Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.0 LAccepted-AOC | ₹2.0 L | L1 | Accepted-AOC LOWEST BIDDER |
| 2 | L2₹2.0 LRejected-Finance | ₹2.0 L | L2 | Rejected-Finance NOT LOWEST BIDDER |
| 3 | L3₹2.0 LRejected-Finance | ₹2.0 L | L3 | Rejected-Finance NOT LOWEST BIDDER |
| Sl No | Description | Qty | Unit | GOLDEN L1 | P. J. CON L2 | MECON INDUSTRIES L3 |
|---|---|---|---|---|---|---|
| 1.00 | TOTAL | 1 | Nos | 1,66,540 ₹2.0 L | 1,69,590 ₹2.0 L | 1,70,640 ₹2.0 L |
Tender Value
Refer Docs
EMD Value
₹4,000
Closing Date
16 Jan 2026, 1:00 pmClosed
DY.CE(M)/S_D
5, S.N. Banerjee Road Kolkata-700 013
Thorough repairing two numbers of 350 mm dia. NRV for horizontal pump units at CLPS under BDPS.
2025_KMC_981333_1
KMC/BDPS/C-NRV/25-26
Open Tender
MECHANICAL
14 days
BDPS
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹4,000
13 Feb 2026
6 Jan 2026
19 Jan 2026
6 Jan 2026
16 Jan 2026
6 Jan 2026
TOTAL
Item Rate BoQ
BoQ_Ver3.0
Name of the Bidder/ Bidding Firm / Company :
PRICE SCHEDULE (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only )
NUMBER #
Dismantling the valve inspection cover and open out the same by providing necessary arrangement.
Dismantling and taking out the old worn out and defective flap of non-return valve from the valve body by necessary gas cutting by arranging of tools & tackles.
Arrangement of blank flange to restrict the back flow of the water from common delivery line at the time of operation of other pump units.
Arrangement of double flanged M.S short piece in place of the valve body as make shift arrangement to operate the pump in any type of emergency situation.
Necessary acid washing and subsequently heating the edges of CI NRV to remove the rust and scale from its surface.
Repairing of damage portion of NRV flap disk by taking necessary step and procedure.
Necessary grinding up the faces of welded parts to ensure smooth surface.
Mfg supply of two numbers of GM valve bush as per sample.
Repairing and fitting fixing of G.M seat ring for both valve body and valve doors by S.S screw copper rebate etc.
Mfg supply fitting fixing of fabricated hinge to operate the doors of the valve by making of pattern core box mould etc as per sample.
Assembly of whole valve unit by fitting fixing of door, hinge driving spindle, gland bushes etc as per direction.
Fitting fixing of valve inspection cover providing nuts & bolts, rubber gasket, zinc oxide etc.
Painting whole unit by 2 coats of anti corrosive paint of approved quality .
Transportation charges from pumping station to work shop in both ways.
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.15 MB
TD.pdf
Tender Documents • 0.91 MB
BOQ_2393215.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid