Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10 LAccepted-Finance | ₹10 L | L1 | Accepted-Finance ok |
| 2 | L2₹10.3 L+₹30,000 (3.00%)Accepted-Finance 259 JAY RAM NAGAR KHAMBHAPUR ROAD FATEHPUR FATEHPUR UTTAR PRADESH 212601 | FATEHPUR | UTTAR PRADESH | 212601 | ₹10.3 L+₹30,000 (3.00%) | L2 | Accepted-Finance ok |
Tender Value
₹10 L
EMD Value
₹20,000
Closing Date
20 Aug 2026, 1:00 pmClosed
VDO PRASHASK
GP DHANI SWAMIYAN
ladania talai nalkoop se meghwal basti manoj luna ki dhani ke paas jal hauj may pipeline dalne ka karya ramdevra
2026_PRD_587776_1
E-TENDER/98-102 Date 13.08.2026
Open Tender
Civil Works
Percentage
GP DHANI SWAMIYAN
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
GP DHANI SWAMIYAN
₹20,000
Yes
GP DHANI SWAMIYAN
20 Aug 2026
14 Aug 2026
20 Aug 2026
14 Aug 2026
20 Aug 2026
14 Aug 2026
14 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | 15 cm. To cover the ground surface by cutting the average soil and removing vegetation and small plants and lifting of raw material and shrubs for 1.5 meters and putting them up to a distance of 50 meters. | 32.5 | SQM | 10.94 | ₹355.55 |
| 2 | Digging soil up to 1.5 depths in the foundation, ditch, barn, crushing the bottom, pouring water, grooming the armpits, removing the carved soil, refilling the empty places with soil after filling the foundation and removing the remaining soil for a
distance of 50 meters. | 11 | CUM | 178.36 | ₹1,961.96 |
| 3 | Cement concrete foundation or floor 40 mm. The stone of the renowned measure is to be poured into the limestone ballast /brick soil, cement-sand masala in the ratio of 1 cement : 4 sand : 8 ballast and cutting,
including lowland. | 3.3 | CUM | 3,480.44 | ₹11,485.45 |
| 4 | Cement concrete mixing, pouring and operating a nickel and surface vibration machine (vibrator) on the top surface of the road and preparing it in the desired grade, chamber and super elevation for non-sliding
surface! In 1:2:4 mix | 13.33 | CUM | 4,777.61 | ₹63,685.54 |
| 5 | The work of cutting, folding and placing and
tying iron for RCC work is done to supply. | 698.4 | KG | 92.78 | ₹64,797.55 |
| 6 | In the foundation and chair, they are made of stone in cement-gravel spices, including the edge of the side and the lowlands etc.
In CM 1:4 | 5.78 | CUM | 3,674.66 | ₹21,239.53 |
| 7 | Foundation and chair first class brick masonry cement - gravel in 1:6 spices,
including bunding and lowland. | 22.77 | CUM | 4,829.64 | ₹1,09,970.9 |
| 8 | Putting the roof of the first-class stone straps, filling the joints from the top and bottom with a stone arc with cement spices in the ratio 1: 4 | 29.47 | SQM | 1,696.44 | ₹49,994.09 |
| 9 | Pour the vines in a small piece of concrete brick or stone in cement masala 1:4, strip over the roof and supply. With brick pieces | 29.47 | SQM | 286.64 | ₹8,447.28 |
| 10 | Cement plaster is mixed with cement-gravel
in the ratio of 1:4 on the wall and crushing
the joints and regularly for 14 days. 25 mm
thick | 123.99 | SQM | 302.19 | ₹37,468.54 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.43 MB
BOQ_1043800.xls
BOQ • 0.28 MB
09ds2.pdf
Tender Documents • 0.97 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .