Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹37.4 LAccepted-AOC | L1 | Accepted-AOC LOWEST BIDDER | |
| 2 | L2₹37.7 L+₹32,635.36 (0.87%)Rejected-AOC | L2 | Rejected-AOC OTHER THAN LOWEST BIDDER | |
| 3 | L3₹38.4 L+₹1.1 L (2.87%)Rejected-AOC C O GENERAL DAIRY VILLAGE BARAGAON SRI GANGANAGAR 335 001 | GANGANAGAR | RAJASTHAN | 335001 | L3 | Rejected-AOC OTHER THAN LOWEST BIDDER | |
| 4 | L4₹39.8 L+₹2.5 L (6.59%)Rejected-AOC WARD NO 02 LAKHUWALI PO THE PILIBANGAN DISTT HANUMANGARH RAJASTHAN 335803 | HANUMANGARH | RAJASTHAN | 335803 | L4 | Rejected-AOC OTHER THAN LOWEST BIDDER | |
| 5 | L5₹41.0 L+₹3.6 L (9.65%)Rejected-AOC H NO 02 SAGAR ROAD OPPO MKD GIRLS SCHOOL TILAK NAGAR BIKANER 334001 | BIKANER | BIKANER | RAJASTHAN | 334001 | L5 | Rejected-AOC OTHER THAN LOWEST BIDDER |
| Sl No | Description | Qty | Unit | SHREE GURU NANAK CONSTRUCTION COMPANY L5 | BANSAL BROTHERS L2 | Gill Construction Co L4 | PACHAR BROTHERS L9 | PAREEK AND COMPANY L3 | godara construction company L10 | M/S Shree Ram Enterprises L7 | S.K BUILDERS AND ENGINEERS L1 | SHIVA BUILDERS L11 | J AND K CONSTRUCTION CO L6 | BISHNOI BUILDERS L8 | M/S SHRI RAM CONSTRUCTIONS L12 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| .10Notes:- (i) 100 percent/variation of items of nonperishable items of the work as per site requirement of Engineer-in-charge shall be deposited by the L1 bidder within 30 days after placing of work order. (ii) The critical path network shall be submitted by L1 bidder immediately after the acceptance of tender and approved by GE. (iii) The bidders must ensure to visit the site, check relevant documents and makes of materials required to be incorporated under the subject from concern Engineer-in-Charge. (iv) Material obtained from demolition/dismantled and the serviceable material (other than reused in the work) shall be the property of the Govt and shall be removed and deposited in the MES Store Yard without any extra cost to Govt. (v) In case of non-availability of any make mentioned under list of Makes, the L1 Bidder shall obtain non-availability / non-manufacturing certificate from the concern authorised dealers and submitted to Accepting Officer, on such occasion the L1 bidder shall be incorporated Group-X category makes as approved by HQ CE SWC Jaipur in the works prior approval of Accepting Officer. (vi) L1 Bidder shall produce E-way bill alongwith test certificate from OEM / manufacturer for costly items / major items of amount above Rs 50,000/- along with RAR’s and Final Bill. (vii) L1 Bidder shall be maintained an album containing Photos of all the material brought at site and each stage wise work progress and kept at site. Same shall be deposited in Engineer-in-Charge office after completion of work. (viii) The cost of all the above provisions shall be deemed to be included in the quoted rate of bidder, nothing extra shall be paid to the bidder. | |||||||||||||||
| 1.00 | Surface excavation not exceeding 30 cm deep and averaging 15cm deep in soft/ loose soil and getting out complete all as specified and directed by Engineer-in-Charge. | 2,400 | Sqm | 11 ₹26,400 | 10 ₹24,000 Lowest | 75 ₹1,80,000 | 15 ₹36,000 | 20 ₹48,000 | 25 ₹60,000 | 15 ₹36,000 | 30 ₹72,000 | 25 ₹60,000 | 30 ₹72,000 | 30 ₹72,000 | 40 ₹96,000 |
| 2.00 | Excavating in post holes (or similar holes) each not exc 0.50 cum in soft / loose soil, getting out, returning, filling in and ramming earth or broken rubble mixed with earth around, in layers n.exc 25cm, watering, and removing surplus soil to a distance n.exc 50 m and making good surface complete all as specified and directed by Engineer-in-charge. | 26 | Each | 177 ₹4,602 | 100 ₹2,600 | 80 ₹2,080 | 60 ₹1,560 | 80 ₹2,080 | 100 ₹2,600 | 120 ₹3,120 | 200 ₹5,200 | 50 ₹1,300 Lowest | 100 ₹2,600 | 65 ₹1,690 | 500 ₹13,000 |
| 3.00 | Excavating in trenches, n exc 1.5 m wide and n exc 1.5 m in depth; for foundation, etc. or for shafts, wells, cesspits, manholes, pier holes, etc. n exc 10 sq m on plan and n exc 1.5 m in depth and getting out in soft / loose soil & getting out complete all as specified and directed by Engineer-in-Charge. | 73.6 | Cubic Metre | 177 ₹13,027.2 | 150 ₹11,040 | 75 ₹5,520 Lowest | 100 ₹7,360 | 100 ₹7,360 | 120 ₹8,832 | 120 ₹8,832 | 200 ₹14,720 | 100 ₹7,360 | 100 ₹7,360 | 200 ₹14,720 | 280 ₹20,608 |
| 4.00 | Returning, filling in, including spreading, leveling watering and well ramming in layers n.exc 25 cm in soft/loose soil complete all as specified and directed by Engineer-in-charge. | 5 | Cubic Metre | 21 ₹105 Lowest | 100 ₹500 | 55 ₹275 | 100 ₹500 | 100 ₹500 | 100 ₹500 | 60 ₹300 | 100 ₹500 | 100 ₹500 | 40 ₹200 | 200 ₹1,000 | 250 ₹1,250 |
| 5.00 | Removal of excavated soil/ material to a distance not exc 50 metre and depositing where directed at a level not exc 1.50 metre above the starting point complete all as specified and directed by Engineer-in-charge. | 48.6 | Cubic metre | 31 ₹1,506.6 Lowest | 100 ₹4,860 | 55 ₹2,673 | 100 ₹4,860 | 100 ₹4,860 | 100 ₹4,860 | 60 ₹2,916 | 100 ₹4,860 | 150 ₹7,290 | 40 ₹1,944 | 200 ₹9,720 | 250 ₹12,150 |
| 6.00 | M&L for tibba sand filling under floors or in foundations including watering and well ramming ,consolidation in layers not exceeding 25 cm thick complete all as specified specified and directed by Engineer-in-Charge. | 60 | Cubic Metre | 157 ₹9,420 | 200 ₹12,000 | 75 ₹4,500 Lowest | 100 ₹6,000 | 400 ₹24,000 | 200 ₹12,000 | 400 ₹24,000 | 200 ₹12,000 | 200 ₹12,000 | 100 ₹6,000 | 200 ₹12,000 | 290 ₹17,400 |
| 7.00 | M&L for moorum/red bajri filling in floors or pavings, laid in layers not exc 15cm thick including spreading , levelling , watering and well ramming complete all as specified and as directed. | 20 | Cubic Metre | 350 ₹7,000 Lowest | 400 ₹8,000 | 765 ₹15,300 | 1,000 ₹20,000 | 800 ₹16,000 | 400 ₹8,000 | 1,500 ₹30,000 | 1,000 ₹20,000 | 1,800 ₹36,000 | 1,000 ₹20,000 | 900 ₹18,000 | 1,000 ₹20,000 |
| 8.00 | M&L for hardcore of broken stone / boulders gauge not exc. 63mm, deposited, spread and levelled in layers not exc 15 cm thick, watered and rammed to a true surface complete all as specified and directed by Engineer-in-charge. | 215.85 | Cubic Metre | 1,150 ₹2,48,227.5 | 599 ₹1,29,294.15 Lowest | 1,456 ₹3,14,277.6 | 1,200 ₹2,59,020 | 1,000 ₹2,15,850 | 1,250 ₹2,69,812.5 | 1,500 ₹3,23,775 | 1,200 ₹2,59,020 | 1,500 ₹3,23,775 | 1,500 ₹3,23,775 | 1,447 ₹3,12,334.95 | 1,180 ₹2,54,703 |
| 9.00 | M&L for PCC (1:4:8) type D-2 using 40mm graded stone aggregate as in foundation, filling & mass concrete complete all as specified and directed by Engineer-in-charge . | 181.5 | Cubic Metre | 3,131 ₹5,68,276.5 | 3,000 ₹5,44,500 | 2,787 ₹5,05,840.5 | 3,000 ₹5,44,500 | 1,800 ₹3,26,700 Lowest | 2,600 ₹4,71,900 | 2,500 ₹4,53,750 | 2,500 ₹4,53,750 | 2,500 ₹4,53,750 | 2,000 ₹3,63,000 | 2,800 ₹5,08,200 | 3,200 ₹5,80,800 |
Tender Value
₹48.3 L
EMD Value
₹96,600
Closing Date
21 Oct 2025, 6:00 pmClosed
GE (A) SURATGARH
GE (A) SURATGARH MILITARY STATION
GE(A)/SOG-TOKEN-37/2025-26 PROVN OF FOOTPATH/WALKING PATH AND COVERED SHED IN THE AOR OF AGE B/R-I UNDER GE (A) SURATGARH AT SURATGARH MIL STN
2025_MES_732365_1
GE(A)/SOG-TOKEN-37/2025-26
Open Tender
Civil Works
Item Rate
180 days
GE (A) SURATGARH
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
GE(A) SURATGARH
₹96,600
Yes
15 Nov 2025
24 Sept 2025
24 Oct 2025
24 Sept 2025
21 Oct 2025
14 Oct 2025
24 Sept 2025 - 30 Sept 2025
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.40 MB
T37.pdf
Tender Documents • 1.03 MB
BOQ_819989.xls
BOQ • 0.32 MB
corri2T37.pdf
PDF • 0.30 MB
dcT37.pdf
PDF • 0.13 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .