Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹37,754.61Accepted-AOC | ₹37,754.61 | 1 | Accepted-AOC lowest price |
| 2 | 2₹40,700.61+₹2,946 (7.80%)Rejected-Finance | ₹40,700.61+₹2,946 (7.80%) | 2 | Rejected-Finance highest price |
| Sl No | Description | Qty | Unit | MOHAMED RASMI H L2 | Jeyaraj Jeyaram L1 |
|---|---|---|---|---|---|
| 1.00CONSTRUCTION | |||||
| 1.01 | Earth work excavation for foundation in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2 mts. and clearing and levelling the site, etc., complete complying with standard specification. | 3 | Cum | 197 ₹591 Lowest | 197 ₹591 Lowest |
| 1.02 | Cement Concrete 1:4:8 (One Cement,four sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and curing etc. complete complying with standard specification | 0.6 | Cum | 5,603 ₹3,361.8 Lowest | 5,603 ₹3,361.8 Lowest |
| 1.03 | Supplying and erecting centering to sides and soffits including supports and strutting with necessary cross bracing for plain surface such as RCC slabs rectangular beams all beams lintels etc., centering for soffits upto 3 meter height using mild steel sheet of size 90 cm x 60 cm x 10 mm gauge with MS angles of size 25mm x 25mm x 3mm laid over silver oak (CW) joists of size 10cm x 6cm spaced upto 90cm c/c and casurina props or 10 cm to 13 cm dia spaced at 0.750 cm c/c complying with standard specifications as per TNDSS NO : 30 & 86. | 12.4 | Sqm | 590 ₹7,316 | 575 ₹7,130 Lowest |
| 1.04 | Cement Concrete 1:2:4(One cement,two Msand and Four hard broken stone) using 20 mm gauge hard broken jelly for flooring including laying, consolidating, finishing, rendering the top surface rough to receive the floor, curing, etc. complete complying with standard specification. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers | 1.3 | Cum | 6,937 ₹9,018.1 Lowest | 6,937 ₹9,018.1 Lowest |
| 1.05 | Supplying and fabrication of steel and placing in position of TMT steel rods for RCC works as per design given including cost of steel and GI binding wire in all floors etc., complete complying with standard specification in TNDSS NO:97 V,VI (S6) VII (S6), VII-3. | 100 | Kg | 120 ₹12,000 | 92.4 ₹9,240 Lowest |
| 1.06 | Reinforced Cement Concrete 1:1½:3 Mix (One part cement, one and half part sand and three part of aggregate)using 20mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing but excluding cost of reinforcement etc. Complete with std. Specifications. TNDSS NO: 30 V, VI (S3), VII-3. | 0.95 | Cum | 8,489 ₹8,064.55 Lowest | 8,489 ₹8,064.55 Lowest |
| 1.07 | Providing granolithic floor finish of the following thickness with plain cement concrete 1:2:4 (One Cement, Two sand and Four aggregate) using 10 to 12mm gauge hard broken stone jelly including laying, finishing and the top rubbed smooth with power trawl, thread lining, curing etc. complete complying with standard specification and as directed by the departmental officers. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers) | 2.03 | Sqm | 172 ₹349.16 Lowest | 172 ₹349.16 Lowest |
Tender Value
₹45,000
Closing Date
6 Mar 2026, 3:00 pmClosed
THE EXECUTIVE OFFICER, NATHAM TOWN PANCHAYAT, NATH
THE EXECUTIVE OFFICER, NATHAM TOWN PANCHAYAT, NATHAM
Natham Town Panchayat Construction of Culvert at 12th ward Gandhi Nagar Vinayakar Kovil Back Side in Natham Town Panchayat
2026_DTP_670536_1
GENERAL FUND
Open Tender
Civil Works
Works
60 days
NATHAM
Please refer Tender documents.
1 document required · 1 mandatory
₹0
25 Jul 2026
4 Mar 2026
6 Mar 2026
4 Mar 2026
6 Mar 2026
4 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1CONSTRUCTION | |||||
| 1.01 | Earth work excavation for foundation in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2 mts. and clearing and levelling the site, etc., complete complying with standard specification. | 3 | Cum | - | - |
| 1.02 | Cement Concrete 1:4:8 (One Cement,four sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and curing etc. complete complying with standard specification | 0.6 | Cum | - | - |
| 1.03 | Supplying and erecting centering to sides and soffits including supports and strutting with necessary cross bracing for plain surface such as RCC slabs rectangular beams all beams lintels etc., centering for soffits upto 3 meter height using mild steel sheet of size 90 cm x 60 cm x 10 mm gauge with MS angles of size 25mm x 25mm x 3mm laid over silver oak (CW) joists of size 10cm x 6cm spaced upto 90cm c/c and casurina props or 10 cm to 13 cm dia spaced at 0.750 cm c/c complying with standard specifications as per TNDSS NO : 30 & 86. | 12.4 | Sqm | - | - |
| 1.04 | Cement Concrete 1:2:4(One cement,two Msand and Four hard broken stone) using 20 mm gauge hard broken jelly for flooring including laying, consolidating, finishing, rendering the top surface rough to receive the floor, curing, etc. complete complying with standard specification. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers | 1.3 | Cum | - | - |
| 1.05 | Supplying and fabrication of steel and placing in position of TMT steel rods for RCC works as per design given including cost of steel and GI binding wire in all floors etc., complete complying with standard specification in TNDSS NO:97 V,VI (S6) VII (S6), VII-3. | 100 | Kg | - | - |
| 1.06 | Reinforced Cement Concrete 1:1½:3 Mix (One part cement, one and half part sand and three part of aggregate)using 20mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing but excluding cost of reinforcement etc. Complete with std. Specifications. TNDSS NO: 30 V, VI (S3), VII-3. | 0.95 | Cum | - | - |
| 1.07 | Providing granolithic floor finish of the following thickness with plain cement concrete 1:2:4 (One Cement, Two sand and Four aggregate) using 10 to 12mm gauge hard broken stone jelly including laying, finishing and the top rubbed smooth with power trawl, thread lining, curing etc. complete complying with standard specification and as directed by the departmental officers. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers) | 2.03 | Sqm | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_805793.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.11 MB
BOQ_805793.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .