Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.8 LAccepted-AOC | ₹15.8 L | L1 | Accepted-AOC L1 |
| 2 | L2₹17.0 L+₹1.2 L (7.54%)Rejected-Finance | ₹17.0 L+₹1.2 L (7.54%) | L2 | Rejected-Finance L2 |
| 3 | L3₹17.0 L+₹1.2 L (7.84%)Rejected-Finance NEW MAJRI COLLIERY DAFAI NO1 POST SHIVJI NAGAR TAH BHADRAWATI DIST CHANDRAPUR 442503 | BHADRAWATI | CHANDRAPUR | MAHARASHTRA | 442503 | ₹17.0 L+₹1.2 L (7.84%) | L3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | BAPPADITYA PAL L2 | MD. HALIM L3 | MD. KALIM L1 |
|---|---|---|---|---|---|---|
| 1.00Repairing of 11 (Eleven) nos. Isolation Stoppings in R-VI Seam of Khottadih Colliery, Pandaveswar Area. (Inclusive of EPF/CMPF) | ||||||
| 1.01 | P.B. Work (1:8) | 104.28 | Cum | 7,366.53 ₹7,68,181.75 | 7,387.09 ₹7,70,325.75 | 6,852 ₹7,14,526.56 Lowest |
| 1.02 | Plastering (1:6) | 208.56 | Sq. meter | 406.6 ₹84,800.5 | 407.73 ₹85,036.17 | 378 ₹78,835.68 Lowest |
| 1.03 | loading & unloading material from surface to UG | 424 | Tub | 777.97 ₹3,29,859.28 | 780.14 ₹3,30,779.36 | 720 ₹3,05,280 Lowest |
| 1.04 | Transportation of mechanically tub by contructual own person (500m- 1500m) | 212 | Tub | 491.26 ₹1,04,147.12 | 492.64 ₹1,04,439.68 | 457 ₹96,884 Lowest |
| 1.05 | Manually pushing in tub (250m - 300m) | 212 | Tub | 648.58 ₹1,37,498.96 | 650.39 ₹1,37,882.68 | 605 ₹1,28,260 Lowest |
| 1.06 | Lead for carrying materials (31m -45m) | 212 | Tub | 72.93 ₹15,461.16 | 73.13 ₹15,503.56 | 72 ₹15,264 Lowest |
| 2.00 | Total impact of GST for the purpose of CTC | 1 | Nos | - | - | - |
Tender Value
₹15.8 L
EMD Value
₹19,800
Closing Date
25 Jul 2026, 5:00 pmClosed
Area Survey Officer
Office of the General Manager Pandaveswar Area , P.O. Pandaveswar, Dist.-Paschim Bardhaman, West Bengal-713346
Repairing of 11 (Eleven) nos. Isolation Stoppings in R-VI Seam of Khottadih Colliery, Pandaveswar Area
2026_ECL_362042_1
GM/PND/Sur/Ten/26-27/24/62 Dated 13.07.2026
Open Tender
Civil Works - Others
Item Rate
60 days
Khottadih Colliery
Please refer Tender documents.
4 documents required · 4 mandatory
₹19,800
1 Sept 2026
15 Jul 2026
27 Jul 2026
15 Jul 2026
25 Jul 2026
15 Jul 2026
15 Jul 2026 - 18 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Repairing of 11 (Eleven) nos. Isolation Stoppings in R-VI Seam of Khottadih Colliery, Pandaveswar Area. (Inclusive of EPF/CMPF) | |||||
| 1.01 | P.B. Work (1:8) | 104.28 | Cum | - | - |
| 1.02 | Plastering (1:6) | 208.56 | Sq. meter | - | - |
| 1.03 | loading & unloading material from surface to UG | 424 | Tub | - | - |
| 1.04 | Transportation of mechanically tub by contructual own person (500m- 1500m) | 212 | Tub | - | - |
| 1.05 | Manually pushing in tub (250m - 300m) | 212 | Tub | - | - |
| 1.06 | Lead for carrying materials (31m -45m) | 212 | Tub | - | - |
| 2Total impact of GST for the purpose of CTC | |||||
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 2.34 MB
BOQ_374934.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .