : 3 fine sand). | 555.4 | Sqm | 231 ₹1,28,297.4 Lowest | 239.4 ₹1,32,962.76 |
Tender Value
₹36.4 L
EMD Value
₹36,445
Closing Date
20 Jul 2026, 9:00 amClosed
Block development Officer, CD Block Koloriang
O/o Block Development Officer, CD Block, Koloriang, Kurung Kumey, A.P
C/o CC Footpath at Digging-Il, Koloriang Kurung Kumey District under VVP 2025-26
2026_DRDAP_3525_1
CD/KLG/VVP/NIT/2025-26/12
Open Tender
Civil Works
Item Rate
365 days
Digging-II Village, Koloriang
Please refer Tender documents.
4 documents required · 4 mandatory
₹2,500
Yes
SBI KOLORIANG
₹36,445
Yes
24 Aug 2026
13 Jul 2026
20 Jul 2026
13 Jul 2026
20 Jul 2026
13 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides . | 321 | Cum | - | - |
| 2 | Providing and laying in foundations and plinth cement concrete 1 : 5 : 10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) excluding the cost of centring and shuttering. | 128.37 | Cum | - | - |
| 3 | Providing and laying cement concrete 1 : 3 : 6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) excluding the cost of centring an shuttering in: | - | - | - | - |
| 4 | a)Foundations and plinth | 332 | Cum | - | - |
| 5 | Centring and shuttering including strutting proping etc. and removal of form work for: | - | - | - | - |
| 6 | a) Foundations and plinth. | 1,181.6 | Sqm | - | - |
| 7 | 12 mm cement plaster 1 : 3 (1 cement : 3 fine sand). | 555.4 | Sqm | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.97 MB
Tenderdocuments.pdf
Tender Documents • 19.10 MB
BOQ_3728.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .