Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹15.2 CrAdmitted-Finance NAGPUR MUNICIPAL CORPORATION OFFICE OF THE EXECUTIVE ENGINEER NAGPUR 440001 | NAGPUR | MAHARASHTRA | 440001 | L1 | Admitted-Finance | ||
| 2 | L2₹16.1 Cr+₹91.5 L (6.02%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹18.0 Cr+₹2.8 Cr (18.4%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹18.0 Cr+₹2.8 Cr (18.5%)Admitted-Finance AT HATWAR COMPLEX LAKHANDUR ROAD DESAIGANJ DIST GADCHIROLI 441207 | DESAIGANJ | GADCHIROLI | MAHARASHTRA | 441207 | L4 | Admitted-Finance | ||
| 5 | L5₹18.0 Cr+₹2.8 Cr (18.6%)Admitted-Finance 102 RAVINDRA NAGAR OLD PALASIA INDORE M P | INDORE | MADHYA PRADESH | 452001 | L5 | Admitted-Finance |
Tender Value
₹22.2 Cr
EMD Value
₹22.2 L
Closing Date
23 Apr 2025, 5:00 pmClosed
E. E. N.H.Dn Nagpur
Civil line Nagpur
Performance based Maintenance Contracts (PBMC) Estimate for Upgradation to two lane with paved shoulder from Km 97.487 to Km 137.250 of Nagbhid Armori Section (Pckg III) of NH 353D in the state of Maharashtra for 5 year Maintenance Period
2025_MoRTH_851359_1
NIT-35/EENH/NGP/2024-25
Open Tender
Civil Works
Percentage
60 days
Nagbhid Armori
Pl refer tender document
7 documents required · 7 mandatory
₹11,800
Yes
Pay online in Bharatkosh
₹22.2 L
CE N H Mumbai/S.E.N.H.Circle Nagpur
13 Aug 2025
28 Feb 2025
24 Apr 2025
28 Feb 2025
23 Apr 2025
20 Mar 2025
13 Mar 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.1 | ROUTINE MAINTENANCE ( Lumpsum)
( For Toal Length 60 Months ) | - | Lumpsum | 10,39,14,563 | - |
| 1.2 | INITAL RECTIFICATION WORKS ( Lumpsum)
(To be completed within 06 months from the notice to proceed) | - | LumpSum | 27,50,095 | - |
| 1.3 | PERIODICAL MAINTENANCE WORKS (LumpSum)
(To be completed as decided by the Engineer but overlay of Highway to be completed within 24 Months ( as the case may be) from the date of notice to proceed) | - | LumpSum | 10,23,55,640 | - |
| 1.4 | Emergency Works ( Unit Rates) | - | LumpSum | 86,41,580 | - |
| 1.5 | Charges For Electricity Bill | - | LumpSum | 39,78,454.5 | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tenderdocument.pdf
Tender Documents • 2.24 MB
BOQ.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .