Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹10.7 LAdmitted-Fee/PreQual/Technical/Finance | -36.70% | ₹10.7 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹11.2 L+₹45,795.93 (4.27%)Admitted-Fee/PreQual/Technical/Finance | -34.00% | ₹11.2 L+₹45,795.93 (4.27%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹12.3 L+₹1.6 L (14.5%)Admitted-Fee/PreQual/Technical/Finance | -27.53% | ₹12.3 L+₹1.6 L (14.5%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹12.3 L+₹1.6 L (14.8%)Admitted-Fee/PreQual/Technical/Finance | -27.33% | ₹12.3 L+₹1.6 L (14.8%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹13.9 L+₹3.2 L (29.9%)Admitted-Fee/PreQual/Technical/Finance | -17.79% | ₹13.9 L+₹3.2 L (29.9%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
EMD Value
₹40,000
Closing Date
20 Jul 2026, 4:00 pmClosed
Er. Mohammad Waseem
Office of the Executive Engineer RnB Ang
Construction of Drain from National Highway to TB Shah along KY Motors
2026_PWDJK_315517_5
NIT 41 of RnB/Ang/2026-27/3771-80 Dt 10/07/26
Open Tender
Civil Works
Percentage
60 days
Anantnag
Please refer Tender documents.
4 documents required · 4 mandatory
₹800
Executiver Engineer rnB Division Anantnag
₹40,000
23 Jul 2026
11 Jul 2026
21 Jul 2026
11 Jul 2026
20 Jul 2026
11 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in Excavation by Mechanical Means ( Hydraulic excavator ) or foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: | 370.5 | Cum | - | - |
| 2 | Providing and laying of stone soling of tightly hand packed in bed including carriage | 33.34 | Cum | - | - |
| 3 | Providing and laying cement concrete of specified grade excluding the cost of centering & shuttering using M7.5 mix. (1:4:8) and by using 20 mm down aggregates incl carriage | 37.05 | Cum | - | - |
| 4 | Providing and laying cement concrete of specified grade excluding the cost of centering & shuttering using M15 mix. (1:2:4) and by using 20 mm down aggregates incl carriage | 180.62 | cum | - | - |
| 6 | Placing and fixing of shuttring in foundation and in incl disposal of same for foundations | 855 | sqm | - | - |
| 7 | Providing / laying of RCC Pipes in proper position/ grade including cutting of road surface upto required depth, providing requisite cushion including carriage of all materials and pipes upto site of work complete.
36" | 8 | Rm | - | - |
| 8 | Supply including digging, carrying by lorry, filling river bed material mixed with coarse sand and round nallah shingle 75mm as per lines, cross sections, grade and camber, incl, watering (Finished work incl. material and labour) incl. all carriages, complete job. | 45.6 | Cum | - | - |
stage.html
html • 0.03 MB
finance_1023959.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.75 MB
BOQ_1023959.xls
BOQ • 0.28 MB
CORRIGENDUMDATE41Allitems.pdf
PDF • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .