EXECUTIVE ENGINEER JAL SHAKTI MECH SGR
OFFICE OF THE EXECUTIVE ENGINEER JAL SHAKTI PHE MECHANICAL DIVISION SRINAGAR
Shifting of 1MVA Transformer and electrical repair works at Water Supply Scheme Pokhribal Stage 2nd
2023_PHE_206563_3
PHE/MECH/e-NIT-58 of 03/2023
Open Tender
Electrical and Maintenance Works
Item Rate
7 days
Pokhribal
As per NIT
2 documents required · 2 mandatory
₹50
Yes
EXECUTIVE ENGINEER JAL SHAKTI MECH SGR
Yes
8 Mar 2023
1 Mar 2023
7 Mar 2023
1 Mar 2023
6 Mar 2023
1 Mar 2023
Amount
A) Shifting of 1MVA transformer from old damaged bed to newly casted concrete bed at Water supply scheme. The lifting and shifting of transformer shall be carried using departmental crane. The job includes disconnecting the transformer from both HT and LT side before lifting/shifting. The job further includes uninstallation of Link set (3 Pcs) from the H-frame of the sub-station and then installing the same on the opposite site, so as to ensure proper spacing between all the three phases of the transformer and to facilitate safe operation of the link set. The job further includes replacement of worn out fuse set by way of providing, fitting, installation and testing of new 11KV Horn Gap Fuse set (3 Phase) on the H-frame. The job also includes providing, fitting, installation and testing of new Gapless Surge Arrestor, 9kV, 10kA, Lightening Arrestor with polymer, Stn. Type (1 set). The job also includes painting the H-frame with 2 coats of silver paint. The job further includes cleaning the area and laying and stretching the existing cables from LT side, so that connections can be made conveniently from both LT and HT side of the Transformer. B) The job also includes providing and fitting of 3 no. 630mm Copper thimbles in the Change Over Switch of the scheme and 5 No. 12 Watt Led Lamps along with holders inside the premises of scheme. A) Shifting of 1MVA transformer from old damaged bed to newly casted concrete bed at Water supply scheme. The lifting and shifting of transformer shall be carried using departmental crane. The job includes disconnecting the transformer from both HT and LT side before lifting/shifting. The job further includes uninstallation of Link set (3 Pcs) from the H-frame of the sub-station and then installing the same on the opposite site, so as to ensure proper spacing between all the three phases of the transformer and to facilitate safe operation of the link set. The job further includes replacement of worn out fuse set by way of providing, fitting, installation and testing of new 11KV Horn Gap Fuse set (3 Phase) on the H-frame. The job also includes providing, fitting, installation and testing of new Gapless Surge Arrestor, 9kV, 10kA, Lightening Arrestor with polymer, Stn. Type (1 set). The job also includes painting the H-frame with 2 coats of silver paint. The job further includes cleaning the area and laying and stretching the existing cables from LT side, so that connections can be made conveniently from both LT and HT side of the Transformer. B) The job also includes providing and fitting of 3 no. 630mm Copper thimbles in the Change Over Switch of the scheme and 5 No. 12 Watt Led Lamps along with holders inside the premises of scheme. A) Shifting of 1MVA transformer from old damaged bed to newly casted concrete bed at Water supply scheme. The lifting and shifting of transformer shall be carried using departmental crane. The job includes disconnecting the transformer from both HT and LT side before lifting/shifting. The job further includes uninstallation of Link set (3 Pcs) from the H-frame of the sub-station and then installing the same on the opposite site, so as to ensure proper spacing between all the three phases of the transformer and to facilitate safe operation of the link set. The job further includes replacement of worn out fuse set by way of providing, fitting, installation and testing of new 11KV Horn Gap Fuse set (3 Phase) on the H-frame. The job also includes providing, fitting, installation and testing of new Gapless Surge Arrestor, 9kV, 10kA, Lightening Arrestor with polymer, Stn. Type (1 set). The job also includes painting the H-frame with 2 coats of silver paint. The job further includes cleaning the area and laying and stretching the existing cables from LT side, so that connections can be made conveniently from both LT and HT side of the Transformer. B) The job also includes providing and fitting of 3 no. 630mm Copper thimbles in the Change Over Switch of the scheme and 5 No. 12 Watt Led Lamps along with holders inside the premises of scheme.
M/S MIR ELECTRICAL AND MECHANICAL WORKS
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .