Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹25.1 LAccepted-AOC | L1 | Accepted-AOC Lowest and Reasonable Bid | |
| 2 | L2₹27.6 L+₹80,359 (3.00%)Rejected-Finance | L2 | Rejected-Finance Other than Lowest bid | |
| 3 | L3₹27.9 L+₹1.1 L (4.21%)Rejected-Finance NEW ABADI KISHANPURA SURATGARH 335804 DISTT SRIGANGANGAR RAJ | GANGANAGAR | RAJASTHAN | 335804 | L3 | Rejected-Finance Other than Lowest bid | |
| 4 | L4₹31.0 L+₹4.2 L (15.7%)Rejected-Finance | L4 | Rejected-Finance Other than Lowest bid | |
| 5 | L5₹31.4 L+₹4.6 L (17.1%)Rejected-Finance RCP GURUDWARA ROAD WARD NO 29 SURATGARH SRI GANGANAGAR 335804 | SURATGARH | SRI GANGANAGAR | RAJASTHAN | 335804 | L5 | Rejected-Finance Other than Lowest bid |
| Sl No | Description | Qty | Unit | SRI SAI CONSTRUCTION COMPANY L5 | M/s JUGAL KISHORE MISHRA AND SONS L3 | MAJOR REFREGERATION AND ELECTRICALS L2 | BHADU BUILDERS L4 | singh enterprises L1 |
|---|---|---|---|---|---|---|---|---|
| .01BOQ (REPAIR MAINT TO PUMP SETS, BOREWELLS, FILTERATION PLANT, RO PLANT, PUMP STARTER PANELS AND CONNECTED ITEMS AT AF STN SURATGARH) | ||||||||
| 1.00 | Disconnecting, dismantling and taking out the defective centrifugal pump set of capacity 60 to 75 HP Motor from foundation at water supply installation by opening of coupling, foundation bolts and including replacement of parts as per Item No 2 here-in-after and repair of parts as per item No 3 here-in-after including installing, commissioning and testing on full load, complete all as specificed directed by Engineer-in-Charge.
Note : Spare parts and repair of parts shall be measured and paid seperately. | 2 | Each Job | 3,000 ₹6,000 Lowest | 7,000 ₹14,000 | 4,200 ₹8,400 | 5,000 ₹10,000 | 4,000 ₹8,000 |
| 2.00Supply only spare parts as under required in Srl item No.1 here-in-before complete all as specified and directed by Engr-in-charge:- | ||||||||
| 2.01 | (a) Supply only Centre ring. | 2 | Each | 400 ₹800 | 500 ₹1,000 | 250 ₹500 Lowest | 600 ₹1,200 | 480 ₹960 |
| 2.02 | (b) Supply only ball bearing existing size. Make : NBC/ SKF/ ABL | 4 | Each | 1,200 ₹4,800 | 1,000 ₹4,000 | 600 ₹2,400 Lowest | 1,500 ₹6,000 | 1,280 ₹5,120 |
| 2.03 | (c) Supply only pump motor coupling assembly with tyre. | 2 | Each | 4,000 ₹8,000 | 500 ₹1,000 Lowest | 900 ₹1,800 | 1,800 ₹3,600 | 1,440 ₹2,880 |
| 2.04 | (d) Supply bearing bowl with ball bearing plate. | 2 | Each | 400 ₹800 | 700 ₹1,400 | 450 ₹900 | 400 ₹800 | 200 ₹400 Lowest |
| 2.05 | (e) Supply coupling tyre only. | 2 | Each | 500 ₹1,000 | 500 ₹1,000 | 550 ₹1,100 | 500 ₹1,000 | 200 ₹400 Lowest |
| 3.00Repair to parts of pump required under item No-01 above:- | ||||||||
| 3.01 | (a) Remetalling, Turning and grinding to pump shaft. | 2 | Each job | 1,500 ₹3,000 | 1,700 ₹3,400 | 800 ₹1,600 | 1,000 ₹2,000 | 640 ₹1,280 Lowest |
Tender Value
₹30 L
EMD Value
₹60,000
Closing Date
11 Oct 2025, 6:00 pmClosed
GE AF SURATGARH
GE AF SURATGARH
REPAIR / MAINT TO PUMP SETS, BOREWELLS, FILTERATION PLANT, RO PLANT, PUMP STARTER PANELS AND CONNECTED ITEMS AT AF STN SURATGARH
2025_MES_730036_1
8292/E8
Open Tender
Civil Works
Item Rate
240 days
GE AF SURATGARH
Please refer Tender documents.
10 documents required · 10 mandatory
₹500
GE AF SURATGARH
₹60,000
Yes
12 Nov 2025
9 Sept 2025
13 Oct 2025
9 Sept 2025
11 Oct 2025
24 Sept 2025
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .