Tender Value
₹2.0 L
EMD Value
₹3,978
Closing Date
5 Sept 2026, 6:55 pm
Executive Engineer REW Pulwama
Executive Engineer REW Pulwama
RDDDC2627109949 - DEVELOPMENT FENCING OF KANJINAG PARK AT WUYAN BALA
2026_RDPR_319154_50
e- NIT No. 82/2026-27 Dated 03-08-2026
Open Tender
Civil Works
Percentage
Pulwama
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Executive Engineer REW Pulwama
₹3,978
3 Aug 2026
3 Aug 2026
7 Sept 2026
3 Aug 2026
5 Sept 2026
3 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5m in width as well as not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: | 1.2 | Cum | 479.3 | ₹575.16 |
| 2 | Providing and laying of stone soling/ plums incl carriage of 10 km avg lead by MT complete job @90% | 1.86 | cum | 1,100 | ₹2,046 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm N. size | 6.01 | cum | 5,733.6 | ₹34,458.94 |
| 4 | Centering and Shuttering etc and removal of formwork for suspended floors,beams etc. | 38.1 | Sqm | 286.35 | ₹10,909.94 |
| 5 | 12mmThick cement Plaster in 1:6 mix on walls | 49.19 | Sqm | 266.2 | ₹13,094.38 |
| 6 | Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. (Welded ) Grill work | 671.53 | Kg | 138.2 | ₹92,805.45 |
| 7 | Painting with synthetic enamel paint of approved brand and manufacture two or more coats to give an even shade including steel primer of red oxide on steel work. Grill work | 42.27 | Sqm | 131.85 | ₹5,573.3 |
| 8 | Earth work in rough excavation, banking excavated earth in layers not exceeding 20 cm in depth, breaking clods, watering, rolling each layer with 1/2 tonne roller or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up in embankments for roads, flood banks, marginal banks and guide banks or filling up ground depressions, lead upto 50 m and lift upto 1.5 m in all kinds of soil: | 32.34 | Cum | 741.05 | ₹23,965.56 |
| 9 | Add cost of stainless steel Round Balls (50mm dia) complete with base plate and nuts and bolts or welding ,complete job. | 23 | No | 150 | ₹3,450 |
| 10 | Carriage of sand / stone aggregate lead 10 km by MT. | 8.76 | cum | 279.04 | ₹2,444.39 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.49 MB
BOQ_1055974.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].