Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 5₹43.2 Cr+₹28.1 Cr (186.6%)Accepted-AOC 201 202 ANURAO HEIGHTS SHRUSTI PARK BANER BALEWADI ROAD PUNE 411045 | PUNE | PUNE | MAHARASHTRA | 411045 | ₹43.2 Cr+₹28.1 Cr (186.6%) | 5 | Accepted-AOC Accepted |
| 2 | 1₹15.1 CrRejected-AOC B 1 E 27 MOHAN COOPERATIVE INDUSTRIAL ESTATE MATHURA ROAD NEW DELHI 110044 INDIA | SOUTH EAST | DELHI | 110044 | ₹15.1 Cr | 1 | Rejected-AOC Rejected |
| 3 | 2₹34.5 Cr+₹19.4 Cr (128.8%)Rejected-AOC | ₹34.5 Cr+₹19.4 Cr (128.8%) | 2 | Rejected-AOC Accepted |
| 4 | 3₹41.2 Cr+₹26.2 Cr (173.6%)Rejected-AOC | ₹41.2 Cr+₹26.2 Cr (173.6%) | 3 | Rejected-AOC Accepted |
| 5 | 4₹41.4 Cr+₹26.3 Cr (174.7%)Rejected-AOC | ₹41.4 Cr+₹26.3 Cr (174.7%) | 4 | Rejected-AOC Accepted |
| Sl No | Description | Qty | Unit | AICONS Engineering Pvt Ltd L2 | REAL STRENGTH INFRASTRUCTURE L3 | LEA Associates South Asia Pvt. Ltd. L1 | Krushnaji Constro L4 | MAPS Global Civiltech Pvt. Ltd L5 |
|---|---|---|---|---|---|---|---|---|
| 0.00Description | ||||||||
| 1.00 | Appointment of Consultant for Preparation of Detailed Project Report cum Feasibility Study, Survey and Preparation of Land Plan including social, environmental and CCA mitigation study for widening to two lane with Paved Shoulders to various roads as per packages mentioned in Enclosure IV of TOR in the State of Maharashtra with financial aid of Multilateral Development Banks (Under EPC mode) - PACKAGE NOs. – DPR Package 1 | 1 | Lump Sump | 5,02,26,000 ₹5,02,26,000 | 4,47,92,000 ₹4,47,92,000 Lowest | 8,09,20,000 ₹8,09,20,000 | 4,91,15,000 ₹4,91,15,000 | 5,26,67,670 ₹5,26,67,670 |
| 2.00 | DPR Package 2 | 1 | Lump Sump | 4,53,53,000 ₹4,53,53,000 | 3,97,10,000 ₹3,97,10,000 Lowest | 6,97,26,720 ₹6,97,26,720 | 4,32,74,000 ₹4,32,74,000 | 4,61,19,514 ₹4,61,19,514 |
| 3.00 | DPR Package 3 | 1 | Lump Sump | - | 4,38,68,000 ₹4,38,68,000 | - | 4,69,81,000 ₹4,69,81,000 | 3,99,88,740 ₹3,99,88,740 Lowest |
| 4.00 | DPR Package 4 | 1 | Lump Sump | 5,50,55,000 ₹5,50,55,000 | 5,20,85,000 ₹5,20,85,000 Lowest | - | 5,41,53,000 ₹5,41,53,000 | 5,45,29,588 ₹5,45,29,588 |
| 5.00 | DPR Package 5 | 1 | Lump Sump | - | 4,04,58,000 ₹4,04,58,000 | - | 3,89,73,000 ₹3,89,73,000 | 3,79,63,513 ₹3,79,63,513 Lowest |
| 6.00 | DPR Package 6 | 1 | Lump Sump | 5,11,61,000 ₹5,11,61,000 | 5,14,58,000 ₹5,14,58,000 | - | 5,06,99,000 ₹5,06,99,000 | 4,54,63,438 ₹4,54,63,438 Lowest |
| 7.00 | DPR Package 7 | 1 | Lump Sump | 5,24,70,000 ₹5,24,70,000 | 5,27,56,000 ₹5,27,56,000 | - | 5,23,93,000 ₹5,23,93,000 | 5,09,51,625 ₹5,09,51,625 Lowest |
| 8.00 | DPR Package 8 | 1 | Lump Sump | 4,64,20,000 ₹4,64,20,000 | 4,33,29,000 ₹4,33,29,000 | - | 3,92,70,000 ₹3,92,70,000 Lowest | 5,22,82,250 ₹5,22,82,250 |
| 9.00 | DPR Package 9 | 1 | Lump Sump | 4,40,11,000 ₹4,40,11,000 | 4,37,80,000 ₹4,37,80,000 | - | 3,90,06,000 ₹3,90,06,000 Lowest | 5,17,86,813 ₹5,17,86,813 |
Tender Value
Refer Docs
EMD Value
₹5 L
Closing Date
22 May 2026, 3:00 pmClosed
S.E. Raigad P.W. Circle Konkan Bhavan
S.E. Raigad P.W. Circle Konkan Bhavan
Appointment of Consultant for Preparation of Detailed Project Report cum Feasibility Study, Survey and Preparation of Land Plan including social, environmental and CCA mitigation study for widening to two lane with Paved Shoulders to various roads
2026_PWR_1301306_1
Notice No. 03 for 2026-27
Open Tender
Civil Works
Item Rate
Panvel
Please refer Tender documents.
5 documents required · 5 mandatory
₹15,075
₹5 L
Yes
C.E. Konkan and Project Director (EAP), P. W.Depar
20 Aug 2026
8 May 2026
25 May 2026
8 May 2026
22 May 2026
8 May 2026
14 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0 | Description | - | - | - | - |
| 1 | Appointment of Consultant for Preparation of Detailed Project Report cum Feasibility Study, Survey and Preparation of Land Plan including social, environmental and CCA mitigation study for widening to two lane with Paved Shoulders to various roads as per packages mentioned in Enclosure IV of TOR in the State of Maharashtra with financial aid of Multilateral Development Banks (Under EPC mode) - PACKAGE NOs. – DPR Package 1 | 1 | Lump Sump | - | - |
| 2 | DPR Package 2 | 1 | Lump Sump | - | - |
| 3 | DPR Package 3 | 1 | Lump Sump | - | - |
| 4 | DPR Package 4 | 1 | Lump Sump | - | - |
| 5 | DPR Package 5 | 1 | Lump Sump | - | - |
| 6 | DPR Package 6 | 1 | Lump Sump | - | - |
| 7 | DPR Package 7 | 1 | Lump Sump | - | - |
| 8 | DPR Package 8 | 1 | Lump Sump | - | - |
| 9 | DPR Package 9 | 1 | Lump Sump | - | - |
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.64 MB
TOR.pdf
Other Document • 1.16 MB
Agreement.pdf
Other Document • 1.54 MB
BOQ_2234549.xls
BOQ • 0.28 MB
FinancialForms.pdf
Other Document • 0.66 MB
RFP.pdf
Tender Documents • 1.39 MB
corrigendum03.pdf
PDF • 0.73 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .