| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹22.0 LAdmitted-Fee/PreQual/Technical/Finance | -16.11% | ₹22.0 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹22.9 L+₹87,523.23 (3.97%)Admitted-Fee/PreQual/Technical/Finance | -12.78% | ₹22.9 L+₹87,523.23 (3.97%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹23.7 L+₹1.6 L (7.28%)Admitted-Fee/PreQual/Technical/Finance | -10.00% | ₹23.7 L+₹1.6 L (7.28%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹23.9 L+₹1.9 L (8.48%)Admitted-Fee/PreQual/Technical/Finance GRAM JAMUA PRAKHAND GIDHOUR | CHATRA | JHARKHAND | -9.00% | ₹23.9 L+₹1.9 L (8.48%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹24.3 L+₹2.2 L (10.1%)Admitted-Fee/PreQual/Technical/Finance | -7.67% | ₹24.3 L+₹2.2 L (10.1%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹26.3 L
EMD Value
₹52,600
Closing Date
26 May 2026, 5:00 pmClosed
E.E., R.D.SPL.DIVISION, CHATRA.
E.E., R.D.SPL.DIVISION, CHATRA.
RDD/SD/CHATRA/11/2026-27/Gr_2 Construction of Guardwall from Manoj Bhuiyan House to Baidhnath Mahto House in Village-Kichto, Panchayat-Kichto, Block-Tandwa.
2026_RDSPL_114287_1
RDD/SD/CHATRA/11/2026-27/Gr_2
Open Tender
Civil Works
Percentage
90 days
TANDWA
PLEASE REFER TENDER DOCUMENT
2 documents required · 2 mandatory
₹5,000
₹52,600
15 Jun 2026
20 May 2026
28 May 2026
20 May 2026
26 May 2026
20 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | G.WALL-E/W in excavation for structure as per drawing and technical specification clause 305.1 including setting out, construction of shoring and brading, removal of stumps and other deleterious material and disposal utp a lead of 50m, dressing of sides and bottom backfilling in trenches with excavated suitable material.
S.O.R. Item No. 3.13 (i) B26:J26 | 418.56 | cum | 55.8 | ₹23,355.65 |
| 2 | Providing and laying boulder apron for bed protection with stone boulders of minimum size and weight as per Table 1300.1, no fragment weighing less than 25 kg laid dry complete as per drawing and technical specifications Clause 1301(14.1)
S.O.R. Item No. 16.04 A | 50.23 | CUM | 1,158.4 | ₹58,186.43 |
| 3 | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203of pcc M15. S.O.R. Item No. 12.08 A case II | 66.97 | cum | 3,754.4 | ₹2,51,432.17 |
| 4 | Stone masonry work in cement mortar in Random Rubble Masonry (1:3) foundation complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203) item no- 12.07(B) | 170.66 | CUM | 3,458.6 | ₹5,90,253.32 |
| 5 | Stone masonry in cement mortar for in Random Rubble Masonry (1:3) substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204 item no- 13.04(A) | 159.56 | CUM | 3,468.8 | ₹5,53,490.4 |
| 6 | Plain/Reinforced Cement Concrete on Top of Wall complete as per Drawing and Technical Specifications.
(P.C.C. Grade M-15)
S.O.R. Item No.13.05 A(p) | 7.4 | CUM | 3,746.2 | ₹27,721.88 |
| 7 | Providing Weepholes in brick masonary , Plain / Reinforced concrete abutement , wing wall , return wall with 100 mm dia AC pipe extending through the full width of the structure with slope of 1V: 20H towards drawing and technical specification Clauses 614, 709, 1204. item no- 15.14 | 185 | NOS | 110.5 | ₹20,442.5 |
| 8 | Pointing with cement mortar 1:3 for sub structure as per technical spcification .item no - 13.02 | 277.5 | CUM | 57.74 | ₹16,022.85 |
| 9 | Earth work in filling of foundation tracnches and back filling of flank in layer not exceding 150mm thick well watered rammed and compacted and finely dressed with suitable earth obtained from excavaion trenches and placed in a suitable profile within a lead of 30M and lift 1.5M complete job as per specification and direcation of E/I. (6.1.16) | 139.52 | CUM | 114.5 | ₹15,975.04 |
| 10 | Carriage of Materials - Cement, a lead of Km22 | 80.72 | MT | 614.2 | ₹49,581.14 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.72 MB
BOQ_154367.xls
BOQ • 0.30 MB
sbd2.pdf
Tender Documents • 0.48 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .