Tender Value
₹2.3 Cr
EMD Value
₹4.6 L
Closing Date
18 Jun 2026, 11:00 am
Improvements to cess at scattered locations in SSE/Pway/ASK section.Locations: KM.166/750-167/050 RH, 169/200-170/100 RH, 170/500-171/400 RH, 172/300- 173/200 LH, 174/200-900 RH, 175/200-800 RH, 182/400-800 LH, 183/600-900 RH, 183/800-185/600 LH, 184/100-400 RH, 185/500-800 RH, 185/900-186/350 LH, 187/200-187/550 LH, 187/300-550 RH, 187/300-550 RH, 191/000-500 RH, 191/800-192/100 LH)
15MYS26of25-05-26itno03
15MYS26of25-05-26itno03
Open
12 Months
Unknown (Unspecified Location)
₹0
₹4.6 L
25 May 2026
25 May 2026
4 Jun 2026
A-List of items that are covered under USSOR
Item Breakup - A-List of items that are covered under USSOR
88633.25 Specifications and guidelines RDSO/2020/GE: IRS-0004 or latest in running line with suitable soil to the designed profile The work shall include uprooting and disposing of all the vegetation, benching at every 30 Cm vertical height, earthwork in benching portion and compaction u s i n g suitable slope vibratory Rollers/Compactors etc. to achieve prescribed MDD. Note: 1. Payment of cess repairs shall be based on the quantities worked out from the cross sectional calculations only and worked out from the initial ground levels before doing benching and final levels as done for new embankment. The earth work in benching portion shall not be paid extra as the same has been included in the rate. 2. The earth work shall be started only after Completing of the benching and certified. 3. The benching Work shall be done for a maximum height of 1.50 m at any time based on the progress of earthwork starting from toe of the embankment. Loading, leading and unloading of PSC Sleepers of 52Kg / 60Kg by Railway's Rail Dolly/ Dip Lorry to the nominated location under traffic in case road carriage is not possible for different leads and lift up to 5 metres.
1600.00 for every subsequent Km or part thereof and up to 10 Km
40.00 3564.04 x3.0m on cess, placing with released unserviceable PSC sleepers and keeping them at all four sides of refuge and also placing as matting inside the refuge by keeping them in upside down position with a minimum of 14 sleepers including levelling with earth, excavation, all lead and lift, crossing of tracks, leading the sleepers with in a free lead and lift, handling etc., with all contractor's men material complete and as directed by the Engineer-in- charge. Note: Earth-work will to be paid separately under relevant item. Total 23062949.35
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
cess.pdf
ATTACHMENT
GCCAdvanceCorrectionSlipNo5.pdf Correction Slip No 5 to GCC 2022
ATTACHMENT
IRGCCApril2022.pdf
ATTACHMENT
GCCAdvanceCorrectionSlipNo6.pdf Correction Slip No 6 to GCC 2022
ATTACHMENT
GCCACSCORRECTION.pdf
ATTACHMENT
ACS-3toGCC-2022.pdf
ATTACHMENT
JPOforcablecut.pdf
ATTACHMENT
Proforma161718.pdf
ATTACHMENT
GCCACS11.pdf
ATTACHMENT
GCCAdvanceCorrectionSlipNo9.pdf Correction Slip No 9 to GCC 2022
ATTACHMENT
GCCAdvanceCorrectionSlipNo7.pdf Correction Slip No 7 to GCC 2022
ATTACHMENT
GCCAdvanceCorrectionSlipNo10.pdf Correction Slip No 10 to GCC 2022
ATTACHMENT
GCCAdvanceCorrectionSlipNo8.pdf Correction Slip No 8 to GCC 2022
ATTACHMENT
Correction slip to GCC 2022
ATTACHMENT
ACS-4toGCC-2022.pdf
ATTACHMENT
ACS-2toGCC-2022_2022-CE-1-CT-GCC-2022.pdf
ATTACHMENT
GCCAdvanceCorrectionSlipNo5.pdf
ATTACHMENT
GCCAdvanceCorrectionSlipNo6.pdf
ATTACHMENT
GCCAdvanceCorrectionSlipNo9.pdf
ATTACHMENT
GCCAdvanceCorrectionSlipNo7.pdf
ATTACHMENT
GCCAdvanceCorrectionSlipNo10.pdf
ATTACHMENT
GCCAdvanceCorrectionSlipNo8.pdf
ATTACHMENT
Download all tender documents and submit your bid