Loading…
Loading…
Tender Value
₹5.0 L
EMD Value
₹9,960
Closing Date
24 Aug 2026, 5:00 pmDue today
The Executive Engineer PHED Mech. Division Bhopal
The Executive Engineer PHED Mechanical Division, Arvind Vihar, Near Bagh Mungaliya, Bhopal 462043
The Construction of Platform work (55 Nos.) in Raisen District for 2026-27 as per bill of quantity.
2026_PHED_527894_1
08 / 2026-27
Open Tender
Civil Works - Others
Percentage
365 days
Raisen
Please refer Tender documents.
9 documents required · 9 mandatory
₹2,000
₹9,960
13 Aug 2026
13 Aug 2026
25 Aug 2026
13 Aug 2026
24 Aug 2026
13 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1TThe Construction of Platform work (55 Nos.) in Raisen District for 2026-27 as per bill of quantity as per bill of quantity | |||||
| 1.01 | Construction of cement concrete platform as per design around the hand pump in 1:2:4 cement concrete including excavation, centering, shuttering, cost of all the materials and labours and curing etc. complete.
Chaptor 23 / Item 23.04 P. No. 321 | 25 | Nos | 3,998 | ₹99,950 |
| 1.02 | Construction of cement concrete Platform as per design around the hand pump in 1:2:4 cement concrete including excavation, centering, shuttering, cost of all the materials and labour and curing etc complete. Including filling in 30 cms depth after removing black cotton soil including ramming ,watering etc.complete in area of black cotton soils
Chaptor 23 / Item 23.5 P. No. 321 | 30 | Nos | 4,506 | ₹1,35,180 |
| 1.03 | Construction of cement concrete drain as per design in 1:2:4 cement concrete including excavation, centering, shuttering, cost of all the materials and labour and curing etc. complete.
Chaptor 23 / Item 23.06 P. No. 321 | 75 | Mts. | 442 | ₹33,150 |
| 1.04 | Construction of cement concrete drain as per design in 1:2:4 cement concrete including excavation, centering, shuttering, cost of all the materials and labour and curing etc complete. Including filling in 30 cm. depth after removing Black cotton soil including ramming, watering etc. complete in areas of Black Cotton soils.
Chaptor 23/Item 23.7 P. No. 321 | 90 | Mts. | 556 | ₹50,040 |
| 1.05 | Construction of 1.20 m x 1.20 m x 0.20 m cement concrete washing platform in cement concrete 1:2:4 including excavation, centering, shuttering, cost of all the materials and labour and curing etc. complete.
Chaptor 23 / Item 23.08 P. No. 321 | 25 | Nos. | 1,716 | ₹42,900 |
| 1.06 | Construction of 1.20 Mtr X 1.20Mtr X 0.20Mtr cement concrete washing platform in cement concreate 1:2:4 including excavation, centering, shuttering, cost of all the materials and labour and curing etc complete. Including filling in 30 cm. depth after removing Black cotton soil including ramming, watering etc. complete in areas of Black Cotton soils.
Chaptor 23 / Item 23.9 P. No. 321 | 30 | Nos. | 2,067 | ₹62,010 |
| 1.07 | Construction of sokage pit of 70 cm. dia and 1.0 m deep including exacavation , brick lining at top in 1:4 cement mortar , filling of broken bricks etc and cost of all the materials and labour and curing etc complete
Chaptor XXIII / Item 23.10 P. No. 322 | 55 | Nos | 1,359 | ₹74,745 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.13 MB
DetailedNIT.pdf
Tender Documents • 0.57 MB
ShortNIT123.pdf
Tender Documents • 0.12 MB
BOQ_637200.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].