Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹38.0 LAccepted-Finance A 8 YAHODUTTA SOCIETY KASBA PETH PUNE 411011 | PUNE | PUNE | MAHARASHTRA | 411011 | L1 | Accepted-Finance L1 | |
| 2 | L2₹38.3 L+₹31,318.96 (0.82%)Accepted-Finance | L2 | Accepted-Finance L2 | |
| 3 | L3₹38.6 L+₹59,270.96 (1.56%)Accepted-Finance FLAT NO 105 2A SURVEY NO 30 2 MORAYA HEIGHTS DHANKAWADI PUNE 411043 | PUNE | PUNE | MAHARASHTRA | 411043 | L3 | Accepted-Finance L3 |
| Sl No | Description | Qty | Unit | NIRMAL AQUASOL PVT LTD L2 | SWAMIRAJ CORPORATION L3 | AV AND COMPANY L1 |
|---|---|---|---|---|---|---|
| 0.00Schedule B | ||||||
| 1.00Excavation for foundation / pipe trenches in earth, soils of all types, sand, gravel and soft murum, including removing the excavated material upto a distance of 50 metres and lifts as below, stacking and spreading as directed, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete. (Bd-A- 1/259) | ||||||
| 2.00 | Lift 0 to 1.5 M | 40 | Cubic Meter | 165 ₹6,600 Lowest | 165 ₹6,600 Lowest | 165 ₹6,600 Lowest |
| 3.00Excavation for foundation / pipe trenches in hard murum including removing the excavated material upto a distance of 50 M and lifts as below, stacking and spreading as directed by Engineer-in-charge, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete. (Bd- A-2/259) | ||||||
| 4.00 | Lift 0 to 1.5 M | 40 | Cubic Meter | 187 ₹7,480 | 187 ₹7,480 | 180 ₹7,200 Lowest |
| 5.00 | Refilling the trenches with available excavated stuff with soft material first over pipeline and then hard material in 15 cm layers with all leads and lifts including consolidation, surcharging, etc. complete. | 54 | Cubic Meter | 83 ₹4,482 | 90 ₹4,860 | 80 ₹4,320 Lowest |
| 6.00Providing and laying in situ Cement Concrete M-15 of trap/ granite / quartzite / gneiss metal for foundation and bedding including bailing out water, form work, compaction, curing, etc. complete. (Cement 5.90 bags / cum) Spec. No. - Bd E /1 Page No. 287 and B-7, Page No. 38 | ||||||
| 7.00 | 2) In PCC M-150 | 8 | Cubic Meter | 5,881 ₹47,048 | 5,881 ₹47,048 | 5,800 ₹46,400 Lowest |
| 8.00Providing and laying in situ Cement Concrete of trap/ granite / quartzite / gneiss metal for RCC work in foundation like raft, grillage, strip foundation and footing of RCC columns and steel stanchions including normal dewatering, form work, compaction, finishing and curing, etc. complete. (By weigh batching and mix design for M250 and M-300 only.) (Excluding M.S. or Tor reinforcement) | ||||||
| 9.00 | In RCC M-300 | 15 | Cubic Meter | 8,193 ₹1,22,895 | 8,193 ₹1,22,895 | 8,000 ₹1,20,000 Lowest |
Tender Value
₹38.3 L
EMD Value
₹38,400
Closing Date
7 Oct 2026, 5:00 pmClosed
Superintending Engineer (MMR)
Office of the Superintending Engineer, MMR Circle, Dombivali, Opposite Pendharkar College, Dombivli (East), Dist - Thane
M and R to Barvi Dam and Allied works Repairs with quality enhancement of primary system including coagulation and sedimentation at WTP Barvi with ACPRS. -- 2nd Call
2026_MIDC_1341210_1
MIDC/BDD/Tender Notice No.34 (03) 2026-27
Open Tender
Civil Works - Others
Item Rate
365 days
BARVI DAM
As per tender documents
2 documents required · 2 mandatory
₹10,030
₹38,400
9 Oct 2026
28 Sept 2026
9 Oct 2026
28 Sept 2026
7 Oct 2026
30 Sept 2026
28 Sept 2026 - 29 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0 | Schedule B | - | - | - | - |
| 1 | Excavation for foundation / pipe trenches in earth, soils of all types, sand, gravel and soft murum, including removing the excavated material upto a distance of 50 metres and lifts as below, stacking and spreading as directed, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete. (Bd-A- 1/259) | - | - | - | - |
| 2 | Lift 0 to 1.5 M | 40 | Cubic Meter | - | - |
| 3 | Excavation for foundation / pipe trenches in hard murum including removing the excavated material upto a distance of 50 M and lifts as below, stacking and spreading as directed by Engineer-in-charge, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete. (Bd- A-2/259) | - | - | - | - |
| 4 | Lift 0 to 1.5 M | 40 | Cubic Meter | - | - |
| 5 | Refilling the trenches with available excavated stuff with soft material first over pipeline and then hard material in 15 cm layers with all leads and lifts including consolidation, surcharging, etc. complete. | 54 | Cubic Meter | - | - |
| 6 | Providing and laying in situ Cement Concrete M-15 of trap/ granite / quartzite / gneiss metal for foundation and bedding including bailing out water, form work, compaction, curing, etc. complete.
(Cement 5.90 bags / cum) Spec. No. - Bd E /1 Page No. 287 and B-7, Page No. 38 | - | - | - | - |
| 7 | 2) In PCC M-150 | 8 | Cubic Meter | - | - |
| 8 | Providing and laying in situ Cement Concrete of trap/ granite / quartzite / gneiss metal for RCC work in foundation like raft, grillage, strip foundation and footing of RCC columns and steel stanchions including normal dewatering, form work, compaction, finishing and curing, etc. complete. (By weigh batching and mix design for M250 and M-300 only.) (Excluding M.S. or Tor reinforcement) | - | - | - | - |
| 9 | In RCC M-300 | 15 | Cubic Meter | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.61 MB
ItemSpecification.pdf
Other Document • 0.03 MB
TenderDocument.pdf
Tender Documents • 0.34 MB
Drawing.pdf
Other Document • 0.70 MB
BOQ_2292624.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .