Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹38.3 LAdmitted-Finance | ₹38.3 L | L1 | Admitted-Finance |
| 2 | L2₹39.0 L+₹71,400 (1.86%)Admitted-Finance | ₹39.0 L+₹71,400 (1.86%) | L2 | Admitted-Finance |
| 3 | L3₹42.2 L+₹3.9 L (10.1%)Admitted-Finance | ₹42.2 L+₹3.9 L (10.1%) | L3 | Admitted-Finance |
| 4 | L4₹44.5 L+₹6.2 L (16.1%)Admitted-Finance | ₹44.5 L+₹6.2 L (16.1%) | L4 | Admitted-Finance |
| 5 | L5₹45.0 L+₹6.6 L (17.3%)Admitted-Finance H NO 767 NEAR OLD POST OFFICE NEW VADDEM VASCO DA GAMA GOA 403 802 | SOUTH GOA | GOA | 403802 | ₹45.0 L+₹6.6 L (17.3%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Leo Elevator Company L3 | S S Engineering Works L1 | M/S Kartik Enterprises L8 | M/S DUBAL CONSTRUCTION L5 | Paulraj Painters And Civil Engineering Contractors L7 | SHIVRAJ CONSTRUCTIONS L4 | M/S. NAVEEN ENGINEERING & CO L6 | AATREYA CONSTRUCTION L9 | K M SUBHANAIAH L2 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Providing labour and T&P for cutting of vegetation / grass shrubs using grass cutting machine including cutting of small trees etc by manually on runway, taxi track, dispersal and W/T pad sides upto GL & cutting of bushes including grubbing up small plants and complete all as directed. complete all as directed. | 10,00,000 | Sqm | 1.05 ₹10,50,000 Lowest | 1.45 ₹14,50,000 | 1.75 ₹17,50,000 | 1.65 ₹16,50,000 | 1.62 ₹16,20,000 | 1.6 ₹16,00,000 | 1.75 ₹17,50,000 | 1.7 ₹17,00,000 | 1.45 ₹14,50,000 |
| 2.00 | All as per item No 1 above for the same location after a minimum gap of one month or more than one month after first cutting all as directed. | 10,00,000 | Sqm | 1.05 ₹10,50,000 Lowest | 1.45 ₹14,50,000 | 1.6 ₹16,00,000 | 1.52 ₹15,20,000 | 1.62 ₹16,20,000 | 1.6 ₹16,00,000 | 1.69 ₹16,90,000 | 1.45 ₹14,50,000 | 1.4 ₹14,00,000 |
| 3.00 | Removing leaves/ grass/ bushes/ plastic bags or any other waste material from the freshly grass cut area of the airfield and removing to a distance exc 500 mtr but n.exc 7000 mtr outside the periphery of the airfield area/ location marked by user complete all as directed. | 20,00,000 | Sqm | 1 ₹20,00,000 | 0.2 ₹4,00,000 Lowest | 0.5 ₹10,00,000 | 0.45 ₹9,00,000 | 0.5 ₹10,00,000 | 0.4 ₹8,00,000 | 0.4 ₹8,00,000 | 0.65 ₹13,00,000 | 0.32 ₹6,40,000 |
| 4.00 | M&L for dry sand filling over SGA including spreading, leveling and ploughed to form furrows at an angle of 30 degrees proportionally to the existing ground. (Sand shall be coarse sand as approved of size ( Single sized sand shall be 2.36 mm may defined in terms of passing through sieve and 100% passing from 4.7mm sieve and 100% retained on 1.18mm sieve) complete all as specified and as directed). Note :(i) Mode of measurement shall be truck measurement/trucks body (internal consolidated) measurements and depth will be measured after levelling the top surface of sand before unloading the sand. | 30 | Cum | 1,700 ₹51,000 Lowest | 3,000 ₹90,000 | 3,600 ₹1,08,000 | 3,820 ₹1,14,600 | 4,000 ₹1,20,000 | 3,650 ₹1,09,500 | 3,700 ₹1,11,000 | 3,650 ₹1,09,500 | 4,000 ₹1,20,000 |
| 5.00 | Ploughing and furrowing SGA point by mannually all as directed (Furrows should be to form of 30 degree angle) comp all as directed. | 500 | Sqm | 50 ₹25,000 Lowest | 400 ₹2,00,000 | 380 ₹1,90,000 | 412 ₹2,06,000 | 350 ₹1,75,000 | 350 ₹1,75,000 | 290 ₹1,45,000 | 410 ₹2,05,000 | 300 ₹1,50,000 |
| 6.00 | Taking out waste material deposited during heavy rains to an average thickness of 50mm and not exceed 100mm depth such as dirt/ mud/ dust/ debris/ silt etc from drains and Taxi tracks and path and manually & also were necessary by mechanical means including brooming fanning etc. and removing the material obtained from taking out i.e. mud/ dirt/ dust/ debris/ silt etc to a distance exceeding 3Km and not exceeding 5 Km outside the periphery of the airfield area including removing and refixing of cover slabs of the airfield area/ location etc. complete all as directed. all as directed. Note -Existing cover slab ie drain cover/ man hole cover etc. similar items shall be re-fixed after necessary cleaning at the same location and quated rate shall deemed to be inclusive for the same. | 2,900 | Sqm | 15 ₹43,500 Lowest | 84 ₹2,43,600 | 47 ₹1,36,300 | 37 ₹1,07,300 | 80 ₹2,32,000 | 57 ₹1,65,300 | 45 ₹1,30,500 | 32 ₹92,800 | 50 ₹1,45,000 |
Tender Value
₹45 L
EMD Value
₹90,000
Closing Date
31 Jul 2026, 6:00 pmClosed
SHRI JITENDRA KUMAR MEENA IDSE EE
GARRISON ENGINEER (NW) VASCO Opposite KV No.2, School, Shantinagar, Vasco-Da-Gama, Goa-403802.
8261/E8
2026_MES_777641_1
8261/E8
Open Tender
Civil Works
Item Rate
330 days
VASCO-DA-GAMA
Class D Category a(i)
9 documents required · 9 mandatory
₹500
GE (NW) VASCO
₹90,000
Yes
11 Aug 2026
10 Jul 2026
7 Aug 2026
10 Jul 2026
31 Jul 2026
24 Jul 2026
10 Jul 2026 - 15 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing labour and T&P for cutting of vegetation / grass shrubs using grass cutting machine including cutting of small trees etc by manually on runway, taxi track, dispersal and W/T pad sides upto GL & cutting of bushes including grubbing up small plants and complete all as directed. complete all as directed. | 10,00,000 | Sqm | - | - |
| 2 | All as per item No 1 above for the same location after a minimum gap of one month or more than one month after first cutting all as directed. | 10,00,000 | Sqm | - | - |
| 3 | Removing leaves/ grass/ bushes/ plastic bags or any other waste material from the freshly grass cut area of the airfield and removing to a distance exc 500 mtr but n.exc 7000 mtr outside the periphery of the airfield area/ location marked by user complete all as directed. | 20,00,000 | Sqm | - | - |
| 4 | M&L for dry sand filling over SGA including spreading, leveling and ploughed to form furrows at an angle of 30 degrees proportionally to the existing ground. (Sand shall be coarse sand as approved of size ( Single sized sand shall be 2.36 mm may defined in terms of passing through sieve and 100% passing from 4.7mm sieve and 100% retained on 1.18mm sieve) complete all as specified and as directed). Note :(i) Mode of measurement shall be truck measurement/trucks body (internal consolidated) measurements and depth will be measured after levelling the top surface of sand before unloading the sand. | 30 | Cum | - | - |
| 5 | Ploughing and furrowing SGA point by mannually all as directed (Furrows should be to form of 30 degree angle) comp all as directed. | 500 | Sqm | - | - |
| 6 | Taking out waste material deposited during heavy rains to an average thickness of 50mm and not exceed 100mm depth such as dirt/ mud/ dust/ debris/ silt etc from drains and Taxi tracks and path and manually & also were necessary by mechanical means including brooming fanning etc. and removing the material obtained from taking out i.e. mud/ dirt/ dust/ debris/ silt etc to a distance exceeding 3Km and not exceeding 5 Km outside the periphery of the airfield area including removing and refixing of cover slabs of the airfield area/ location etc. complete all as directed. all as directed. Note -Existing cover slab ie drain cover/ man hole cover etc. similar items shall be re-fixed after necessary cleaning at the same location and quated rate shall deemed to be inclusive for the same. | 2,900 | Sqm | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.31 MB
8261TenderDocument.pdf
Tender Documents • 0.58 MB
BOQ_871066.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .