Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.0 LAccepted-AOC 93 BADANPUR JIND 126152 | JIND | JIND | HARYANA | 126152 | ₹2.0 L | L1 | Accepted-AOC L1 |
| 2 | L2₹2.1 LRejected-AOC VPO GORAR DISTRICT SONEPAT 131408 | GORAR | SONEPAT | HARYANA | 131408 | ₹2.1 L | L2 | Rejected-AOC L2 |
| 3 | Not Admitted-Fee/PreQual/Technical NEAR BYE PASS 1ST FLOOR SHOP NO 4 GALI NO 1 2 OM NAGAR GOHANA ROAD SONIPAT SONIPAT HARYANA 131001 131001 | SONIPAT | SONIPAT | HARYANA | 131001 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 4 | Not Admitted-Fee/PreQual/Technical GROUND FLOOR 353 RUPANA PANA RATHDHANA NEAR SHIV MANDIR RATHDHANA SONIPA HARYANA | AMBALA | HARYANA | 133001 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹2.0 L
EMD Value
₹4,000
Closing Date
17 Mar 2026, 5:00 pmClosed
Jagmal
DIV 1 Rohtak
Annual Maintenance Estimate for Sewerage Scheme in Sector-5, Rohtak for the year 2025-26.
2026_HBC_507622_1
20262E07D43F 1B8B 4764 92A4 1D8C72DC2DAE267HSV
Open Tender
Civil Works
30 days
Rohtak
As per approved DNIT/NIT/CBD
2 documents required · 2 mandatory
₹250
₹4,000
Yes
9 Apr 2026
11 Mar 2026
18 Mar 2026
11 Mar 2026
17 Mar 2026
11 Mar 2026
[11.5.1]12 mm cement plaster of mix : 1. 1:2 (1 cement: 2 fine sand)
[11.52]Cement rendering on plaster 1 mm thick
[21.103.1]Job work for cleaning of sewer lines by bucket type sewer machine including cost of diesel/lubricants complete in all respects. Only sewer machines will be provided by the department for the following sizes of sewer: 1. 200 mm i/d
[21.93.2]Providing and fixing SFRC MANHOLE COVERS AND FRAMES MARKED WITH IS: 12592 including setting the same to correct lines and levels in 1:3 cement sand mortar over manhole including carriage loading unloading stacking handling re-handling etc. complete in all respects to the satisfaction to the Engineer-in-charge. 2. Type:- Extra Heavy Duty Set (EHD-20) 560MM Clear Opening
[6.14.1]Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1. 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size)
[6.33.3]Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect below plinth level Note: Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. 3. Cold twisted bars
[7.20.1]Brick work with common burnt clay modular bricks of class designation 10.5 in foundation and plinth in: 1. Cement mortar 1:4 (1 cement : 4 coarse sand)
NS Item) Removing of silt from inside of manhole including the cost of loading, unloading, cartage and shifting of malba/sludge from the site, TandP, safety equipment etc. complete in all respect, as desired and directed by the Engineer-in-charge.
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
technical_586383.pdf
techsummary_586383.pdf
finance_586383.pdf
BOQ Comparative Chart
xlsx
finsummary_586383.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.87 MB
BOQ_586383.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid