EE VELLORE
EE, Vellore Division, TANGEDCO, VELLORE 632006
Works Contract for Erection of poles, transportation of poles, paving of HT/LT lines, erection works and erection of 2 Nos. Distribution Transformer and other allied works in Junior Engineer Bagayam Section
2023_EB_306033_1
004
Limited
Electrical and Maintenance Works
Works
60 days
Bagayam
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
Exempted
23 May 2023
26 Apr 2023
12 May 2023
26 Apr 2023
11 May 2023
26 Apr 2023
26 Apr 2023 - 11 May 2023
Amount
Loading, Transporting and unloading of poles and associated Materials from substore /vellore to bagayam section work spot upto 5 kms.
Loading, Transporting and unloading of Distribution Transformer from Central store /vellore to bagayam section work spot upto 10 kms.
Excavation, erection and fixing with various types of line materials for HT pole.
Excavation, erection and fixing with various types of line materials for LT pole.
Excavation and erection of stay set complete.
Erection of Single Pole Structure along with Poles and Structure materials including erection of Distribution transformer.
Fixing of Guarding cross arm with 1 No. 3 Phase cross arm with 1 No. single phase cross arm with line materails
Stringing of 7/3.35 ACSR / 7/3.15 AAAC size of conductor (circuit length as mentioned in sanction copy)
Stringing of 7/2.59 ACSR / 7/2.50 AAAC size of conductor (circuit length as mentioned in sanction copy)
Dismantling of all size of poles including the closing of the pit
Dismantling of conductor of upto 7/3.35 including transporting the conductors to the nearest road side and stocking in coils
Dismantling of all line materials
Loading, transporting, unloading of released line materials and scrap materials from bagayam section work spot to substore /vellore
Releasing and Refixing of service connection wires
Pole earthing (coil) for various size of poles
Concreting of various size of poles
E.P.F. @13 % should be Entered by the Bidder
E.S.I. @3.25 % should be Entered by the Bidder
G.S.T. @18% should be Entered by the Bidder
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .