Loading…
Loading…
Tender ID
Tender Value
₹4.0 Cr
EMD Value
₹8.0 L
Closing Date
7 May 2026, 2:30 pmClosed
The Executive Engineer, PWD, WD-II, Diu
The Executive Engineer, PWD, WD-II, Fort Road, Diu
CONSTRUCTION OF FCI GODOWN AND SITE DEVELOPMENT OF AT DIU
2026_DIUDT_4718_1
e-tender Notice No. 08/2026-27
Open Tender
Civil Works - Others
Works
365 days
Diu
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,500
The Executive Engineer, PWD, WD-II, Diu
₹8.0 L
The Executive Engineer, PWD, WD-II, Diu
24 Sept 2026
30 Apr 2026
7 May 2026
30 Apr 2026
7 May 2026
30 Apr 2026
4 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Works | |||||
| 1.01 | EXCAVATION upto 1.50 Metre for foundation such as footing, pedestals, walls, drains, columns, ramps, plinth beams, cable trenches in Dense or Hard soil MECHANICALLY but other than hard rock including shoring, strutting, sorting out and stacking useful material, dewatering where required, cutting vegetation up to 1.5m ht if required and disposing off the excavated stuff upto all lead and lift. Note- All types of soil that can be removed by JCB/ Poclain bucket shall be classified under this item. | 1,086.28 | CUM | - | - |
| 1.02 | EXCAVATION 1.50 to 3.00 Metre for foundation such as footing, pedestals, walls, drains, columns, ramps, plinth beams, cable trenches in Hard Murrum MECHANICALLY but other than hard rock including shoring, strutting, sorting out and stacking useful material, dewatering where required, and disposing off the excavated stuff upto all lead and lift. | 1,043.58 | CUM | - | - |
| 1.03 | EXCAVATION 1.50 to 3.00 Metre for foundation such as footing, pedestals, walls, drains, columns, ramps, plinth beams, cable trenches in Soft rock not requiring blasting but other than hard rock including shoring, strutting, sorting out and stacking useful material, dewatering where required, and disposing off the excavated stuff upto all lead and lift | 75 | CUM | - | - |
| 1.04 | EXCAVATION 3.00 to 5.00 Metre for foundation such as footing, pedestals, walls, drains, columns, ramps, plinth beams, cable trenches in Soft rock including shoring, strutting, sorting out and stacking useful material, dewatering where required, and disposing off the excavated stuff upto all lead and lift | 630 | CUM | - | - |
| 1.05 | EXCAVATION 3.00 to 5.00 Metre for foundation such as footing, pedestals, walls, drains, columns, ramps, plinth beams, cable trenches in Hard rock including shoring, strutting, sorting out and stacking useful material, dewatering where required, and disposing off the excavated stuff upto all lead and lift | 75 | CUM | - | - |
| 1.06 | OIDC CONSTRUCTION CIVIL WORK
Providing material and labor for Dewatering the trenches and releasing water 100m away from the toe line with diesel or electrical pump of suitable from any depth including cost of installation of pump, necessary pipeline and its maintenance. | 5,500 | HP/Hr. | - | - |
| 1.07 | FILLING with selected & approved available excavated earth (excluding rock) in excavated pits, trenches, in plinth, sub-base for of roads, drains, manhole, sumps, or where required with approved locally available materials including spreading in layers not exceeding 200mm, watering, ramming, compacting mechanically using 2 ton compactor etc, complete. Measurements for net volume of space occupied by filling. If desired by the engineer-in-charge the contractor shall at his own expense carry out modified proctor compaction test to determine the maximum dry density. The criteria for acceptance of filling shall be compacting to 95% modified Proctor density with use of mechanical roller/rammer etc complete as directed and instructed by Engineer-in-charge. Volume of material filled to be measured for payment. | 2,986.74 | CUM | - | - |
| 1.08 | FILLING with selected & approved Murrum material brought by Contractor from outside client's premises, including Identification of Borrow pits and including Royalty charges & or duties as per requirement of local authority, in foundations, excavated pits, trenches, in plinth, sub-base for of roads, drains, manhole, sumps, or where required with approved locally available materials including spreading in layers not exceeding 200mm, watering, ramming, compacting mechanically using 2 ton compactor etc, complete. Measurements for net volume of space occupied by filling. If desired by the engineer-in-charge the contractor shall at his own expense carry out modified proctor compaction test to determine the maximum dry density. The criteria for acceptance of filling shall be compacting to 95% modified Proctor density with use of mechanical roller/rammer etc complete as directed and instructed by Engineer-in-charge. Volume of material filled to be measured for payment. | 5,911.2 | CUM | - | - |
| 1.09 | Providing and laying RUBBLE SOLING wherever required in foundation and plinth including hand packing fillings interstices with chips and sand. Watering and compacting to consolidated thickness, etc complete as directed by engineer-in-charge | 717.55 | CUM | - | - |
stage.html
html • 0.02 MB
cancelled_1.pdf
pdf • 0.70 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.99 MB
BOQ_4893.xls
BOQ • 0.69 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .