Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹35.5 LAccepted-Finance | ₹35.5 L | L1 | Accepted-Finance L1 |
| 2 | L2₹35.8 LAccepted-Finance | ₹35.8 L | L2 | Accepted-Finance L2 |
Tender Value
₹45.4 L
EMD Value
₹90,882
Closing Date
18 Aug 2026, 12:00 pmClosed
Executive Engineer
Executive Engineer Construction Division-iii, Bisalpur project Deoli
Providing Fabricating testing and commissioning of lifting Beam and bottom piece of stop log gates of Bisalpur Dam.
2026_WRDAS_588459_1
NIT No. 08 year 2026-27 Item No. 2
Open Tender
Civil Works
Percentage
182 days
bisalpur dam
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,000
Yes
via E Challan
₹90,882
Yes
19 Aug 2026
15 Aug 2026
18 Aug 2026
15 Aug 2026
18 Aug 2026
15 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Design, Drawing, fabrication, supply, erection, testing and commissioning of Automatic lifting beam with all accessories, like automatic detach/attach system, hooks/rollers, guides, pins complete for handling, lowering and lifting of Stop log/ emergency gates including cost of all materials, machinery, tools and tackles, labour, cutting, aligning, welding, finishing, cleaning, applying one coat of zinc rich epoxy primer and two coats of cold applied coal tar epoxy paint etc., complete as per specifications and approved drawings, including packing & forwarding, transportation charges for structural steel components and other materials.(per tonne weight) | 5.42 | /Tonne | 2,08,525.4 | ₹11,30,207.67 |
| 2 | Straightening and machining work of structural steel sections (departmental materials) complete job, with all machinery as plainer machine etc., labour, cutting, aligning, finishing, cleaning etc., complete as per specifications and approved drawings, with all lead and lifts, including packing & forwarding charges for structural steel components and other materials. .Machining work of structural steel sections like as Guide T, Track etc. with plainer machine | 216 | Sqm | 2,602.54 | ₹5,62,148.64 |
| 3 | Providing High tensile MS Nut Bolts of required size and type, as per specifications with testing, including all lead and lifts, packing & forwarding charges for all components etc. complete. | 300 | KG | 111.02 | ₹33,306 |
| 4 | Providing, Fabrication, machining with straightening work of Guide Tee, Track, Sealing frame, Leaf frame or any part of gate's, complete as per drawing with testing, including cost of all materials, with machinery, labour, tools and tackles cutting, aligning, welding, finishing, cleaning etc., applying one coat of zinc rich epoxy primer and two coats of cold applied coal tar epoxy paint, etc., complete as per specifications and approved drawings with all lead and lifts, including packing & forwarding, transportation charges for structural steel components and other materials.Rate of work with all materials | 450 | KG | 113.56 | ₹51,102 |
| 5 | Supplying and fixing of chain link fencing with angle iron posts 50x50x6mm placed at every 3 Mtr. apart 30cm in ground embedded in cement concrete 1:3:6 (30x30x45cm) corner and every tenth post to be strutted with (50 x 50 x 6cm) angle iron provided and fixed and fitted with posts including earth work in excavation etc. complete with chain link size.9.36.4 150mm x 150mm x 3.15mm | 1,280 | /Sqm | 528 | ₹6,75,840 |
| 6 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting (height upto 10 m) , fixing in position and applying a priming coat of approved steel primer all complete: | 4,250 | /Kg | 93 | ₹3,95,250 |
| 7 | Chowkidar / Beldar | 980 | Per Day | 300 | ₹2,94,000 |
| 8 | Electrician / Plumber Grade-II | 260 | Per Day | 525 | ₹1,36,500 |
| 9 | Sweeper per day | 245 | Per Day | 300 | ₹73,500 |
| 10 | Maintenance and upkeep of plants, trees, lawn and other flower pots including watering etc. complete but excluding compost, pesticide. | 245 | Per Day | 730 | ₹1,78,850 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.38 MB
Tendernotice_2.pdf
PDF • 1.38 MB
BOQ_1044969.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].