Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.6 LAccepted-AOC BOOTH NO 7 SECTOR 23 C CHANDIGARH | ₹3.6 L | L1 | Accepted-AOC Being L1 |
| 2 | L2₹4.2 LRejected-Finance H NO 931 PHASE IX CHANDIGARH | NA | NA | 160001 | ₹4.2 L | L2 | Rejected-Finance L2 |
Tender Value
₹5.7 L
EMD Value
₹11,500
Closing Date
17 Apr 2026, 12:00 pmClosed
Er. Gurpreet Singh Bhains
Office of the Executive Engineer, Electrical Division No. 1, Sector-9,Chandigarh.
MTC. OF E.I IN RB/NRB AT CHANDIGARH (REWINDING AND REPAIR CEILING FANS AND EXHAUST FAN ETC. UNDER MAINTENANCE BOOTH SECTOR-20, CHANDIGARH UNDER THE JURISDICTION OF SDE E-6, CHANDIGARH).
2026_CHD_91624_1
E1/TN-7
Open Tender
Electrical Works
90 days
Chandigarh
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹11,500
29 May 2026
7 Apr 2026
17 Apr 2026
7 Apr 2026
17 Apr 2026
7 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
Full stator copper rewinding of ceiling fan (condenser type) of 1200 mm sweep including cleaning and insulating the stator slots, sleeving, soldering, wrapping of cotton tape, reassembling, varnishing and testing etc. complete. | 200 | Each | - | - | |
Full stator copper rewinding of ceiling fan (condenser type) of 1400 mm sweep including cleaning and insulating the stator slots, sleeving, soldering, wrapping of cotton tape, reassembling, varnishing and testing etc. complete. | 350 | Each | - | - | |
Repair / Replacement of BLDC PCP for 48"/56" Ceiling Fan, re-assembling and testing etc. to complete the job to the entire satisfaction of Engineer-in-charge. | 100 | Each | - | - | |
Full stator copper rewinding of an Exhaust fan (condenser type) of following rating 900/1400 RPM including cleaning and insulating the stator slots, sleeving soldering wrapping of cotton tape, varnishing re-assembling and testing etc. complete. | - | - | - | - | |
12" Sweep | 100 | Each | - | - | |
15" Sweep | 25 | Each | - | - | |
18" Sweep | 5 | Each | - | - | |
Fabrication of shaft after removing the shaft from the stator body safely and then labour works for welding and turning of the same to give the original shape from workshop and other petty material required. to complete the job to the entire satisfaction of Engineer-in-charge. | 350 | Each | - | - | |
Replacement of ball bearing of ceiling fan including greasing, re-assembling and testing etc. | 650 | Each | - | - | |
Supply and erection of rubber reel after dismantling the defective real including connection and testing etc. | 250 | Each | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.30 MB
BOQ_112090.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid