Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹37.6 LAccepted-AOC NOT AVAILABLE | ₹37.6 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹38.4 L+₹75,662.21 (2.01%)Rejected-AOC NOT AVAILABLE | ₹38.4 L+₹75,662.21 (2.01%) | L2 | Rejected-AOC Rejected |
Tender Value
₹37.3 L
EMD Value
₹37,300
Closing Date
25 Mar 2026, 3:00 pmClosed
ZONAL OFFICER VIII
NO-36 B,PULLA AVENUE ,SHENOY NAGAR ,CHENNAI-600030
PROPOSED CONSTRUCTION OF BOV SHED 50 NOS FOR 104 AND 105 AT NEW AVADI ROAD INFRONT OF BURIAL GROUND LOCATED IN D-102,U-22, Z-8.
2026_CoC_674579_1
Z.O.VIII.C.NO.E1/1196/2026
Limited
Civil Works
Works
270 days
GREATER CHENNAI COPORATION ZONE-VIII
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹37,300
20 Aug 2026
13 Mar 2026
26 Mar 2026
13 Mar 2026
25 Mar 2026
13 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation for foundation by Mechanica...2.40m Footing Depth. (including Refilling charges) | 25 | CUM | 368.55 | ₹9,213.75 |
| 2 | Supplying and filling in foundation, basement, etc...tion and as directed by the departmental officers. | 56 | CUM | 391.95 | ₹21,949.2 |
| 3 | Providing and laying, spreading and compacting gra...es etc., complete as per clause 406 of MORTH Rev-5 | 78 | CUM | 2,709.1 | ₹2,11,309.8 |
| 4 | Plain Cement Concrete 1:2:4 (one cement, two crush...departmental officers.-Mixing by mechanical means | 84 | CUM | 7,255.21 | ₹6,09,437.64 |
| 5 | Brick work in following Cement Mortar using best q...Executive Engineer in charge. In Cement Morter 1:3 | 15 | CUM | 8,192.9 | ₹1,22,893.5 |
| 6 | Plastering the surface of walls with Cement Mortar...d as directed by the departmental officers. (Wall) | 131 | SQM | 317.59 | ₹41,604.29 |
| 7 | Painting New Plastered Wall Surface with Two finis...ed by the Executive Engineer before use on works.) | 131 | SQM | 201.05 | ₹26,337.55 |
| 8 | Supplying, fabricating and placing in position Rib...t and binding wire) Above plinth / Basement level | 4,274 | KGS | 98.7 | ₹4,21,843.8 |
| 9 | Providing and laying in position, standardised con...the Department for the excess usage of materials). | 57 | CUM | 8,015.86 | ₹4,56,904.02 |
| 10 | Supplying and fixing Mild Steel grills for windows...ions and as directed by the departmental officers. | 430 | KGS | 108.89 | ₹46,822.7 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.09 MB
BOQ_810792.xls
BOQ • 0.29 MB
TENDERDOCUMENT.pdf
Tender Documents • 0.95 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .