Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.9 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹1.9 L+₹116.86 (0.06%)Admitted-Finance 78 GREATER KAILASH KUNJWANI DISTRICT JAMMU | L2 | Admitted-Finance | ||
| 3 | L3₹2.0 L+₹2,064.52 (1.06%)Admitted-Finance | L3 | Admitted-Finance |
Tender Value
₹1.9 L
EMD Value
₹3,880
Closing Date
7 Aug 2026, 6:00 pmClosed
XEW REW UDHAMPUR
XEW REW UDHAMPUR
BOQ
2026_RDPR_316070_37
e-NIT No. 45 REW UDHAMPUR of 2026-27 Dated 15-07-2026
Open Tender
Civil Works
Percentage
60 days
Udhampur
NIT
2 documents required · 2 mandatory
₹600
XEW REW UDHAMPUR
₹3,880
13 Aug 2026
16 Jul 2026
8 Aug 2026
16 Jul 2026
7 Aug 2026
16 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Add provision for CIB ( to be paid as per actual). | 1 | no | 3,000 | ₹3,000 |
| 2 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed,All Kind of soil. | 2.64 | cum | 479.3 | ₹1,265.35 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size). | 0.92 | cum | 4,826.5 | ₹4,440.38 |
| 4 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15 degree, landing balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto floor five level excluding cost of centring, shuttering, finishing and reinforcement.1 cement: 1.5 coarse sand :3 graded stone aggregates 20mm nominal size. in 1:1.5:3 mix. | 0.14 | cum | 9,821.85 | ₹1,375.06 |
| 5 | Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete . | 6.97 | kg | 123.2 | ₹858.7 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form work for Suspended Floor, Roofs ,Landing,etc | 0.96 | sqm | 718.2 | ₹689.47 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form work for Edges of sla.b | 5.79 | mtr | 262.2 | ₹1,518.14 |
| 8 | Half brick masonry with common burnt clay (non-modular) bricks of class designation 7.5 in foundations and plinth including curing in : Cement mortar 1:4 ( 1 cement : 4 coarse sand) | 1.46 | sqm | 947.25 | ₹1,382.99 |
| 9 | 6 mm cement plaster to ceiling of mix 1 : 3 (1 cement : 3 fine sand | 0.96 | sqm | 241.25 | ₹231.6 |
| 10 | Providing and laying vitrified floor tiles in different sizes (thickness to be specified by the manufacturer) with water absorption less than 0.08% and conforming to IS:15622 of approved make, in all colours and shades, laid on 20mm thick cement mortar 1:4 (1cement :4 coarse sand) including grouting the joints with white cement and matching pigments etc. complete Size of tile 600X600 mm. Double Caharged | 27.42 | sqm | 1,395.1 | ₹38,253.64 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.21 MB
BOQ_1028866.xls
BOQ • 0.33 MB
extensionfinal.pdf
PDF • 0.09 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .