| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.3 LAccepted-AOC | ₹8.3 L Quoted ₹9.8 L | L1 | Accepted-AOC aoc |
| 2 | L2₹9.8 L+₹2,368 (0.24%)Rejected-Finance | ₹9.8 L+₹2,368 (0.24%) | L2 | Rejected-Finance L2 |
| 3 | L3₹9.9 L+₹3,551 (0.36%)Rejected-Finance 804 2 P BLOCK KAKADEV KANPUR | KANPUR | KANPUR | UTTAR PRADESH | ₹9.9 L+₹3,551 (0.36%) | L3 | Rejected-Finance L3 |
| 4 | L4₹9.9 L+₹3,650 (0.37%)Rejected-Finance | ₹9.9 L+₹3,650 (0.37%) | L4 | Rejected-Finance L4 |
| 5 | L5₹9.9 L+₹5,426 (0.55%)Rejected-Finance | ₹9.9 L+₹5,426 (0.55%) | L5 | Rejected-Finance L5 |
Tender Value
₹9.9 L
EMD Value
₹98,637
Closing Date
6 Jan 2026, 3:00 pmClosed
CHIEF ENGINEER, KMC
Motijheel
Improvement of Road by HMP from laxmi Kanpur Electronics to sump well at jarauli phase-02 in ward-82 Under Zone-03
2025_NNKAN_1094925_2
957/AA-2/25-26
Open Tender
Civil Works
Fixed-rate
45 days
zone 2
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
₹98,637
22 Apr 2026
1 Jan 2026
6 Jan 2026
1 Jan 2026
6 Jan 2026
1 Jan 2026
E/W filling or ion embankment in ordinary soil exavation to be done pits not exciding 1.5m including all completion of work.
Supply and Laying GSB including all completion of work.
p/A tack Coat with bitumen 80/100 PRESSURE DISTRIBUTER @ 0.20 KG/SQM etc all work.
Denge Graded Bituminous Macadam (DGBM) P/L dense graded bituminous macadam with 60-90 THP Type HMP producing an average output of 75 tonnes per hour crushed aggregates of specified grading premixed with bitumixed binder @4.5% by weight of total mix and filler transporting the hot mix to work site laying with hydiostatic paver finisher with sensor control to the required grade level and alignment rolling with smooth wheeled vibratory and random rollers to achieve the desired compaction as per MORTH Specification clause NO 507 complete in all respect.
P/A Bituminous concret with computrised HMP type proucing and average output of 75 tones per hrs crushed aggregates of specipied grading premixed with biyuminour binder (CRMB) 5.4 @ PERCENT OF MIX etc all complete work.
Making of Pedastal including all labour work.
Cartage of Earth up to 3Km including all completion of work.
Add 18% G.S.T
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.47 MB
100stamp.pdf
Tender Documents • 0.30 MB
BOQ_2034577.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .