| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.8 CrAccepted-AOC | ₹1.8 Cr | 1 | Accepted-AOC L1 Accepted |
| 2 | 2₹1.9 Cr+₹5.5 L (3.01%)Rejected-Finance NO 105 MELAPUDUVAYAL ROAD KEERANUR PUDUKKOTTAI 622 502 | PUDUKKOTTAI | TAMIL NADU | 622502 | ₹1.9 Cr+₹5.5 L (3.01%) | 2 | Rejected-Finance L2 Rejected |
| Sl No | Description | Qty | Unit | TST AND CO L2 | CHINNARASU SUBBAIYA L1 |
|---|---|---|---|---|---|
| 1.10Package No. 40 Upgradation / Strengthening of 1 No.of roads | |||||
| 1.20Strengthening of road from Keeranur killukottai road to T.Keelaiyur road km 0/0-2/965 | |||||
| 1.30 | Clearing the Scrub jungle including all labour charges for burryingng and burning etc., Clearing and grubbing road land including uprooting wild vegetation, grass, bushes scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. complete | 3,191.4 | Sqm | 10 ₹31,914 | 5.94 ₹18,956.92 Lowest |
| 1.40 | Scarifying Existing Wornout BT Surface to a Depth of 150 mm by Mechanical Means Scarifying existing granular surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and leads upto 1000 m as per Technical Specification Clause 301.4. | 3,709.38 | Sqm | 30 ₹1,11,281.4 | 21.84 ₹81,012.86 Lowest |
| 1.50 | Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting. providing coffer dams, bailing out of water as per 20A | 1,595.7 | Cum | 150 ₹2,39,355 | 131.29 ₹2,09,499.45 Lowest |
| 1.60Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | |||||
| 1.70 | Km 0/0-1/0 | 569.53 | Cum | 2,200 ₹12,52,966 | 2,195.3 ₹12,50,289.21 Lowest |
| 1.80 | Km 1/0-2/0 | 562.5 | Cum | 2,200 ₹12,37,500 | 2,195.3 ₹12,34,856.25 Lowest |
| 1.90 | Km 2/0-2/955 | 537.19 | Cum | 2,200 ₹11,81,818 | 2,195.3 ₹11,79,293.21 Lowest |
| 2.00 | Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it. | 11,128.13 | Sqm | 90 ₹10,01,531.7 | 82.22 ₹9,14,954.85 Lowest |
Tender Value
₹1.9 Cr
EMD Value
₹1.9 L
Closing Date
21 May 2025, 6:00 pmClosed
ADDITIONAL COLLECTOR (DEVELOPMENT)
DRDA PUDUKKOTTAI
Package No. 40 Upgradation / Strengthening of 1 No.of roads Under MGSMT-2025-26 (Phase-II) in Kunnandarkoil Panchayat Union, Pudukkottai District
2025_RDTN_555793_1
PDKT/MGSMT2025-26/KKL40
Open Tender
Civil Works - Roads
Item Rate
180 days
kunnandarkoil
Pls Refer Tender Documents
4 documents required · 4 mandatory
₹0
₹1.9 L
DRDA PUDUKKOTTAI
30 Sept 2025
9 May 2025
21 May 2025
9 May 2025
21 May 2025
9 May 2025
13 May 2025
Amount
Package No. 40 Upgradation / Strengthening of 1 No.of roads
Strengthening of road from Keeranur killukottai road to T.Keelaiyur road km 0/0-2/965
Clearing the Scrub jungle including all labour charges for burryingng and burning etc., Clearing and grubbing road land including uprooting wild vegetation, grass, bushes scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. complete
Scarifying Existing Wornout BT Surface to a Depth of 150 mm by Mechanical Means Scarifying existing granular surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and leads upto 1000 m as per Technical Specification Clause 301.4.
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting. providing coffer dams, bailing out of water as per 20A
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying 50mm consolidated thick bituminous macadam using 0.20 cum fo 26.50- 13.20mm, 0.43 cum of 13.20-2.36mm and 0.08 cum of 2.36mm & below size IRC metal with 37 Kgs of VG30/ VG40 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher / 9m paver finisher, Vibratory / Pneumatic roller and all other tools and plant required, including fuel and all other incidental charges etc.,complete as per specification.(Bituminous Macadam 50mm thick Using Vibratory Roller)
Providing and laying Bituminious concrete to 25mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site ete.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher, vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Providing and laying including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction at Optimum moisture content and hire fuel charges for powerroller, watersprinkler and all other incidental charges such as traffic barricading and providing dangerlights etc. comp for base-course and side berms
Providing and fixing of cautionary, mandatory and informatory sign board Providing and fixing of Retro Reflectorised Cautionary, Mandatory Signs with Definition Plate made out of High Intensity Grade Prismatic Sheeting conforming to IRC-67:2010 & ASTM D 4956-09, Type IV Specification and Fixed over 1.5 mm thick Aluminium Sheet Fixed on back support Frame of 25mm x 25mm x 3mm Mild steel angle and supported on a mild steel angle iron post 75mm x75mm x 6mm firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete 45cm x45cm x 60cm below Ground Level etc Complete including 7 years warranty for the Retro Reflective Sheeting as per clause 6.9 of IRC 67- 2010 Specification (as per MORT & Spec. No. 801)
(i) 60 cm Equilateral triangle cautionary signboard
(ii) 60 cm Circle (MANDATORY) sign board
Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703
(i) Ordinary Kilometer Stone (Precast)
(ii) 200m Stone (Precast)
Provision for Contruction of RCC NP3 (Double Row) Pipe culvert Ch-240
Earth work excavation and depositing on sides with initial lead and lift in hard graually soil as per SS 20B for foundation.
FILLING WITH GOOD RIVER SAND including cost and conveyance of sand to work site including all labour charges for filling etc complete
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Centering for the sides and soffits RCC items including all cost and conveyance and all labour charges etc., complete.
Cost & Supply of RCC Pipe 900mm dia (NP3)
Supplying and filling course gravel including cost and conveyance of gravel at site and all labour charges for filling ect., complete.
Provision for Contruction of RCC NP3 (Single Row) Pipe culvert Ch-478
Earth work excavation and depositing on sides with initial lead and lift in hard graually soil as per SS 20B for foundation.
FILLING WITH GOOD RIVER SAND including cost and conveyance of sand to work site including all labour charges for filling etc complete
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Centering for the sides and soffits RCC items including all cost and conveyance and all labour charges etc., complete.
Cost & Supply of RCC Pipe 900mm dia (NP3)
Supplying and filling course gravel including cost and conveyance of gravel at site and all labour charges for filling ect., complete.
Provision for Contruction of RCC NP3 (Single Row) Pipe culvert Ch-1080
Earth work excavation and depositing on sides with initial lead and lift in hard graually soil as per SS 20B for foundation.
FILLING WITH GOOD RIVER SAND including cost and conveyance of sand to work site including all labour charges for filling etc complete
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Centering for the sides and soffits RCC items including all cost and conveyance and all labour charges etc., complete.
Cost & Supply of RCC Pipe 900mm dia (NP3)
Supplying and filling course gravel including cost and conveyance of gravel at site and all labour charges for filling ect., complete.
Provision for Contruction of RCC NP3 (Single Row) Pipe culvert Ch-1305
Earth work excavation and depositing on sides with initial lead and lift in hard graually soil as per SS 20B for foundation.
FILLING WITH GOOD RIVER SAND including cost and conveyance of sand to work site including all labour charges for filling etc complete
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Centering for the sides and soffits RCC items including all cost and conveyance and all labour charges etc., complete.
Cost & Supply of RCC Pipe 900mm dia (NP3)
Supplying and filling course gravel including cost and conveyance of gravel at site and all labour charges for filling ect., complete.
Provision for Contruction of RCC NP3 (Single Row) Pipe culvert Ch-1313
Earth work excavation and depositing on sides with initial lead and lift in hard graually soil as per SS 20B for foundation.
FILLING WITH GOOD RIVER SAND including cost and conveyance of sand to work site including all labour charges for filling etc complete
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Centering for the sides and soffits RCC items including all cost and conveyance and all labour charges etc., complete.
Cost & Supply of RCC Pipe 900mm dia (NP3)
Supplying and filling course gravel including cost and conveyance of gravel at site and all labour charges for filling ect., complete.
Provision for Contruction of RCC NP3 (Single Row) Pipe culvert Ch-1511
Earth work excavation and depositing on sides with initial lead and lift in hard graually soil as per SS 20B for foundation.
FILLING WITH GOOD RIVER SAND including cost and conveyance of sand to work site including all labour charges for filling etc complete
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Centering for the sides and soffits RCC items including all cost and conveyance and all labour charges etc., complete.
Cost & Supply of RCC Pipe 900mm dia (NP3)
Supplying and filling course gravel including cost and conveyance of gravel at site and all labour charges for filling ect., complete.
Provision for Contruction of RCC NP3 (Single Row) Pipe culvert Ch-1655
Earth work excavation and depositing on sides with initial lead and lift in hard graually soil as per SS 20B for foundation.
FILLING WITH GOOD RIVER SAND including cost and conveyance of sand to work site including all labour charges for filling etc complete
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Centering for the sides and soffits RCC items including all cost and conveyance and all labour charges etc., complete.
Cost & Supply of RCC Pipe 900mm dia (NP3)
Supplying and filling course gravel including cost and conveyance of gravel at site and all labour charges for filling ect., complete.
Provision for Contruction of RCC NP3 (Single Row) Pipe culvert Ch-2040
Earth work excavation and depositing on sides with initial lead and lift in hard graually soil as per SS 20B for foundation.
FILLING WITH GOOD RIVER SAND including cost and conveyance of sand to work site including all labour charges for filling etc complete
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Centering for the sides and soffits RCC items including all cost and conveyance and all labour charges etc., complete.
Cost & Supply of RCC Pipe 900mm dia (NP3)
Supplying and filling course gravel including cost and conveyance of gravel at site and all labour charges for filling ect., complete.
Provision for Contruction of RCC NP3 (Single Row) Pipe culvert Ch-2670
Earth work excavation and depositing on sides with initial lead and lift in hard graually soil as per SS 20B for foundation.
FILLING WITH GOOD RIVER SAND including cost and conveyance of sand to work site including all labour charges for filling etc complete
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Centering for the sides and soffits RCC items including all cost and conveyance and all labour charges etc., complete.
Cost & Supply of RCC Pipe 900mm dia (NP3)
Supplying and filling course gravel including cost and conveyance of gravel at site and all labour charges for filling ect., complete.
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
TST AND CO (BID ID -1346921)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .