Estimate for special repair of damaged lining patches of various Minor i.e. Harsola Minor and Kheri Sheru Minor before the upcoming rainy season 2026
2026_HRY_531980_1
2026521A5965 D748 4CE9 9DAE AB01D942C5BB112IRR
Open Tender
Civil Works
Works
90 days
DEOD KHERI PEODA HARSOLA
3 documents required · 3 mandatory
₹500
₹2,455
Yes
26 Jun 2026
26 Jun 2026
2 Jul 2026
26 Jun 2026
2 Jul 2026
26 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1HSR Items | |||||
| 1.01 | [14.13]Putting 1:3 Cement sand slurry, 6mm thick on prepared bed and side slopes before laying concrete on bed and side slopes | 1 | Sqm | 29 | ₹28.97 |
| 1.02 | [14.14.2]Curing Lining for 28 days 2. On Side slopes | 1 | Sqm | 13 | ₹12.99 |
| 1.03 | [14.2]Dressing side slopes and preparation of sub grade for lining by mechanical/ mannual means | 1 | Sqm | 7 | ₹6.99 |
| 1.04 | [14.9.2]Cement concrete lining 15cm thick or less for irrigation channels, using cement concrete 1:3:6 (M-10) 2. concrete lining on side slopes for vertical height up to 3.50 m. | - | cum | 3,056 | - |
| 1.05 | [4.33]Excavating, supplying and filling of local earth (including royalty) by mechanical transport up to a lead of 1 km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. | - | cum | 138 | - |
| 1.06 | [6.1.4]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 4. 1:3:6 (1 Cement : 3 coarse sand (zone-III) : 6 graded stone aggregate 20 mm nominal size) | 1 | cum | 2,911 | ₹2,908.09 |
| 1.07 | [6.29.1]Centering and shuttering including strutting, propping etc. and removal of form work for : 1. Foundations, footings, bases for columns | 1 | Sqm | 155 | ₹154.85 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.69 MB
BOQ_611035.xls
BOQ • 0.24 MB
AD0169957.pdf
Additional Documents • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .