| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 CrAccepted-AOC CHANDAN NAGAR OPP IOCL PERTROL PUMP RAMPUR ROAD BAREILLY UP 243001 | BAREILLY | BAREILLY | UTTAR PRADESH | 243001 | ₹1.7 Cr | L1 | Accepted-AOC Being L1 |
| 2 | L2₹1.9 Cr+₹19.7 L (11.3%)Rejected-Finance | ₹1.9 Cr+₹19.7 L (11.3%) | L2 | Rejected-Finance Not being L1 |
| Sl No | Description | Qty | Unit | BHARAT ELECTRICAL TRADERS L1 | BARUA & CO L2 |
|---|---|---|---|---|---|
| 1.00SCHEDULE "A" Part-I (To be quoted by the tenderer) | |||||
| 2.00 | Item No 01 : Design and Construction of building all as per SBC Report, DBR, Drawing and Tender documents. | 1 | Lump sum | 11,00,000 ₹11,00,000 Lowest | 25,00,000 ₹25,00,000 |
| 3.00 | Sch 'A' Part-II (External Electric supply) Lump sum price worked out by the contractor for (External Electric supply) as listed in Schedule 'A' Part-II against the lump sum price inserted by the MES. | 1 | Lump sum | 17,90,000 ₹17,90,000 | 17,50,000 ₹17,50,000 Lowest |
| 4.00 | Sch 'A' Part-III (Fencing gate and compound wall) Lump sum price worked out by the contractor for (Fencing gate and compound wall) as listed in Schedule 'A' Part-III against the lump sum price inserted by the MES. | 1 | Lump sum | 22,75,000 ₹22,75,000 Lowest | 26,00,000 ₹26,00,000 |
| 5.00 | Sch 'A' Part-IV (Internal Electrification) Lump sum price worked out by the contractor for (Internal Electrification) as listed in Schedule 'A' Part-IV against the lump sum price inserted by the MES. | 1 | Lump sum | 1,20,000 ₹1,20,000 Lowest | 1,46,000 ₹1,46,000 |
| 6.00Note for Srl No 2 to 5 The percentage above / below the SSR -2020 (part-II) rates shall be derived from the amount quoted by the contractor against Srl No. 2 to 5 by comparing it with the amount inserted / pre- priced by the department and the same shall be applicable for the items of respective schedule | |||||
| 7.00Schedule 'A' Part-V (Miscellaneous items of works) | |||||
| 8.00External Electric supply | |||||
| 9.00 | Item No 02 : Supply & installation, testing and commissioningof 2000KVA, 33/11KV, 3Phase, 50Hz, ONANCooled,oil immersed,naturally cooled oi lnatural air natural(ONAN) WITH EXTERNAL Cooling fins copper woundoutdoor type stepdown PowerTransformer with 17 position ONLOAD Tap Changer (OLTC) (tapping range ±10% in steps of 1.25%) with remote tap cubical changer (RTCC) panel & automatic Voltage regulator (AVR) completewith first fillingof IS: 335 ISI marked filtered & dehydrated transformer oil andother standard fittings / accessories like HV Bare bushing, LV Cablebox, Buchholz Relay,OTI,WTI,Marshelling Box etc and with vector group Dyn-11 including PCC foundation for placing transformer as permanufacturer instruction/drawing complete all as specified and confirming to IS:2026 or latest IS specification for higher efficiency and manufacturer shall hold license/certificate from BIS to thiseffect. The maximum temperature rise should not exceed 50 degree celsius in oil and 55 degree centigrade in HV/LV winding when measured by resistance method after continuous full load run onan ambient temp of 55 degree celsius. | 1 | Each | 58,00,000 ₹58,00,000 Lowest | 65,00,000 ₹65,00,000 |
| 10.00The hot spot temp rise temperature rise over a maximum yearly vetted temp of 32 degree centigrade and should be 98 degree celsius IS-200.Marked with all accessories and fitting as per IS 2026. The core of the transformer shall be bottles to reduce hot spot and first gradevCRGOsheet shall used.The insulation level(Power frequency withstand in KVrms shall be 170/70 on HV and 75/28 on LV. Percentage impedence of transformer at 75 degree centigrade rated current frequency should be 6.25 percent(IS tolerance) Note: The transformerwill have its initial oil filling to appropriate level and confirming to relevant IS and tested up to40KVdieelectric strength (cost of oil including testing with desired di electric strength deem to be included in quoted rates) (a)Three nos porcelain bushing suitable for 33KV on HV side complete with copper rods, nuts andwashers and arching horns.(b)One cable box LVside(Secondaryside)consisting of three Nos porcelain with copper bushing rods complete with nut sand washers with two Nos cable gland suitable for reception/ taking out of PVC/XLPE insulated heavy duty HT armoured cables including gland, joint and jointing materials complete. | |||||
Tender Value
₹1.8 Cr
EMD Value
₹2.5 L
Closing Date
29 Jun 2026, 6:00 pmClosed
Chief Engineer Jabalpur Zone
CHIEF ENGINEER JABALPUR ZONE MILITARY ENGINEER SERVICES RIDGE ROAD JABALPUR CANTT 482001
PROVN OF 01X 2000 KVA POWER TRANSFORMERS INCLUDING ASSOCIATE EM AND BR INFRA AT MRS DANAPUR CANTT
2026_MES_756773_2
753043 PROVN OF 01X2000KVA POWER TRANSFORMERS INCLUDING ASSOCIATE EM AND BR INFRA AT MRS DANAPUR CAN
Open Tender
Civil Works
Lump-sum
270 days
DANAPUR
as per nit
7 documents required · 7 mandatory
₹1,000
GE DANAPUR
₹2.5 L
Yes
17 Aug 2026
8 Jun 2026
6 Jul 2026
8 Jun 2026
29 Jun 2026
22 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | SCHEDULE "A" Part-I (To be quoted by the tenderer) | - | - | - | - |
| 2 | Item No 01 : Design and Construction of building all as per SBC Report, DBR, Drawing and Tender documents. | 1 | Lump sum | - | - |
| 3 | Sch 'A' Part-II (External Electric supply) Lump sum price worked out by the contractor for (External Electric supply) as listed in Schedule 'A' Part-II against the lump sum price inserted by the MES. | 1 | Lump sum | - | - |
| 4 | Sch 'A' Part-III (Fencing gate and compound wall) Lump sum price worked out by the contractor for (Fencing gate and compound wall) as listed in Schedule 'A' Part-III against the lump sum price inserted by the MES. | 1 | Lump sum | - | - |
| 5 | Sch 'A' Part-IV (Internal Electrification) Lump sum price worked out by the contractor for (Internal Electrification) as listed in Schedule 'A' Part-IV against the lump sum price inserted by the MES. | 1 | Lump sum | - | - |
| 7 | Schedule 'A' Part-V (Miscellaneous items of works) | - | - | - | - |
| 8 | External Electric supply | - | - | - | - |
| 9 | Item No 02 : Supply & installation, testing and commissioningof 2000KVA, 33/11KV, 3Phase, 50Hz, ONANCooled,oil immersed,naturally cooled oi lnatural air natural(ONAN) WITH EXTERNAL Cooling fins copper woundoutdoor type stepdown PowerTransformer with 17 position ONLOAD Tap Changer (OLTC) (tapping range ±10% in steps of 1.25%) with remote tap cubical changer (RTCC) panel & automatic Voltage regulator (AVR) completewith first fillingof IS: 335 ISI marked filtered & dehydrated transformer oil andother standard fittings / accessories like HV Bare bushing, LV Cablebox, Buchholz Relay,OTI,WTI,Marshelling Box etc and with vector group Dyn-11 including PCC foundation for placing transformer as permanufacturer instruction/drawing complete all as specified and confirming to IS:2026 or latest IS specification for higher efficiency and manufacturer shall hold license/certificate from BIS to thiseffect. The maximum temperature rise should not exceed 50 degree celsius in oil and 55 degree centigrade in HV/LV winding when measured by resistance method after continuous full load run onan ambient temp of 55 degree celsius. | 1 | Each | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.51 MB
BOQ_862915.xls
BOQ • 3.87 MB
drawing.pdf
Additional Documents • 0.85 MB
tender.pdf
Tender Documents • 11.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .