| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.5 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹2.6 L+₹4,951.29 (1.94%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹2.7 L+₹17,329.50 (6.80%)Admitted-Finance | L3 | Admitted-Finance |
Tender Value
₹2.5 L
EMD Value
₹4,940
Closing Date
4 Aug 2026, 6:00 pmClosed
XEN REW JAMMU
XEN REW JAMMU
Constt . of Protection wall of Sarowar near Shastri Samadhi at Sohanjana,pyt sohanjana, Block Mandal Phallian under DCB for the year 2026-27 (PYT LEVEL)
2026_RDPR_317066_1
e-NIT No. 211 RE WJ of 2026-27 dated 21-07-2026
Open Tender
Civil Works
Percentage
30 days
JAMMU
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
MH0515
₹4,940
5 Aug 2026
21 Jul 2026
5 Aug 2026
21 Jul 2026
4 Aug 2026
21 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-in charge: 1:3:6 or richer mix (i/c equivalent design mix). | 7.24 | cum | 1,725.2 | ₹12,490.45 |
| 2 | Earth Work in Excavation by manual labour in foundation trenches including dressing of sides and ramming of bottoms, lift upto 1.5m, including getting out the excavated soil and disposal of surplus excavated soil. 1m from cutting edge.All kinds of soil. | 17.67 | cum | 479.3 | ₹8,469.23 |
| 3 | Providing and lying in position cement concrete 1 cement:5 fine sand:10 graded crushed stone aggregates 40mm size.excludingthe cost of centring and shuttering all work upto plinth Level | 1.18 | cum | 4,826.5 | ₹5,695.27 |
| 4 | Providing and laying in position cement concrete 1 cement:3 fine sand:6 graded crushed stone aggregates 20mm size excluding the cost of centring and shuttering- all works upto plinth level. | 31.89 | cum | 5,733.6 | ₹1,82,844.5 |
| 5 | Boulder @20% | - | cum | 937.9 | - |
| 6 | Centring and shuttering including strutting, propping etc and removal of the formwork.
(a) Foundation, Footing, Base of Columns etc. | 67.66 | sqm | 286.35 | ₹19,374.44 |
| 7 | Carriage of construction material (a) Sand 3 km by MT | 16.06 | cum | 165.84 | ₹2,663.39 |
| 8 | (b) Aggregate 3 km by MT | 30.41 | cum | 165.84 | ₹5,043.19 |
| 9 | Providing and fixing of granite marble sign board engraved with complete job | 1 | no | 5,000 | ₹5,000 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.42 MB
BOQ_1037244.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .