Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹6.3 LAdmitted-Fee/PreQual/Technical/Finance | -21.23% | ₹6.3 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹6.8 L+₹49,644.68 (7.92%)Admitted-Fee/PreQual/Technical/Finance | -14.99% | ₹6.8 L+₹49,644.68 (7.92%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹8.0 L
EMD Value
₹8,000
Closing Date
17 Jul 2026, 3:00 pmClosed
ZONAL OFFICER VIII
NO-36 B,PULLA AVENUE ,SHENOY NAGAR ,CHENNAI-600030
MINOR REPAIR WORK STORM WATER DRAIN SIZE 600X750 MM AT VELLALA STREET (ARIGNAR ANNA STREET TO MUTHUAMMAN KOIL STRREET IN DIV-97, UNIT-23, ZONE 8.
2026_CoC_684253_1
Z.O.VIII.C.NO.E1/5187/2026
Open Tender
Civil Works
Works
60 days
GREATER CHENNAI COPORATION ZONE-VIII
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹8,000
17 Jul 2026
6 Jul 2026
17 Jul 2026
6 Jul 2026
17 Jul 2026
6 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling RCC by manual / by using deploying machineries | 17.5 | CUM | 4,610.31 | ₹80,680.43 |
| 2 | Brick work in following Cement Mortar using best q...Executive Engineer in charge. In Cement Morter 1:3 | 15.18 | CUM | 8,192.9 | ₹1,24,368.22 |
| 3 | Desilting of Storm Water Drain | 50 | CUM | 162.71 | ₹8,135.5 |
| 4 | Supplying and erecting centering for plane surface...ng shall be given after the concrete is laid).BEAM | 54 | SQM | 1,178.29 | ₹63,627.66 |
| 5 | Supplying, fabricating and placing in position Rib...nt and binding wire) Upto plinth / Basement level | 1,450 | KGS | 96.53 | ₹1,39,968.5 |
| 6 | Plastering the surface of walls with Cement Mortar...d as directed by the departmental officers. (Wall) | 66 | SQM | 317.59 | ₹20,960.94 |
| 7 | Conveyance by roads in plains 0 to 10 km including Loading unloading and transportation charges | 67.5 | CUM | 225 | ₹15,187.5 |
| 8 | Providing And Laying In Position, Standarded Concr...The Department For The Excess Usage of Materials). | 15.7 | CUM | 9,398.08 | ₹1,47,549.86 |
| 9 | Supplying and fixing of 24" FRC manhole cover with...ll be painted with anti corrosive bitumastic paint | 44 | EACH | 4,434.3 | ₹1,95,109.2 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.89 MB
TENDERDOCUMENT.pdf
Tender Documents • 0.95 MB
BOQ_822526.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .