Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹9.2 L
EMD Value
₹92,000
Closing Date
23 Nov 2026, 12:00 pmDue tomorrow
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
EXECUTIVE ENGINEER
C.D.-2, P.W.D., AGRA
Special Repair work of CC and PC work from Ayela bypass road to Vijaypal Singhs house.
2026_CEAGR_1209001_27
2336/10A/2026 dt 27.10.2026
Open Tender
Civil Works
Lump-sum
60 days
AGRA
Please refer Tender documents.
2 documents required · 2 mandatory
₹770
₹92,000
Yes
AGRA
16 Nov 2026
16 Nov 2026
23 Nov 2026
16 Nov 2026
23 Nov 2026
16 Nov 2026
17 Nov 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing, laying, spreading and compacting stone aggregates of 22.4-53 mm sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405.Sr No. 4.8 Ref No. 405/2 (Including Supply of Material, Labour and T&P work complete as per direction of E/C. Including all taxes but excluding GST.) | 34 | Cum | 3,150 | ₹1,07,100 |
| - | Construction of un-reinforced, plain cement concrete pavement thickness as per disign, over a prepared sub base with 43 grade cement or any other type as per Clause 1501.2.2 M-30 (Grade), coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction, expansion, construction and constructionl joints, applying debonding strips, primer, sealant, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14 days, curing compund (where specified) and water finishing to lines and grade as per drawing and technical specification clause 1501. (For Agra) as per SOR Ch. 5 S. No- 12 (Including Supply of Material, Labour and T&P work complete as per direction of E/C. Including all taxes but excluding GST.) | 90 | Cum | 7,610 | ₹6,84,900 |
| - | Construction of Subgrade and Earthen Shoulders - Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. (Including Supply of Material, Labour and T&P work complete as per direction of E/C. Including all taxes but excluding GST.) | 60 | Cum | 100 | ₹6,000 |
| - | Excavation for Structures / Earthwork in excavation for foundation of structures upto 3 m depth as per drawing and technical specification Clause 1104 includding setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. / Rate as per item No.11.1 of Chapter 11 / Rate as applicable for the type of soil/rock are to be taken (Including Supply of Material, Labour and T&P work complete as per direction of E/C. Including all taxes but excluding GST.) | 9.5 | Cum | 400 | ₹3,800 |
| - | Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing.as per SOR Ch.6 S. No. 3 (Including Supply of Material, Labour and T&P work complete as per direction of E/C. Including all taxes but excluding GST.) | 1.6 | Cum | 6,500 | ₹10,400 |
| - | Providing and Laying Reinforced Cement Concrete Pipe NP3 as per design in Single Row / Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1106. /G 350 mm dia (Including Supply of Material, Labour and T&P work complete as per direction of E/C. Including all taxes but excluding GST.) | 7.5 | Rmt | 1,905 | ₹14,287.5 |
| - | Brick Masonry Work in cement mortar in foundation of Head walls complete excluding pointing and plastering as per drawing and technical specification Clause 1109 / (A) Brick Masonry in 1:4 cement mortar / Rate as per item No.11.5 (ii) Chapter 11. (Including Supply of Material, Labour and T&P work complete as per direction of E/C. Including all taxes but excluding GST.) | 5.8 | Cum | 6,350 | ₹36,830 |
| - | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 /III. P.C.C grade M 20 (Mechanical Mix) / (i) Nominal mix 1:2:4. (Including Supply of Material, Labour and T&P work complete as per direction of E/C. Including all taxes but excluding GST.) | 0.08 | Cum | 7,220 | ₹577.6 |
| - | Pointing with cement mortar (1:3) on brickwork in substructure as per drawing and technical specification Clauses 1300 & 2200 as per SOR Ch.6 S. No. 20 13.05 (Including Supply of Material, Labour and T&P work complete as per direction of E/C. Including all taxes but excluding GST.) | 17 | Sqm. | 102 | ₹1,734 |
| - | Plastering with cement mortar (1:4) 15mm thick on brickwork in substructure as per technical specification / Rate as per item no. 12.3 of Chapeter 12 (Including Supply of Material, Labour and T&P work complete as per direction of E/C. Including all taxes but excluding GST.) | 0.95 | Sqm. | 225 | ₹213.75 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 6.76 MB
T1-SR37.pdf
Tender Documents • 5.30 MB
BOQ_2295239.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .