| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹7.1 LAccepted-Finance | 1 | Accepted-Finance L-1 | |
| 2 | 2₹12.2 L+₹5.1 L (71.3%)Accepted-Finance | 2 | Accepted-Finance L-2 | |
| 3 | 3₹12.6 L+₹5.5 L (77.3%)Accepted-Finance | 3 | Accepted-Finance L-3 |
Tender Value
₹7.1 L
EMD Value
₹8,000
Closing Date
30 Dec 2021, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE
ETC-II, UPPTCL, PAARESHAN BHAWAN, VIBHUTI KHAND, GOMTI NAGAR, LUCKNOW-226010
WORK
2021_UPTCL_662897_1
ETC-II/L/60/2021-22
Open Tender
Electrical Works
Item Rate
60 days
220 KV S/S SAROJININAGAR
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
SE, ETC-II, UPPTCL, LUCKNOW
₹8,000
7 Jan 2022
23 Dec 2021
31 Dec 2021
23 Dec 2021
30 Dec 2021
23 Dec 2021
180 days
Amount
Following detailed work are to be done for M&R work in 220KV Switch yard at 220 kv Sub Station Sarojini nagar Lucknow for replacement of New RIP Bushing HV/IV in place of existing HV/IV (OIP)Bushing of 200 MVA T/F-2nd.with all men material and T&P, Crane& Centrifusing Machine with operator etc.required for satisfactory completion of the work.
Draining out complete Transformer oil of 200 MVA T/F- 2nd. from main Tank to 10/50 Kl capacity oil tank and 209 Ltr. Capacity oil drums including work opening of valve, shifting and proper stacking of transformer oil drum/tank.
Safe dismantling of old used (OIP) HV,. IV, 220/132 KV Bushings, from Turrets of 200 MVA Transformer including work opening of jumprs, clamps of Bushings. Proper blanking using proper size Gaskets along with nuts & bolts to complete the job satisfactorily including proper packing in wooden crate/ box and stacking at storage place /store.
Safe carriage of 50 KL & 10 KL Oil Storage Tanks for Centrifuging of Transformer Oil / old&used ,from storage place to site at 220 kV S/S Switcyard.
50 KL Oil Storage Tank from 400 kv Switch yard to site at 220 kv Switch yard ( To & Fro).
Safe carriage of 10 KL Capacity Transformer Oil storageTank from 132 kv Sub Station Mohamadi Lakhimpur to 220 kv Sub Station Sarojini Nagar Lucknow by using Truck/ Dala including work loading ,unloding of oil tank by Hydra / Crane and safe shifting at both end.(distance about 190 kms.)
Providing of Dry Air at the time opening of blanking plate for erection inspection of 200 MVA Transformer main tank and filling of Dry Air of dew point -50°C or better for completion of work. The work shall include connecting pipe / Bushing rod as required and measuring of Dew Point values of Dry Air.
Complete safe erection of new RIP Bushing 220/132 KV , HV/ IV of 200 MVA T/F (BHEL make) on Turrets using proper gasket /Oring tightening of all nut bolts and connection of termination Lead/ Bushing Rod, Thumble and bushing clamp etc. Including safe shifting of RIP Bushing from 220kv cotrol room /yard to site near 200 MVA T/F-.2.and connecting of jumpers of 220 KV &132 kV side Transformer Bushings.
Complete evacuation of 200 MVA Transformer Main tank and providing & filling of Dry N2 of dew point -50°C or better in vacuum up to pressure of 0.25 Kg/Cm and then again evacuating the Transformer tank after required time interval (approx. 24/48 Hrs) using centrifuging machine. The work shall include connecting pipe of machine as required and measuring Dew Point values of Dry Nitrogen before & after every cycle till the required value is achieved . (01 Job for each cycle)
Creating complete vacuum inside the 200 MVA transformer tank & stand test upto 24 Hrs before filling the oil step by step in 200 MVA T/F- II.
Hot Oil Circulation of approx 66 KL T/F oil of 200 MVA T/F in Main Tank, Radiators or oil Tank by connecting 12 KLPH Centrifuging Machine with New Filters for dehydration of Oll, Windings etc and taking & recording BOV values of oil and IR values of transformer windings periodically till the required value is reached including filling & Top up of oil in Main Tank, Radiators, Conservator Tank, OLTCs etc, after necessary preparation in 50/ 10 KL storage oil tank as per direction of Supervising Engineer/ standard practices
Pre-erection testing of Transformer Bushings, with Standard Testing Equipments with valid calibration certificates. Following tests are to be done. Tan-delta and capacitance measurement at standard as well as variable frequencies of 03 Nos HV, 03 Nos, IV Bushings (Using Omicron/ Megger Kit)
Complete Testing of Transformer with Standard Testing Equipments with valid calibration certificates. Following tests are to be completed Tan-delta and Capacitance measurement at standard as well as variable freuencies of03 Nos HV, 03 Nos IV and 03 Nos. LV Bushings. (Using Omicron/ Megger Kit). b LV testing of transformer including magnetisation current test, magnetic balance test. measurement of winding resistance (Omicron Kit), vector group, insulation resistance mesurement, core insulation test, voltage ratio test, short circuit test, open ciruit test. Test reports are to be compiled and submitted in required format as per the satisfaction of competent authority.
Sampling and testing of transformer oil at CPRI or any other NABL accredited testing lab including cost of transportation of samples in standard sampling bottles (adequate number of bottles to be arranged by contractor). Samples to be taken at following intervals (as per actual requirement)1. Before filling in transformer main tank & OLTCS-02 samples. 2. Before charging-05 samples from top and bottom of Main tank, R, Y & B Phase OLTC respectively. Following tests are to be conducted for each sample 1. Breakdown voltage 2. Moisture Content, 3. Tan Delta of Oil, 4. Resistivity. 5. Interfacial Tension, 6. Particle Count. 7. Dissolved Gas Analysis.( One job for each sample)
Safe disconnection of Jumpers of HV/ IV Bushings and safe reconnection / Jumpering of above Bushings.
Meena Elect & Engg. Works
Perfect Power Transformer Associates
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .