Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.3 LQualified EDDY CURRENT CONTROLS INDIA LIMITED EDDYPURAM CHALAKUDY THRISSUR KERALA 680722 | THRISSUR | KERALA | 680722 | L1 | Qualified MSE, MII, Category: General | |
| 2 | L2₹6.4 L+₹681.36 (0.11%)Qualified 304 FLOOR 3 PLOT 52 C BHARAT CHAMBER TATA POWER CARNAC BUNDER MUMBAI MUMBAI MAHARASHTRA 400009 | MUMBAI | MAHARASHTRA | 400009 | L2 | Qualified MSE, MII, Category: General | |
| 3 | L3₹11.0 L+₹4.7 L (73.6%)Qualified PLOT NO 508 GIDC ESTATE PHASE 2 NR VINZOL CROSSING ROAD GIDC VATVA AHMEDABAD AHMEDABAD GUJARAT 382445 | AHMADABAD | GUJARAT | 382445 | L3 | Qualified MSE, MII, Category: General |
Tender Value
Refer Docs
EMD Value
Exempted
Closing Date
6 Nov 2025, 9:00 amClosed
Industrial Platform Truck (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC)
OEM Authorization Certificate
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3
-- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6795901 Dated : 16-10-2025 Bid Document 1/10 Number of Auto Extension count 1 Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination ITC available to buyer Yes RCM Applicable Yes Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Post Dispatch Name of the Empanelled Inspection Agency/Authority HAL (QC) Auto CRAC Days 60 Evaluation Method Total value wise evaluation Arbitration Clause Yes ( Arbitration clause document ) as per DoE OM No.F.1/2/2024-PPD dated 03.06.2024 Arbitration should not be routinely included in contracts Mediation Clause Yes ( Mediation clause document ) as per DoE OM No.F.1/2/2024-PPD dated 03.06.2024 mediation clause should not be routinely included in contracts and pre- litigation mediation can be taken up without any such clause also Bid Details EMD Detail Required No ePBG Detail Required No 2/10
8479625
GEM/2025/B/6795901
Two Packet Bid
Industrial Platform Truck (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC)
90 days
LUCKNOW
Total value wise evaluation
PRODUCT
3 documents required · 3 mandatory
Exempted
16 Oct 2025
16 Oct 2025
6 Nov 2025
Industrial Platform Truck (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC)
OEM Authorization Certificate
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3
-- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6795901 Dated : 16-10-2025 Bid Document 1/10 Number of Auto Extension count 1 Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination ITC available to buyer Yes RCM Applicable Yes Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Post Dispatch Name of the Empanelled Inspection Agency/Authority HAL (QC) Auto CRAC Days 60 Evaluation Method Total value wise evaluation Arbitration Clause Yes ( Arbitration clause document ) as per DoE OM No.F.1/2/2024-PPD dated 03.06.2024 Arbitration should not be routinely included in contracts Mediation Clause Yes ( Mediation clause document ) as per DoE OM No.F.1/2/2024-PPD dated 03.06.2024 mediation clause should not be routinely included in contracts and pre- litigation mediation can be taken up without any such clause also Bid Details EMD Detail Required No ePBG Detail Required No 2/10
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_8479625.pdf
GEM_BID
1760584692.pdf
OTHER
1760584795.pdf
OTHER
ATC_8a22714e-4d85-492a-afed1760585141163_CAPITALPUR1.pdf
OTHER
list-of-categories-where-trials-are-allowed_1712126171.pdf
OTHER
gtc.pdf
OTHER
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .