| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.4 CrAdmitted-Finance | ₹2.4 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.7 Cr+₹24.3 L (10.1%)Admitted-Finance | ₹2.7 Cr+₹24.3 L (10.1%) | L2 | Admitted-Finance |
| 3 | L3₹2.7 Cr+₹26.3 L (10.9%)Admitted-Finance | ₹2.7 Cr+₹26.3 L (10.9%) | L3 | Admitted-Finance |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | NIRMAL ENTERPRISES L2 | KUMAR TRADING COMPANY L1 | E-VISION INFRATECH L3 |
|---|---|---|---|---|---|---|
| 1.00SUPPLY | ||||||
| 2.00TOWERS AND NUT & BOLTS | ||||||
| 3.00 | Fabrication, Galvanising, Inspection & supply of MC tower including stubs, extensions & stub setting template, as per drawing & BOM. MS material. (K Rao Design) | 38.93 | MT | 90,100 ₹35,08,016.47 | 89,000 ₹34,65,188.3 Lowest | 91,000 ₹35,43,057.7 |
| 4.00 | Fabrication, Galvanising, Inspection & supply of MC tower including stubs, extensions & stub setting template, as per drawing & BOM. HT material.(K Rao Design) | 66.46 | MT | 90,100 ₹59,87,604.51 Lowest | 92,500 ₹61,47,096.75 | 91,000 ₹60,47,414.1 |
| 5.00 | Fabrication, Galvanising, Inspection & supply of DC tower including stubs, extensions & stub setting template, as per drawing & BOM. ( KPTL Design Towers) | 27.69 | MT | 90,100 ₹24,94,778.9 | 89,000 ₹24,64,321 Lowest | 91,000 ₹25,19,699 |
| 6.00 | Hot Dip Galvanised Nuts & bolts for MC & DC type towers | 5.67 | MT | 1,18,000 ₹6,68,588 | 1,12,000 ₹6,34,592 | 1,10,000 ₹6,23,260 Lowest |
| 7.00TOWER ACCESSORIES | ||||||
| 8.00 | Number Plate | 8 | Nos. | 199 ₹1,592 Lowest | 200 ₹1,600 | 205 ₹1,640 |
| 9.00 | Danger Plate | 8 | Nos. | 199 ₹1,592 Lowest | 200 ₹1,600 | 205 ₹1,640 |
| 10.00 | Phase Plate | 16 | Set | 199 ₹3,184 Lowest | 200 ₹3,200 | 205 ₹3,280 |
Tender Value
₹3.0 Cr
EMD Value
₹3.0 L
Closing Date
2 Dec 2022, 5:00 pmClosed
SE ETC MEERUT
130 D PAASRESHAN BHAWAN VICTORIA PARK MEERUT
Diversion work of 132 KV Modipuram to Sardhana line and 132 KV Modipuram to Kankarkhera 2 line on common tower due to infringement in NCRTC Corridor near 220 KV Sub-Station Modipuram under ETD2 Meerut
2022_UPTCL_753726_1
T-64/22-23/ETC/MT VERY SHORT TERM
Open Tender
Electrical Works
Item Rate
75 days
MEERUT
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,950
SE ETC MEERUT
₹3.0 L
7 Jan 2023
26 Nov 2022
3 Dec 2022
26 Nov 2022
2 Dec 2022
26 Nov 2022
Amount
SUPPLY
TOWERS AND NUT & BOLTS
Fabrication, Galvanising, Inspection & supply of MC tower including stubs, extensions & stub setting template, as per drawing & BOM. MS material. (K Rao Design)
Fabrication, Galvanising, Inspection & supply of MC tower including stubs, extensions & stub setting template, as per drawing & BOM. HT material.(K Rao Design)
Fabrication, Galvanising, Inspection & supply of DC tower including stubs, extensions & stub setting template, as per drawing & BOM. ( KPTL Design Towers)
Hot Dip Galvanised Nuts & bolts for MC & DC type towers
TOWER ACCESSORIES
Number Plate
Danger Plate
Phase Plate
Pipe type earthing material for towers
HARDWARE SUITABLE FOR ACSR ZEBRA
SingleTension Fitting
Double Tension Fitting
Vibration Damper
Repair Sleeves
Mid Span Compression Joint
220 KV 160 KN Polymer Insulator
HARDWARE SUITABLE FOR ACSR PANTHER
SingleTension Fitting
Double Tension Fitting
Vibration Damper
Repair Sleeves
Mid Span Compression Joint
132 KV 120 KN Polymer Insulator
HARDWARE SUITABLE FOR EARTHWIRE
Tension clamp for 7/10 SWG Earthwire
Vibration Damper for 7/10 SWG Earthwire
Mid Span Compresion Joint for 7/10 SWG Earthwire
Tension clamp for 7/9 SWG Earthwire
Vibration Damper for 7/9 SWG Earthwire
Mid Span Compresion Joint for 7/9 SWG Earthwire
Survey including prepration of profile & schedule of materials, marking of locations (Route Length)
Check survey & final peg marking. (Route length)
Cost of excavation of tower foundation pits including all earth work, back filling watering and leveling. ( KPTL Design Towers)
Cost of excavation of tower foundation pits including all earth work, back filling watering and leveling. The work has to be done manually. ( K Rao Design)
Setting of stubs including all foundation work but excluding cost of concreting and excavation (Rate per location) for following M/C and DC towers:-
Cost of Concreting for all types of M/C / Conventional tower foundation including cost of cement core sand, stone grid, dewatering, shoring and shuttering, forming, curing but excluding cost of reinforcement bars with 1:2:4 mix concrete (RCC).
Installation of steel reinforcement bars in RCC foundation including cost of cutting, welding, binding and placing them in foundation pits.
Erection of super structure of MC / DC towers and their extensions including all works above ground level and fitting of danger , number & phase plate, Bird guard etc but excluding hoisting of insulator, hardware & accessories.
Tack wedling of all the bolts up to the height of one section or 5 Mtr. from ground level whichever is higher with three tacks of 10mm/12mm elctro;;/de & application of Zinc rich point on the affected surface including cost of materials.
Carriage of new material such as conductor, hardwares, tower parts etc from store to site.
Laying , stringing, tensioning clamping, jointing etc of ACSR 'Panther conductor including hoisting of insulator, fitting of all necessary hardware and accessories i.e. fittings Armour rods, vibration dampers etfc. On all Six pahses of 132 KV DC lines.
Laying & stringing of 7/10 SWG eartwire including fixing of all type of hardware fittings on 132 KV lines.
Laying , stringing, tensioning clamping, jointing etc of ACSR Zebra conductor including hoisting of insulator, fitting of all necessary hardware and accessories i.e. fittings Armour rods, vibration dampers etfc. On all Three pahses of 220 KV S/C lines.
Laying & stringing of 7/9 SWG eartwire including fixing of all type of hardware fittings on 220 KV lines.
Destringing of ACSR Panther conductor wherever required.The work includes all stringing work required for proper comopletion of work. All the six conductors
Destringing of ground wire including of all accessories making proper bundle of earthwire including safe carriage of all material from site to store.
Dismantalling of Existing foundation in all respect.
Dismantalling of 132 KV Towers.
Dismantalling of Monopole.
Pre insattaltion of assembly of ERS structure at 400KV S/S greater Noida by tightening of Joints, nuts & bolts, installtion of guy wires, making holes for anchor installer complete in all respect.
Installtion of ERS structuree., Fixing of guy wires & other accessories & hardwares. Hoisting of Insulators complete in all respect.
Stringing of all the three ACSR Panther conductor alongwith HW fitting by making cutpoint at ERS tower & stringing between ERS & towers for both ends of ERS
Arrangement of watch & ward round the clock with atleast 04 nos. security guards, security at ERS location and also at the time of dimantalling of ERS conductor & hardware with hardware fittings.
De-stringing of all the three ACSR Panther conductor alongwith HW fitting for removal of ERS.
Dismantalling of ERS structuree., Removal of guy wires & other accessories & hardwares. Dehoisting of Insulators complete in all respect.
Safe transportation including loading, unloading of ERS structure alongwith accessories, guy wires etc from the store at 400KV S/S greater Noida to Site near Modipuram & Vice Versa. (Approx distance=100 km)
NIRMAL ENTERPRISES
E-VISION INFRATECH
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.03 MB
Tendocu64n.pdf
Tender Documents • 0.78 MB
BOQ_1236107.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .