Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.0 LAccepted-AOC | 1 | Accepted-AOC L1 | |
| 2 | 2₹1.1 L+₹3,799 (3.68%)Rejected-AOC | 2 | Rejected-AOC L2 | |
| 3 | 3₹1.1 L+₹4,200 (4.07%)Rejected-AOC | 3 | Rejected-AOC L3 | |
| 4 | 4₹1.2 L+₹11,998 (11.6%)Rejected-AOC | 4 | Rejected-AOC L4 |
Tender Value
₹1.4 L
Closing Date
29 Nov 2021, 2:00 pmClosed
Executive Engineer MID Akhnoor/Nowsh
Office of the Executive Engineer MID Akhnoor/Nowsh
Repair to 3.5 cusec discharge HC pump with other allied works at LIS Kotgarhi H/L.
2021_IFC_149414_1
109/MID/AN
Open Tender
Machineries/ Mechanical Engg Items
Item Wise
7 days
AKHNOOR
Please refer Tender documents.
7 documents required · 7 mandatory
₹200
Office of the Executive Engineer MID Akhnoor/Nowsh
Exempted
Office of the Executive Engineer MID Akhnoor/Nowsh
18 Jan 2022
22 Nov 2021
30 Nov 2021
22 Nov 2021
29 Nov 2021
23 Nov 2021
24 Nov 2021
Repair to 3.5 cusec discharge HC pump unit no. 01 installed at LIS Kotgarhi H/L. The job involves decoupling of the pump from motor by unfastening the coupling nuts and bolts by using skilled technicians . The job further involves taking out impeller shaft assembly by unfastening the nuts ,bolts , studs and shifting the same to workshop by using manual labour and mechanical transport . Dismantling of the impeller shaft assembly and separating shaft, impeller and bushes. Rebuilding of impeller by applying new material so the impeller should be balanced then finishing to proper size .P/F of 2-Nos. bearings ( 6309) & 1-No bush as per sample. Re-assembling of impeller shaft assembly & shifting back to L.I.S. Greasing of all the parts. Fitment of impeller shaft assembly in the pump at proper position & closing the top cover by p/f of new nuts, bolts, washers and packing. Job also includes providing / fitting of gland packing , greasing work etc. Thereafter coupling with motor, alignment setting, testing of pump on load. Complete job includes the cost of material, labour charges, to and fro carriage charges, hire charges of tools and tackles etc. Complete Job
Repair to 100HP oil immersed star delta starter of pumping Unit No. 03 installed at site of LIS Kotgarhi H/L. The job involves disconnecting the power supply and taking out the starter out of pump house and shifting the same to workshop by using mechanical transport and manual labour . The job includes complete replacement of worn out G.M nuts and washers, copper fingers, contacts(moving and fixed) , Tripping coil as per sample. Drainage of T.oil and heating of T.oil to make it completely moisture free. Providing and topping up of 7 ltrs. fresh T. oil. Replacement of damaged copper thimbles of cables by p/f of new thimbles duly crimped and taped. Connecting power supply & testing on load. Complete job includes the cost of material, labour charges and other misc. charges at site. Complete Job
Repairs to 100 HP three phase induction motor of pumping unit no. 03 at LIS Kotgarhi H/L. The job involves disconnecting the power supply, unfastening the foundation nuts, bolts and decoupling the motor from the HC pump Carrying motor manually up the the slope and shifting to workshop through mechanical transport. Dismantling of end covers, Extraction of bearings & rotor from motor. Extraction of damaged winding from the stator. Cleaning of stator with compressed air and requisite chemical cleanser/CCL4. Providing and fitting of new good quality winding wire of gauge and size (as per old sample) in the stator together with replacement of damaged /worn out wedges/strips and p/f of f-class insulation, Application of superior quality varnish (Red Becktol etc.) by spray impregnation process and drying the stator winding with hot air circulation process and thereafter checking the IR value. Providing/fitting of 6310 bearing .Re-assembling the motor after greasing. Carriage / transportation of the motor back from workshop to the site of installation at the LIS. Installation / leveling of the motor over the base frame by providing / fitting nut bolts, washers etc., making of electrical connections, replacing worn out nuts, bolts for the electrical connection. Alignment & coupling with pump. Complete testing & commissioning of the pumping unit. Job includes cost of all material, transportation charges, head load and labour charges for skilled / semi skilled labour, hire charges for tools & tackles at the LIS. Complete Job
R K Electrical and Engineering Works
Chargotra Trading Co.
SMART TECH AND CO
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .