Loading…
Loading…
Tender Value
₹1.2 Cr
EMD Value
₹2.4 L
Closing Date
12 Oct 2026, 6:00 pm
ARUN MUNJAL
W.S. Divn., B/Garh
Construction of IPB Service road on both side of 3-Cell Box Structure on West Jua Drain from RD 4150 to 5450.
2026_HRY_551604_1
20267C4D042C 3AAC 4B78 8E92 BF04C8B7DF741616IRR
Open Tender
Civil Works
Works
120 days
Bahadurgarh
Construction of IPB Service road on both side of 3-Cell Box Structure on West Jua Drain from RD 4150 to 5450.
2 documents required · 2 mandatory
₹15,000
₹2.4 L
Yes
1 Oct 2026
1 Oct 2026
13 Oct 2026
1 Oct 2026
12 Oct 2026
1 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | HSR Item [17.13]Granular Sub-Base (Mix in place) Construction of granular sub-base by providing Material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with Rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per technical clause 401 of MORT&H technical specifications [Through Rate] | 1,330.38 | cum | 1,094 | ₹14,55,435.72 |
| 2 | HSR Item [17.69.2]Interlocking Concrete Block Pavement 2. Providing and Laying 80 mm thick ISI marked Interlocking Paver Blocks conforming to IS 15658:2006/IRC SP 63: 2004 of all shapes and colours in design mix cement M 40 over the bed of 30 mm thick fine sand complete in all respect. [Through Rate] | 4,682 | Sqm | 655 | ₹30,66,710 |
| 3 | HSR Item [27.8.1.2]PCC Grade M30 1.2. With Batching Plant, Transit Mixer and Concrete Pump [Through Rate] | 84.56 | cum | 4,932 | ₹4,17,049.92 |
| 4 | HSR Item [4.12.1]Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by Engineer-in-charge. 1. All kinds of soil [Through Rate] | 50.4 | cum | 78 | ₹3,931.2 |
| 5 | HSR Item [4.33]Excavating, supplying and filling of local earth (including royalty) by mechanical transport up to a lead of 1 km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. [Through Rate] | 890.93 | cum | 138 | ₹1,22,948.34 |
| 6 | HSR Item [6.1.2]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 2. 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) [Through Rate] | 888.23 | cum | 3,476 | ₹30,87,487.48 |
| 7 | HSR Item [6.25.1]Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge. 1. All works up to plinth level [Through Rate] | 338.25 | cum | 4,464 | ₹15,09,948 |
| 8 | HSR Item [6.26.1]Extra for providing richer mixes up to plinth and at all floor levels. 1. Providing M-30 grade concrete instead of M-25 grade BMC/ RMC. (Note:- Cement content considered in M-30 is @ 340 kg/cum) [Through Rate] | 338.25 | cum | 59 | ₹19,956.75 |
| 9 | HSR Item [6.30.1]Centering and shuttering including strutting, propping etc. and removal of form for 1. Foundations, footings, bases of columns, etc. for mass concrete [Through Rate] | 167.4 | Sqm | 156 | ₹26,114.4 |
| 10 | HSR Item [6.33.6]Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect below plinth level Note: Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. 6. Thermo-Mechanically Treated bars of grade Fe-500D or more [Through Rate] | 27,662.58 | Kg. | 66 | ₹18,25,730.28 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.69 MB
BOQ_631425.xls
BOQ • 0.31 MB
AD0181149.pdf
Additional Documents • 0.62 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .