Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.3 LAccepted-AOC | ₹16.3 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹16.3 LSame as L1Rejected-AOC | ₹16.3 LSame as L1 | L2 | Rejected-AOC Rejected |
| 3 | L2₹16.3 LSame as L1Rejected-AOC | ₹16.3 LSame as L1 | L2 | Rejected-AOC Rejected |
| 4 | L2₹16.3 LSame as L1Rejected-AOC | ₹16.3 LSame as L1 | L2 | Rejected-AOC Rejected |
| 5 | L2₹16.3 LSame as L1Rejected-AOC AT TINIGHARIA NUA SAHI PO NAYA BAZAR DIST CUTTACK | CUTTACK | CUTTACK | ODISHA | ₹16.3 LSame as L1 | L2 | Rejected-AOC Rejected |
Tender Value
₹16.3 L
EMD Value
₹16,400
Closing Date
22 May 2026, 5:00 pmClosed
Executive Engineer,Div-III
Bikash Bhawan,Jagannath Lane,Badambadi-753012
Re- construction of C.c Road from Purna Mohanty res to Tita Mohanty res at Labour Colony in Ward no -50
2026_ORULB_127820_27
MC(CMC)CTC_Div-IIINo4/2026-27
Open Tender
Civil Works - Others
Percentage
90 days
CMC
Please refer Tender documents.
2 documents required · 2 mandatory
₹7,080
₹16,400
Yes
12 Sept 2026
12 May 2026
28 May 2026
12 May 2026
22 May 2026
12 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling and removing cement concrete including stacking the useful materials for reuse and removing the debris within 50m | - | Cum | 664.6 | - |
| 2 | Earth work in all kinds of soil within 50m. initial lead & 1.5m. initial lift including rough dressing & breaking clods to maximum 5cm. to 7cm. & laying in layers not exceeding 0.3m. in depth & as per direction of the engineer–in–charge. | - | Cum | 299.52 | - |
| 3 | Filling in foundation trenches, plinths, sites of foundation, in the space below the grade level slab and other underground structures with good quality river sand (inclusive of cost, conveyance, royalties, taxes, loading and unloading) laying in layers not exceeding 225mm in thickness, filling, watering and compacting / ramming, in each layers or complete as per specification, drawing and direction of the Engineer-in-Charge. | - | CUM | 612.7 | - |
| 4 | Cement concrete (1:3:6) with 4cm. Size crusher broken hard Granite metal including cost of all labour, materials with all taxes, lead,T & P etc all complete . | - | CUM | 6,393.8 | - |
| 5 | Providing & laying cement concrete of prop. (1:2:4) using 12mm size, screened, washed hard black crusher broken granite chips of approved quality & from approved quarry including laying in the layers not exceeding 150mm thick hoisting, lowering, laying, watering and curing etc. complete to the required levels including cost, conveyance, royalty and taxes of all materials, cost of all labour, T&p etc. as required for the work complete and as per direction of Engineer in charge. | - | CUM | 1 | - |
| 6 | Remove excavate materials from the site by mechanical means with loading and unloading the same within 5 kms lead as per direction of enginner in charge . | - | Cum | 278.77 | - |
| 7 | Display Board | - | Nos | 6,737.56 | - |
| 8 | Providing centering and shuttering for RCC work including fiting, fixing including cost of all labour, T & P etc all complete | - | Sqm | 248.7 | - |
stage.html
html • 0.06 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_590939.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.19 MB
BOQ_590939.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .