Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.9 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | |
| 2 | L2₹4.0 L+₹1.1 L (37.7%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | |
| 3 | L3₹4.2 L+₹1.2 L (41.9%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | |
| 4 | L4₹4.3 L+₹1.4 L (47.7%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | BALA SEENI AYYALU CONTRACTER L3 | BALAJI CONTRACTER L4 | HARI CONSTRUCTION L2 | MR.TAMIL SELVAN, CONTRACTOR L1 |
|---|---|---|---|---|---|---|---|
| 1.00CONSTRUCTION OF DRAINAGE FROM SUDHAKAR HOUSE TO OHT DRAIN AT SUBBAMMALPURAM STREET IN KALINGAPATTI VILLAGE AND PANCHAYAT | |||||||
| 2.00 | Earthwork excavation in all classes of Soils and Sub soils except hard rock requiring 1 blasting including initial lead and lift, dressing the excavation upto bed level for Foundation as SS 20 B specification etc., complete | 78.48 | Cum | 197 ₹15,460.56 | 250 ₹19,620 | 160 ₹12,556.8 | 127.5 ₹10,006.2 Lowest |
| 3.00 | Plain Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost 2 and conveyance of all materials to site, labour charges for mixing, laying, compacting and curing concrete etc., complete Foundation/Base Concrete. | 19.62 | Cum | 5,334 ₹1,04,653.08 | 5,400 ₹1,05,948 | 5,100 ₹1,00,062 | 4,080 ₹80,049.6 Lowest |
| 4.00 | Supplying and erection Centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab, Lintel, Beam, Column, Sunshade including cost and coveyance of all materials to site and all other incidental charges etc complete Concrete surfaces. | 196.2 | Cum | 547 ₹1,07,321.4 | 600 ₹1,17,720 | 520 ₹1,02,024 | 297.5 ₹58,369.5 Lowest |
| 5.00 | Cement Concrete 1:3:6 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site, labour charges for mixing, laying, compacting and curing concrete etc., complete Concrete masonry Abutment & Body walls. | 29.43 | Cum | 6,087 ₹1,79,140.41 | 6,100 ₹1,79,523 | 6,100 ₹1,79,523 | 4,675 ₹1,37,585.25 Lowest |
| 6.00 | Plastering with Cement Morter 1:5 mix, 12mm thick Smooth finish for Brick, RR masonry surface and other Concrete surfaces inculding cost and 5 conveyance of all materials to site and all other labour charges, incidental charges etc., complete. | 32.7 | Cum | 282 ₹9,221.4 | 300 ₹9,810 | 280 ₹9,156 | 212.5 ₹6,948.75 Lowest |
Tender Value
Refer Docs
EMD Value
₹5,000
Closing Date
24 Sept 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Block development office,BP, Kuruvikulam
Block development officer,BP, Kuruvikulam
BDOKRM/99/2026-A2 /PUGF26-27 /CONSTRUCTION OF DRAINAGE FROM SUDHAKAR HOUSE TO OHT DRAIN AT SUBBAMMALPURAM STREET IN KALINGAPATTI VILLAGE AND PANCHAYAT
2026_RDTN_703704_2
BDOKRM/99/2026-A2
Open Tender
Civil Works
Works
Kuruvikulam
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹5,000
Yes
19 Oct 2026
11 Sept 2026
24 Sept 2026
11 Sept 2026
24 Sept 2026
11 Sept 2026
90 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | CONSTRUCTION OF DRAINAGE FROM SUDHAKAR HOUSE TO OHT DRAIN AT SUBBAMMALPURAM STREET IN KALINGAPATTI VILLAGE AND PANCHAYAT | - | - | - | - |
| 2 | Earthwork excavation in all classes of Soils and Sub soils except hard rock requiring 1 blasting including initial lead and lift, dressing the excavation upto bed level for Foundation as SS 20 B specification etc., complete | 78.48 | Cum | 197.84 | ₹15,526.48 |
| 3 | Plain Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost 2 and conveyance of all materials to site, labour charges for mixing, laying, compacting and curing concrete etc., complete Foundation/Base Concrete. | 19.62 | Cum | 5,334.86 | ₹1,04,669.95 |
| 4 | Supplying and erection Centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab, Lintel, Beam, Column, Sunshade including cost and coveyance of all materials to site and all other incidental charges etc complete Concrete surfaces. | 196.2 | Cum | 547.5 | ₹1,07,419.5 |
| 5 | Cement Concrete 1:3:6 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site, labour charges for mixing, laying, compacting and curing concrete etc., complete Concrete masonry Abutment & Body walls. | 29.43 | Cum | 6,087.9 | ₹1,79,166.9 |
| 6 | Plastering with Cement Morter 1:5 mix, 12mm thick Smooth finish for Brick, RR masonry surface and other Concrete surfaces inculding cost and 5 conveyance of all materials to site and all other labour charges, incidental charges etc., complete. | 32.7 | Cum | 282.33 | ₹9,232.19 |
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
cancelled_1.pdf
pdf • 0.21 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.96 MB
BOQ_845937.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .