Loading…
Loading…
Tender Value
₹21.1 Cr
EMD Value
₹12.1 L
Closing Date
6 Mar 2026, 3:30 pmClosed
Bhopal Division- Through Sleeper Renewal TSR(P) 70.445 Kms by Contractual PQRS machine and other associated works under the Jurisdiction of Sr.DEN/Central/Bhopal.
WCR-BPL-W-25-26-C-38-152
WCR-BPL-W-25-26-C-38-152
Open
18 Months
Central, Delhi
₹0
₹12.1 L
12 Feb 2026
12 Feb 2026
A-USSOR items of work
B-DSR items of work
C-SOR items of work
D-NS items of work
Item Breakup - A-USSOR items of work
cum Earthwork in cutting in formation, trolley refuges, side drains, level crossing approaches, platforms, catch water drains, diversion of nallah & finishing to required dimension and slopes to obtain a neat appearance to standard profile inclusive of all labour, materials, plant & machinery, leading all cut spoils either to make spoil dumps or for filling in embankment with leads within 2 km on either side of edge of the cutting(s) including all lifts, ascent, descent, loading, unloading, bailing & pumping out water, if required, clearance of site and all other works incidental thereto for completing the work as per RDSO Specification No. RDSO/2020/GE: IRS-0004 with latest updated correction slips and to the satisfaction of the Engineer-in-Charge. Note: (i) All usable earth arising from cut spoils shall be led into bank formation and Unusable spoils shall be dumped / stacked away from toe of embankment. (ii) All hard rock /and boulders not fit for filling will be stacked by the contractor and will be property of the Railways. (iii)Cut trees shall be property of Railways and to be deposited in the railway godown unless specified otherwise in the Conditions of Contract.
18000.00 soil except rock
cum BHOPAL DIVISION-ENGG/WEST CENTRAL RLY
1600.00 including consolidation, supply of all materials, labour, lead, lift, tools, plants, crossing of tracks as per drawing and technical specification as directed by the Engineer in charge in case loose slush is encountered at site of foundation before casting the foundation or laying the filtering media. Pulling & positioning of rails accurately on cess including supporting rails, providing required gap and squaring at ends for renewal preparation, as directed by Engineer in-charge.
1500.00 on bridge Dismantling and removing rail of all section & length from track, laid on any type & density of sleeper by removing fish plates, fastenings & fish bolts and other materials including stacking all released materials within an average distance of 500 metres as directed by Engineer in-charge. Note: 1.Cutting of rails shall be paid separately. 2.Work to be done under traffic block.
3000.00 Insertion of rails of all types & length in track, laid on any type & density of sleeper to the specified gauge under traffic block. Rates include fastening of rail with sleepers with standard set of fastenings and fixing of fish plates and bolts or, if required, providing gap for w e l d i n g and stacking of released material without infringement within 250m as directed by Engineer-in- Charge. Note: Rail drilling and cutting to be paid separately.
3000.00 Through Sleeper Renewal (TSR) with PSC sleepers involving removal existing sleepers of any type along with fittings from track, insertion of PSC sleepers lying along the cess / formation / slope / toe within 5 metres height with all fittings to specified spacing, gauge and squareness, one round of through packing to make track fit for 20 kmph speed, dressing of ballast to standard profile, all in accordance with the latest provisions of IRPWM and stacking of all released material neatly at specified places within an average lead of 100 m as directed by Engineer in-charge.
21000.00 location of work not involving deep screening BHOPAL DIVISION-ENGG/WEST CENTRAL RLY Replacement of any type of sleepers in track with PSC sleepers lying on cess or at Bridge Approaches for casual renewal at isolated locations with all fittings complete to specified gauge & cross level with contractor's tools including packing and dressing of ballast, as directed by Engineer in- charge. Released materials shall be neatly stacked and handed over at specified location within an average lead of 250 m or near either side of Bridge approaches as directed.
35000.00 track, comprising of renewal of Grooved Rubber Pads, Liners and ERCs without damaging PSC sleepers. Scope includes removal of all fittings, cleaning of rail seat, rail flange at liner seats, and eye of Inserts with wire brushes and applying Grease Graphite Grade "O" (IS:408) to eye of insert and central leg of ERC with contractor's grease of Railway's specification, fixing all fittings in correct position and sealing liner edges with grease all complete including collection and stacking of released materials at nominated locations within SSE Jurisdiction as directed by Engineer-in- Charge. Note: All the fittings will be supplied at SSE/Stores/Depot.
250000.00 sleepers with contractor's grease, conforming to Railway's specifications, labour etc. complete as per procedure prescribed in latest edition of IRPWM.
40000.00 of existing track by using suitable approved chemicals and re-fixing after greasing of insert eye and ERC with Contractor's grease of specified quality as per provisions of IRPWM, as directed by Engineer in-charge. Note: 1.List of Seized ERC along with location shall be prepared after inspection of SSE/P.Way and marked prior to execution of this item. 2. Due care shall be taken to avoid any damage to the sleeper 3.A penalty of 50% of the basic cost of new sleeper in nearest sleeper factory shall be levied on each, if SGCI insert is broken or sleeper gets cracked in the process.
70445.00 curves, cross overs, points & crossings, turn-in curves and at locations as required with contractor's grease graphite grade "O" IS 408 and as directed. BHOPAL DIVISION-ENGG/WEST CENTRAL RLY Lubrication of Plate/Rail screws of Points and crossings, SEJs, Bridges, Curves etc., with greases graphite, including removal of screws carefully without damaging sleepers, cleaning with wire brush etc., both screws and dowel hole, applying grease graphite, refixing the screw and sealing the top and sides of screw with grease graphite to prevent ingress of moisture and corrosion with contractors labour, tools, consumables under traffic condition all lead and lift complete.
10000.00 PSC Sleepers by using gas or any approved methods, duly drilling holes in broken screw and removing existing screw pieces from the holes along with existing dowels and fixing new contractor's dowels (procured from RDSO approved sources) and grouting around dowel with Epoxy materials of approved specification and refixing new Railway's rail/Plate screws duly greasing the screw w i t h specified grease with all contractor's materials, consumables, tools & plants, labour with all lead, lift. Note: 1.Seized screws shall be identified and marked by JE/P.Way and verified at minimum SSE/P.Way In charge) level. 2. Due care shall be taken to avoid any damage to the sleeper 3.A penalty of 50% of the basic cost of new sleeper in nearest sleeper factory shall be levied on each, if sleeper gets damaged in the process.
20.00 SEJ with PSC sleepers under traffic block conditions as per approved drawing including fixing of special size bearing plate, rubber pad and other sleeper / rail fittings, greasing to the fittings, leading rails, sleepers & fittings to site, leading and stacking of released materials within a lead of 250m, cutting of Rails, drilling of holes, fixing of related fittings, providing temporary connection with fishplates till welding of SEJ is done and sleepers shall be given initial packing to make track fit for 20KMPH speed. Note: (1) Rail cutting and hole drilling shall be paid separately. (2) One set comprise complete SEJ on both rails at SEJ. Lifting for increase in ballast cushion of existing points & crossing layouts up to 75mm or part thereof including approach and exit sleepers including one round of through packing, correcting the disturbed sleeper spacing, tightening of fittings, boxing of ballast and ramping out on either side at slope not steeper than 1 in 1000 or as directed. Note: Item will be paid only when lifting is 50mm or more.
Set BHOPAL DIVISION-ENGG/WEST CENTRAL RLY Renewal of CMS Crossing of all rail sections with CMS crossing or with WCMS crossing complete with fastenings including replacement of worn-out rubber pads, liners and ERC, as required. All the released materials shall be stacked at specified location in a countable manner within the lead of 500m & all lift, clear of infringements, crossing of track, if any complete, as directed. with contractor's vehicles, consumables, stores, labour etc. complete, as directed by engineer in- charge. Note: Rail cutting and drilling shall be paid separately under relevant item.
Set Manual deep screening of Plain track/ turnouts as per procedure prescribed in IRPWM, June 2020 or latest, on PSC sleepers of any density and throwing away screened muck arising out of screening on toe of bank or on cess, if low or on spoil banks above top of cutting (including throwing and leveling, if required beyond minimum 5m from the edge of cutting which are up to 3m deep or alternatively carting it up to 50m for disposing it off beyond cutting or platforms) as per direction of Engineer in-charge, including cutting cess for effective drainage on both sides, one round of kutcha packing with screened ballast and further attending to track parameter to make track fit for 20 kmph speed complete in all respect. Note : Payment shall be made for length along main line only for turnouts.
2000.00 sleeper - For Plain Track :
1000.00 sleeper for Turnouts Recoupment of ballast in running line with railway's stone ballast from existing stacks available along alignment either on top of cutting or on cess or at toe of bank by head leads or by any other means and spreading to make up deficiency in the required profile with contractor's labour, tools & plants, as directed by Engineer-in- charge. Note: Payment shall be made based on ballast stack measurement.
2500.00 to 5m BHOPAL DIVISION-ENGG/WEST CENTRAL RLY
30000.00 existing PSC sleeper track to required height / level in stages not exceeding 75mm or part thereof at a time, providing permissible ramp for the track, insertion of moorum / sand / stone ballast uniformly under the existing track and placing the same to safe approved gradient, gauge, cushion including levelling and one round of through packing to allow train movement at restricted speed of 30 kmph for a specified length with all leads & lifts and fixing, marking, painting rail level pegs at every 30m interval. Note: Lifting of track shall be done in stages as per procedure prescribed in latest edition of IRPWM to get the proposed final level as per approved working profile, as directed by Engineer in-charge.
150000.00 procedure prescribed in latest edition of IRPWM including cess dressing on both sides of track. The work will include removing excess ballast from track and putting the same in crib and shoulder by leading to a maximum of 50m including crossing of track, deweeding on ballast section etc and as directed by Engineer-In charge. Manufacturing, supply and stacking of machine crushed Track Ballast conforming to RDSO Specification (IRS- GE-1) with latest correction slips at Railway depot or nominated location. Note: Distance of nearest quarry mentioned in each sub-item is only for the purpose of selecting the items for preparation of estimates/tender schedule, based on the minimum distance between nearest quarry and centre of supply points and will not affect the selection of quarry during physical supply in any way till prescribed specification is met fully.
1000.00 more than 20 km and up to 30 km
9000.00 points & crossings sleeper by reclaiming the worn-out portion to the desired height, grinding of the finished profile for regaining the toe load lost. The reconditioning to be done by using TERRA C I-94 - Electrodes of make L & T, Advani Oerlicon, Diffusion, SHARP - 650, or equivalent approved by RDSO for reconditioning of Cast iron alloys. removing and refixing the required fittings for reconditioning in traffic condition. The cost includes all labour, lead lift, transportation of men and material, cost of consumables, hiring of machinery required etc, complete and as directed by the Engineer-in -charge. BHOPAL DIVISION-ENGG/WEST CENTRAL RLY Picking up of slacks in track of all sleeper density, duly opening up ballast, gauging, alignment, correcting longitudinal & cross levels, packing, boxing of ballast and dressing the same under traffic conditions as per procedure prescribed in latest edition of IRPWM and as directed by Engineer in-charge. Note: In-charge section Engineer should identify locations requiring packing and obtain prior approval of DEN/XEN before execution of the work when there is no Zonal Track Maintenance agency deployed in the section.
TRM First or Second Through Packing of track of all sleeper density including giving a general lift, as desired to eliminate sag after Deep Screening work, lifting of track, lowering of track and major realignment of curves and formation rehabilitation as per procedure prescribed in latest edition of IRPWM. Note: General lift is normally 25 mm and isolated lift may be up to 50 mm.
15000.00 Density of 1660 Third or subsequent Through Packing of track for all sleeper density including picking of slacks, as required after second through packing, subsequent to Deep Screening work as per procedure prescribed in latest edition of IRPWM. This item can also be used after lifting/regrading/realignment works also. Note: General lift is normally 25 mm and isolated lift may be up to 50 mm.
15000.00 Density of 1660 Through packing of points and crossings, derailing switches including gauging, fittings recoupment, ballasting as required, elimination of sag and to the required alignment after Deep Screening as per procedure prescribed in latest edition of IRPWM complete as per direction of Engineer- in-charge. Note: This work shall be operated in exceptional cases with written approval at DEN level when UNIMAT is not available and immediate packing is required to pass train over it.
Set BHOPAL DIVISION-ENGG/WEST CENTRAL RLY Systemic overhauling of track under traffic as per procedure prescribed in latest edition of IRPWM , including removing the crib ballast in 50mm to 75mm depth below bottom of sleeper and complete shoulder ballast without breaking core under the bottom of sleeper, to recover clean ballast by screening on wire mesh and disposing off the muck including throwing & leveling, if required beyond minimum 5m from the edge of cutting which are up to 3m deep or alternatively carting it up to 50m for disposing it off beyond cutting or platforms away from the track, as directed by Engineer in- charge including cutting & making up the cess and ensuring proper drainage slope and then re-inserting cleaned ballast into track and compaction of shoulder and crib ballast by wooden mallet and dressing / profiling ballast as per railway specifications.
40000.00 Density of 1540 sleepers/Km or more De-stressing of LWR/CWR track of any density under traffic line block with contractor's labours, tools, equipments and consumables inclusive of all lead & lift. Activities include cutting of LWR/CWR into convenient panels of specified length, removal of ERCs, liners, greasing of ERCs and liner contact area, lifting rails and keeping them on rollers provided at every 15 sleepers, working out elongation of rail ends depending on prevailing site conditions, pulling rails with the help of Hydraulic Tensor to achieve the desired elongation, cutting rails, as required, removing rollers and placing rail in position, re-fixing ERCs & liners and adjustment of gap at SEJs : Note: (1) Welding of rail joints will be paid separately. (2) Rail cutting and Hole drilling shall be paid separately. (3) Opening and closing of LC if required will be paid separately. (4) As per procedure prescribed in latest edition of IRPWM & CE's Circulars for destressing of LWR/CWR, if any.
300.00 cut rails or with glued joint rail or insertion of glued joint by cutting existing track under traffic condition by cutting rails, refixing with all rail sleeper fastenings and providing required gaps for carrying out welding as an alternative to drilling holes or joining rails with fish plates duly drilling holes as required including stacking of released material and as directed by engineer in-charge. Note: (1) Drilling holes & rail cutting will be paid separately. (2) Transportation of materials to the site of work from supply points, if more than 250m, shall be paid separately. BHOPAL DIVISION-ENGG/WEST CENTRAL RLY Fixing of Wooden Distance Block of size 1.0m x 0.3m x 0.15m between track and platform wall.
500.00 all types of PSC sleepers and fixing the dowels with adhesive of RDSO approved quality for fixing check rails & guard rails, as directed by Engineer in- charge.
35000.00 including disposing of muck beyond Railway boundary as per instructions of Engineer in-charge to keep drains clean and clear in cuttings etc.
120000.00 section and cess up to 3.95m from centre line of track in mid section & station yard, as specified by Engineer in-charge including disposal of branches, bushes outside cess/yard. Anti-corrosive painting of rail outside track on rail bottom, web, foot and fishing plane with two coats of thickness of 100 microns each by bituminous black paint confirms to IS- 9862 of reputed make including surface preparation, as a complete job as per procedure prescribed in latest edition of IRPWM.
250.00 the sleeper where there is separation o f PSC Sleeper along whole periphery and puncturing of apron under the sleepers, chiselling as required including removal of foreign materials from the sleeper trench and dewatering duly filling cement concrete with CONBEXTRA-GP2 or similar, the narrow gaps completely including pouring, finishing, curing to match with the existing C.C.apron surface and slopes complete, labour charges in traffic block and as per the direction of Engineer In charge. BHOPAL DIVISION-ENGG/WEST CENTRAL RLY Carrying out pre-tamping, during tamping and post-tamping work for tamping track with all types of rails, sleepers & sleeper density by various Track Tamping machines, like CSM,DUO/3X Machines which include : (1) Re-adjustment of ballast, heaping- up of ballast, filling-up of cavities in tamping zone by picking ballast from stacks / shoulders / crib of adjoining track up to lead of 50 m to ensure effective packing; (2) Clearing of ballast on sleepers to make them visible to operator, (3) Clearing of ballast over rail foot to facilitate holding of rail by rollers of TTRM; (4) Digging, screening and replenishment of ballast at mud pumping / rounded ballast in sleeper crib location; (5) Tightening of loose fittings immediately before & after tamping; (6) Replacement of broken / missing fittings supplied by Railway; (7) Correcting displaced sleepers to position along with squaring; (8) Re- setting of worked-out / fallen fittings. (9) Removing and re-fixing joggled fish plates & wooden blocks, wherever necessary; (10) Manual consolidation of ballast in crib / shoulders; (11) Removing and refixing of traction bonds during the block in electrified sections (12) Dressing of ballast Note: 1. Tamping blocks are not identical & it may be given at any time either during day or night. 2. Stages of payment a) 30% of the rate will be paid on completion of pre tamping attention, b) Balance 70% of the rate will be paid on completion of post tamping. 3. Recovery at the rate of twice the above applicable rate will be effected in case contractor fails to carry out pre/during/post operation. 4.Payment shall be made only once in irrespective of numbers of TTRM packing round and after restoration of normal speed and restoration of complete ballast profile.
TRM Quick cutting with abrasive rail cutter of all types of rail sections including wear resistant, head hardened rails up to 110 UTS, with contractors tools & plants, equipment, consumable with all lead & lift etc. complete as directed by Engineer in-charge. Abrasive Rail Cutter will be as per RDSO Specification No. TM/SM/1 (Rev. 01 of 2012) with latest status of RDSO; Rail Cutting Wheel Abrasive Disc will be as per RDSO Specification No.TM/SM/2 (Rev. 01 of 2020)
Each BHOPAL DIVISION-ENGG/WEST CENTRAL RLY Drilling holes of 16 mm to 32 mm dia. with Rail Drilling machine including chamfering with appropriate chamfering tools in all types of rail section with contractor's tools & plants, equipment, consumable with all lead & lift etc. complete, as directed by Engineer in-charge. Rail Drilling Machine will be as per RDSO Specification No. TM/SM/3, dated 24.04.1991.
600.00 holes with 7.2mm dia drill twist to correct spacing and location on 60kg/52kg rails on cess or under traffic block with contractor's tools and plant, equipment, consumable, labour etc complete as directed by the Engineer in charge at site.
8500.00 of sleeper by Hydraulic Sleeper Spacer with contractor's tools & plants, equipment, consumable with all lead & lift etc. complete, as directed by Engineer in-charge. Hydraulic Sleeper Spacer shall be as per RDSO's Specification No. TM/SM/17, dated 31.03.1992.
320.00 size into concrete sleeper in-situ for fixing guard rails and check rails on concrete sleeper track at specified locations by concrete sleeper drilling machine with contractor's tools & plants, equipment, consumable with all lead & lift etc. complete, as directed by Engineer in-charge as per RDSO's Specification. Loading of rails of any section and length up to 1 3 metres in Wagons / Truck / trailer including lead up to 50 metres and lift up to 5 metres.
270.00 p o s s i b l e a n d traffic block is not required or in Truck/trailer. Loading of tongue rail, stock rail, switch assembly and crossings of any section and length, SEJ, Glued joint etc. with / without P.Way fittings and fastenings, in Wagon / Truck / trailer including lead up to 250 metre and lift up to 5 metre.
1250.00 p o s s i b l e a n d traffic block is not required or in Truck/trailer. Loading, leading and unloading of 52Kg / 60Kg rail up to 13 metre length by Railway's Rail Dolly / Dip Lorry to the nominated location under traffic with line protection in case road carriage is not possible with different lead with a lift up to 5 metre during block period.
90.00 Km. BHOPAL DIVISION-ENGG/WEST CENTRAL RLY Unloading of rails of any section and length up to 13 metre, in neat manner for Railway usage from departmental material train (DMT) or contractor's / Railway's Truck/trailer including lead up to 50 metre, lift up to 5 metre and stacking in prescribed manner.
Wagon handling is possible and traffic block is not required or in Truck / trailer. Unloading of all type of rails of length 130 metre and beyond from end unloading rake and keep the panels in head-up position at specified distance from centre of track clear from any infringement.. Note: Contractor has to keep Oxygen and Acetylene gas with cutter as standby during the period of work.
MT Loading of 52kg / 60kg PSC normal line and special sleepers up to 2.75 metre length in Depot / Station / Mid-section between stations in a neat manner to departmental material train (DMT) or contractor's / Railway's Truck/Trailer with crane or any other means including crossing of one track with free lead up to 250 metre and lift up to 5 metre, if required with contractor's labour, tools & plants, machinery, consumables etc. Note: In case of any damage to sleeper during loading, penalty @ 50% of the all inclusive cost of sleeper shall be levied.
900.00 p o s s i b l e a n d traffic block is not required or in Truck / trailer Loading, leading and unloading of PSC Sleepers of 52Kg / 60Kg by Railway's Rail Dolly/ Dip Lorry to the nominated location under traffic in case road carriage is not possible for different leads and lift up to 5 metres.
3490.00 Km Loading, leading and unloading of all types of P.Way fittings and all other miscellaneous material except Rails, sleepers, switches, crossings, SEJs and Glued Joints by road vehicles for different leads. Note: Lead shall be the shortest motorable road length between the points of loading and unloading.
120000.00 Km over item no. 172047 BHOPAL DIVISION-ENGG/WEST CENTRAL RLY Transportation of Rails, sleepers, switches, crossings, SEJs and Glued Joints by road vehicles for different leads. Note: 1 . Lead shall be the shortest motorable road length between the points of loading and unloading. 2. Loading and unloading shall be paid extra under relevant items.
3500000.00 Km over item no. 172057 Unloading of 52kg / 60kg PSC line and special sleepers up to 2.75 metre length in Depot / Station / Mid-section between stations in neat manner for Railway usage from departmental material train (DMT) or contractor's / Railway's Truck/Trailer with crane or any other means including crossing of one track and lead up to 250 metre & lift up to 5 metre with contractor's labour, tools & plants, machinery, consumables etc. Note: In case of any damage to sleeper during loading, penalty @ 50% of the all inclusive cost of sleeper shall be levied.
MT Unloading of Switches / Crossings / SEJ Rails / Glued Joints of any rail section and length with or without P.Way fittings & fastenings in neat manner for Railway usage from departmental material train (DMT) or contractor's / Railway's Truck/Trailer with lead up to 250 metre & lift up to 5 metres.
MT Collection, segregation and stacking of various scattered P.Way materials at nominated stacking location with serviceable and un-serviceable ones separately within a lead up to 500 metre and lift up to 5 metre including crossing of track(s) wherever necessary as directed by Engineer-in-Charge.
400.00 similar loose items BHOPAL DIVISION-ENGG/WEST CENTRAL RLY
1135.00 required width from centre line of track for replacement of sleepers by digging o f pucca road surface up to bottom of sleeper, removing of ballast, muck etc., screening of ballast & stacking the same near level crossing and disposing of all debris, replacing the required sleeper duly packing the sleeper to make fit for normal traffic and closing of LC surface with screened ballast to original level by proper ramming and consolidation to smooth motarable surface as directed by engineer in- charge.
520.00 Crossing, blocks, bolts & nuts and stacking these in a countable manner near LC, free from any infringements as directed by Engineer in-charge.
17.00 level crossings with MS brackets, MS packing plates, bolts & nuts, spring washers etc. including lubrication as per approved drawing & specifications, as directed. Rails, MS brackets, packing plates, bolts & nuts, spring washers will be supplied by Railways. Note: One set consists two check Rails. Hiring of machinery for minor miscellaneous works for short duration i n c l u d i n g operator/driver, fuel, lubricants and consumable. The contractor shall arrange all statutory permits as required by rules and regulations prevailing in the area of work. Payment shall be made for actual working hours at site.
3500.00 similar with minimum 1.10 cum bucket capacity
2500.00 Carry crane of 12T capacity for misc. works of handling of material
with transportation or other misc. works. Total 144280745.31
Item Breakup - B-DSR items of work
Item Breakup - C-SOR items of work
and Engineering indicator boards as per relevant para of IRPWM made out of 2.00mm thick aluminium alloys sheet as per IS-736. The boards shall be provided with supporting frame on back side of required size made out of 2 x 25 x 3mm M.S. angles and fixed to the frame with 10mm dia nut bolts and suitable size cleats. The front face of the board shall be of approved colour background created with high intensity retro-reflective encapsulated lens type sheeting having 7 years durability processed with heat lamp vaccum applicator (HLVA) machine. The letters and numbers shall be cut out of cal film. On the back side the board shall be having non-peelable weather proof painted surface consisting of one coat of zinc chromate stoving primer and two coats of Grey stove enamel to IS shed no. 631 french grey all with contractor's material, labour, tools and plants, etc. complete.
20.00 for hauling of rails as per standard drawing with two coats of approved paint.
5.00 rail cutter for cutting of rails. The manufacturer should be RDSO approved firm and the machine shall be as per the technical specifications approved by RDSO.
and petrol/carosene oil driven rail drilling machine for speedy drilling of hole. The manufacturer should be RDSO approved firm and the machine shall be as per the technical specifications approved by RDSO.
and petrol/carosene oil driven weld trimmer for removal of extra metal from rail head by trimming of AT weld.. The manufacturer should be RDSO approved firm and the machine shall be as per the technical specifications approved by RDSO.
4.00 192000.00 D.C. welding generator for resurfacing of points and crosiings by hand welding and also for emergency lighting. The manufacturer should be RDSO approved firm and the generator shall be as per the technical specifications approved by RDSO.
and mechanical track jack non-infringing type for lifting of track. The manufacturer should be RDSO approved firm and the jack shall be as per the technical specifications approved by RDSO. The lifting capacity of jack shall be minimum 8.0 on top and 7.0 on toe. Total 2806372.00
Item Breakup - D-NS items of work
Running track site:- Replacement of old Per sleepers ( TSR) by dismantling existing Track track of all types of sleepers by making KM 13m loose rail panel (or any suitable length panel) with old sleepers & SH rail (for removing existing track) with wider base sleepers / revised wider base sleepers at density of 1660 sleepers per Km assembled with loose rail panel (or any suitable rail length panel of SH rail)in PQRS Depot and placing over ballast properly during traffic block after removing panels of old sleeper and SH rail of 13 m loose rail panel (or any suitable length panel) with the use of contractor & apos;s PQRS Machine by providing auxiliary track with gauge of 3400mm (either with the use of existing rail from existing track or with new rail over metal/ wooden sleepers, to be provided by Railway, 500 Nos./rail km on both rails) and providing fish plates for joining loose SH rail over wider base sleepers / revised wider base sleepers for continuity of track and maintaining track parameters as per Para 522 of IRPWM 2020 to keep the track fit for 30kmph. SH rail over new wider base sleepers / revised wider base sleepers to be replaced with new/earlier existing rail on running track (with replacement of rubber pad, liner & greased ERC and greasing of liner contract area. Grease to be used should be of Servogem RR3 from Indian oil) as soon as loose rail length of track reaches 500m/750m (as per decision of Railway site engineer i.e. SSE/JE/ P Way). Loading of track panel( SH rail over old normal sleeper and tied with ERC) of approximately 13 m length over Railway wagons and unloading of track panels of the length of 13 m ( or any suitable length) and wider base sleeper / revised wider base sleeper will be done during traffic block. TRR with the rail of the length of 250 m to 500m which was removed initially for AT, will have to be done as soon as track of loose rail exceeds 500m length. The whole process will continue till completion of work. Auxiliary Track (AT) will have to be removed with advancement of TSR work as per direction of Railway (SSE/JE/P Way). b) PQRS Depot: - Track panel with SH rail of 13 m or any suitable length over wider base sleepers / revised wider base sleepers will be made with necessary fittings in PQRS Depot. Loading of these panels over Railway Wagons and unloading of released track panels (released from running track) consisting of all types of rails & sleepers from Railway wagon at PQRS depot using Contractor's own portal crane including dismantling and stacking each component of track BHOPAL DIVISION-ENGG/WEST CENTRAL RLY properly at designated locations. Note: This item of Through sleeper renewal with wider base sleeper / revised wider base sleeper is a composite item and all activities as required will have to be done by the Contractor with his/her own PQRS Machine & other machines, tools and plants including all other resources as per requirement of the work ( in PQRS Depot and during traffic block in running track). Railway will provide wagons and locomotive free of cost for loading/unloading and transportation to/from PQRS Depot/ work site (running track) for loose rail panels with normal old sleepers and with wider base sleepers / revised wider base sleepers. Nothing extra will be paid except the rate as mentioned against the item. Railway will also provide metal/wooden sleepers required for AT, free of cost. Various activities which are involved in TSR work are elaborated in "sequence of activities provided with tender schedule". (For Final product and Notes refer Annexure-A).
Longitudinal Gas Cutting of flanges Metre 90R/52/60 kg rails/side pan of BFR etc. With all labour & material etc complete.
Battery Operated Chamfering Kit as per Numbers RDSO specification TM/SM/336 enclosed.Make: Kevin or lakshmi or equivalent Accepted firm offer make: CHAKRADHAR INDUSTRIES LLP.
Electronic Toe Load Measuring Device Numbers with improved toe lifting clamp (suitable for all types of ERC's toe load up to 2000 kg), IP 65 certificate of environment protection (Dust and water splash proof), made of rust free stainless steel body & leg and equipped with rechargeable long back-up battery. Model no. PE/ETLM/4G of PUJARA make. (Warranty Period : Upto 30 months from the date of delivery).
Supply of rail cutting wheel (Abrasive Numbers disc)specification NoTM/SM/2(01 of 2020) Incl. GST.
Supply of Continuous Rail Temperature Numbers Recorder with facilities to measure and record Rail temperatures upto 18 months on hourly basis. It is having On- Board Programming facility to modify the operations i.e. Sampling interval, max/min. Temperatures, date and time settings. Having LCD display hence, nullify the need of computer but with compatibility to access the data into excel files but without printer. Model LT-7 (RDSO approved).
Rechargeable long range LED Dragon Numbers search Light 10 Watt, Model AEL - 10W - LED - 5 Mode, Make : ASKA, Technical specification as per Annexure enclosed. BHOPAL DIVISION-ENGG/WEST CENTRAL RLY
Preparing of subgrade for making Sqm pathway by excavating earth upto 35 cm depth, dressing/ levelling, watering and consolidation including making good the undulations, disposal of surplus earth with lead upto 50 meter, setting of Railway's released Broad Gauge PSC sleepers of 52/60 Kg rails as per instruction and entire satisfaction of Engineer in charge packing & filling of voids between sleepers by stone dust ( Stone dust to be paid seperately) with all contractor's labour, tools & plants etc as requires as a complete job.
Supply of Bush Cutter with Trimmer Each head , Engine GX35 , Engine type 4- stroke , overhead cum single cylinder , Displacement - 35.8 cc (2.2 cum-in) Max HP-1.6 HP , starting system recoil starter Honda make or similar .(As per specification of Honda UMK 435 T model U2ST). Total 74135375.60
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
TDGCCMay25.pdf
Annualcont.turnoverformatAnn.VIB.pdf
TrackWorkSpecialConditions.pdf
SplConditionsofContractPQRS.pdf
AnnexureB.pdf
ScopeofWork.pdf
PublicProcurementOrder.pdf
AnnexureA_1.pdf
AnnexureVIforBidcapacity.pdf
Download all tender documents and submit your bid