Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.0 LAccepted-Finance H 29 COOLIE LINE METTUR DAM 636 401 | METTUR DAM | SALEM | TAMIL NADU | 636401 | 1 | Accepted-Finance Satisfied |
Tender Value
Refer Docs
EMD Value
₹3,900
Closing Date
22 Feb 2021, 2:00 pmClosed
Superintending Engineer /Mechanical-I/MTPS-I
Office of the Superintending Engineer / Mechanical -I Mettur Thermal Power Station- I Mettur Dam-636406
MTPS I BM Unit-I Boiler pressure parts AOH 2021 Disposal of Ash from Eco hoper deflection slope rear arch room and boiler roof area and strengthening of Eco hopper supports
2021_EB_196058_1
SE / M-I / MTPS-I / BM / OT. 356 / 2020-21
Open Tender
Power/Energy Projects/Products
Works
25 days
Mettur Thermal Power Station-I / Mettur Dam
As per the Tender Specifications
4 documents required · 4 mandatory
₹0
₹3,900
Yes
26 Feb 2021
15 Feb 2021
23 Feb 2021
15 Feb 2021
22 Feb 2021
15 Feb 2021
Amount
Charges for removal of Pent house side wall skin casing sheets ,insulation for an area of 3 m2 and removal of inner wall door 2 m2 by removing bolt and nuts for pent house cooling and carry out repair works in pent house and refixing the same after completion of work.
Charges for inspection of inside pent house area ( 1st &II pass) disposal of ash to the ground floor ash trench and rectification if any.
Charges for removal of ash from penthouse roofing floor area and rear arch room. dispose the ash to the ground floor ash trench
Charges for removal of ash inside the Economiser hopper flue gas deflection slope. The collected ash has to be disposed to ground floor ash drenches.
Charges for chock removal in ECO hopper (4 parts) during AOH coil repair work by falling material, leading, lowering, and disposing the waste material to the appropriate place.
Charges for cutting the worn-out support pipes at Eco hopper area and replacing with new pipes by welding.
Charges for transporting of 3 / 6mm M.S plates from central stores/ MTPS-1 to Boiler area, cutting in to required size, leading, lifting, positioning on the eroded contour portions of Economiser hopper deflection slope area and welding the same including cost of welding electrodes.
Charges for leading lifting of refractory at store and site, stacking at Boiler elevation, chipping removal of cracked/ defective refractory, cleaning, surface preparation, refractory preparation and application on damages by patch work at various elevation of Boiler, removal of loose refractory, lowering, disposing to waste disposal area
Charges for chipping removal of old defective refractory, cleaning, surface preparation, mixing the refractory with water application and curing the patch worked refractory in Boiler at various elevation
T&P’s Consumables and materials as per annexure
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .