| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹7.3 LAccepted-AOC GATE NO 3 DIBRUGARH NEAR LANCO POWER PLANT ANPARA SONEBHADRA | ANPARA | SONEBHADRA | UTTAR PRADESH | L-1 | Accepted-AOC L1 BIDDER | |
| 2 | L-2₹8.6 L+₹95,264 (12.4%)Rejected-AOC | L-2 | Rejected-AOC L2 BIDDER | |
| 3 | L-3₹8.8 L+₹1.2 L (15.0%)Rejected-AOC | L-3 | Rejected-AOC L3 BIDDER |
Tender Value
Refer Docs
EMD Value
₹15,000
Closing Date
27 Sept 2023, 4:00 pmClosed
SE O and MC-IV,ATPS,Anpara
Office of SE O and MC-IV,ATPS,Anpara
Complete dismantling, shifting, erection, commissioning and testing of a ECP Panel with additional job of Complete Overhauling, transformer oil centrifuging and testing of BHEL make HVR transformer unit 2 of 3x210 MW ATPS, Anapra as per scope of wor
2023_RVUNL_833391_1
19/OMC-IV/EMD-II/ATPS/2023-24
Open Tender
Electrical Works
Fixed-rate
365 days
ANPARA
Please refer Tender documents.
3 documents required · 3 mandatory
₹590
DY. CAO CFA AND BO ATPS ANPARA
₹15,000
22 Nov 2023
30 Aug 2023
29 Sept 2023
30 Aug 2023
27 Sept 2023
30 Aug 2023
Amount
Complete dismantling, shifting, erection, commissioning and testing of a ECP Panel of BHEL make model MARK-III with BHEL make ECP model ARECA or ARECA-II or BAPCON or BAPCON PLUS ECP in unit#1,2 and 3 of 3x210 MW ‘A’TPS, Anpara as per scope of work"
Dismantling, shifting, erection, commissioning, testing and transformer oil centrifuging of BHEL make HVR transformer rated 70KV,800mA of Unit#1,2 and 3 of 3x210 MW ‘A’TPS with HVR transformer rated 70KV,1000mA of unit#5 of 2x500 MW ‘B’TPS, Anpara as per scope of work
M/S SCINTECS PROCESS CONTROL
M/S PRAKASH ELECTRICAL WORKS
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .