Loading…
Loading…
Tender Value
₹4 Cr
EMD Value
₹4 L
Closing Date
22 Jun 2026, 3:00 pmDue today
Similar tender results from the same govt authority in the past 3 years.
COMMISSIONER
MELVISHARAM MUNICIPALITY
CONSTRUCTION OF COLLECTION WELL AND INTERCEPTION AND DIVERSION I AND D WORKS IN MELVISHARAM MUNICIPALITY
2026_MAWS_679838_1
376/2025/E1-SBM1
Open Tender
Civil Works
MELVISHARAM
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹4 L
MELVISHARAM MUNICIPALITY
8 Jun 2026
8 Jun 2026
22 Jun 2026
8 Jun 2026
22 Jun 2026
8 Jun 2026
8 Jun 2026 - 22 Jun 2026
9 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1Excavation in hard stiff clay, stiff black cotton, hard red earth, shales, muram, gravel stoney earth and earth mixed with small size boulders as per SS 20B with initial lead of 10m and lift of 2.0m | ||||||
| 1.1 | First depth (0m to 2.0m) | 132 | M3 | - | - | BI01010001010000000000000515BI0100001125 |
| 1.2 | second depth (2.00m -3.0m) | 63 | M3 | - | - | BI01010001010000000000000515BI0100001125 |
| 1.3 | third depth (3.00m -4.00m) | 63 | M3 | - | - | BI01010001010000000000000515BI0100001125 |
| 1.4 | Fourth depth (4.00m -5.00m) | 63 | M3 | - | - | BI01010001010000000000000515BI0100001125 |
| 1.5 | Fifth depth (5.00m -6.00m) | 26 | M3 | - | - | BI01010001010000000000000515BI0100001125 |
| 2 | Earth work Open excavation by Mechanical Means for Open Earthwork in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 100 mts and clearing and levelling including dressing of sides and raming of bottoms etc., complete complying with standard specification and as directed by the departmental officers. | 79 | M3 | - | - | BI01010001010000000000000515BI0100001125 |
| 3 | Removal of excess excavated earth from the site and dumping 5KM away from the location. | 730 | M3 | - | - | BI01010001010000000000000515BI0100001125 |
| 4 | Refilling with excavated earth other than sand with an initial head load of 100 mts. and depositing the earth as shown by the departmental officers in layers well rammed, watered and consolidated etc. complete complying with standard specification | 7,515 | M3 | - | - | BI01010001010000000000000515BI0100001125 |
| 5 | Cement Concrete (M -7.5)1:4:8 (One Cement, Four crushed stone sand and Eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and including curing etc. complete complying with standard specification and as directed by the departmental officers. -Mixing by manual means | 13 | M3 | - | - | BI01010001010000000000000515BI0100001125 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.66 MB
BidDocument.pdf
Tender Documents • 0.95 MB
BOQ_816840.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid